How this estimate is calculated
Aeration Sizing Calculator · calculation version 3.0.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Translate a pond oxygen demand into an indicative installed aeration power range.
How it was calculated
- oxygen demand is converted to an aeration duty using the selected standard aeration efficiency (kg O₂ per kWh) and a site derating factor.
- installed_kW = required_kg_O2_per_h ÷ (SAE_kg_O2_per_kWh × derating)
Where each value comes from
- Standing biomass
- Buyer input
- Aeration efficiency
- Requires supplier confirmation
What the outputs mean
- Indicative installed aeration power range
- Indicative unit count for the selected device class
Engineering assumptions
- Standard aeration efficiency is quoted by manufacturers under clean-water test conditions; field performance is lower.
- Derating for salinity, temperature and pond geometry is a planning allowance only.
Limitations
- Does not model oxygen stratification, night-time minima or circulation pattern, all of which change real aerator placement and count.
What must be confirmed before you build
- Manufacturer field-test data for the specific aerator
- Aerator layout and circulation design
- Backup-power sizing for aeration
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.