Ammonia (TAN)
Total ammonia nitrogen — a toxic nitrogen compound excreted by fish that must be converted to nitrate by a biofilter in RAS systems.
42 technical, procurement and financing terms used every day on aquaculture project sites — curated by FishMatch Group, the specialized aquaculture platform within the Global B2B Group ecosystem.
34 core terms have their own page: definition, why it matters, when it affects procurement, a worked example, FAQs and the calculators or categories they connect to.
An aquaculture RFQ (Request for Quotation) is a structured document that describes a fish or shrimp farming project in enough technical detail for suppliers to price the same scope. It states species, system type, production target, water conditions and the equipment packages required.
Shrimp farming is the controlled production of shrimp — most commonly Litopenaeus vannamei — in ponds, lined ponds, biofloc systems or recirculating systems. Production is organised in cycles from post-larvae through nursery to grow-out.
Fish farming is the controlled production of finfish in ponds, cages, tanks, raceways or recirculating systems. Species, water temperature and market size determine the system and the equipment package.
A Recirculating Aquaculture System (RAS) treats and reuses most of its water — typically 90–99% per day — using mechanical filtration, biological nitrification, oxygenation and CO₂ removal. It allows production independent of climate and with very low water intake.
Cage farming grows fish in net pens suspended in a lake, reservoir or the sea. The cage structure, net and mooring system are engineered to the site's depth, current and wave exposure.
Pond farming produces fish or shrimp in earthen or lined ponds, from extensive systems with little intervention to intensive lined ponds with heavy aeration. Water exchange, aeration and pond preparation define the intensity level.
A hatchery produces eggs, larvae, post-larvae or fingerlings from broodstock for supply to nurseries and grow-out farms. It combines incubation, larval rearing, water treatment and often live feed production.
A nursery is the intermediate stage between hatchery and grow-out, where juveniles are grown in a controlled environment to a larger, more robust transfer size. It is common in shrimp and increasingly in finfish.
The grow-out system is where juveniles are raised to market size — in ponds, cages, tanks, raceways or a recirculating system. It represents most of the biomass, most of the feed and most of the equipment cost.
Stocking density is the live weight of fish or shrimp per unit of water volume (kg/m³) or pond area (kg/m² or t/ha). It is stated either at stocking or, more usefully for equipment sizing, at maximum biomass.
Biomass is the total live weight of stock held in a system, expressed in kilograms or tonnes. Standing biomass is the weight present at one moment; peak biomass is the maximum reached during a cycle.
FCR is the kilograms of feed required to produce one kilogram of live weight gain. A lower FCR means more efficient feed use; it varies by species, feed quality, temperature and management.
Aeration is the transfer of oxygen into the water and the removal of dissolved gases, using paddlewheels, diffused air, aspirators, injectors or pure oxygen systems. It is measured by oxygen transfer rate and energy efficiency.
Oxygen demand is the amount of dissolved oxygen consumed per unit time by the stock, the biofilter and the organic load in the system. It rises with biomass, feeding rate and water temperature.
Water flow is the volumetric rate of water moving through a system, expressed in m³/h or as turnovers per hour. In recirculating systems it determines how quickly waste is removed and oxygen replenished.
Pumps move water through intake, recirculation, drainage and treatment loops. They are specified by flow (m³/h), total dynamic head (m), fluid type, duty hours and material class.
Filtration removes solids and converts dissolved waste in an aquaculture system. Mechanical filtration (screens, drum filters, bead filters) removes particles; biological filtration converts ammonia to nitrate through nitrification.
Water treatment in aquaculture covers two distinct directions: treating incoming water so it is safe for stock, and treating outgoing water so it meets discharge limits. Each has its own equipment and design basis.
Aquaculture monitoring uses sensors, loggers and connectivity to measure water quality continuously and raise alarms. IoT systems may also control equipment such as aerators, pumps and feeders.
A feeding system distributes feed to the stock — manually, with automatic feeders, with blowers or from a feed barge. It includes storage, conveying, dosing and, increasingly, feedback control.
Biosecurity is the set of structures, protocols and equipment that keep pathogens out of a farm or hatchery and prevent their spread inside it. It covers water treatment, zoning, quarantine, disinfection and staff movement.
Aquaculture ROI is the return generated by a project relative to the capital invested, driven by CAPEX, OPEX (feed, energy, labour), survival, FCR, cycle count and achieved farmgate price.
Supplier-neutral matching means routing a buyer's request to suitable suppliers based on the project specification rather than on a fixed commercial relationship with any one manufacturer. The platform does not manufacture or resell the equipment it routes.
A project financing partner is an independent external institution or investor that may consider funding part of a large project. FishMatch does not provide loans, credit, interest rates, financing commitments or financial advice.
A biofilter is the biological treatment stage of a recirculating aquaculture system. Bacteria growing on a media surface convert toxic ammonia excreted by the stock into nitrite and then into far less toxic nitrate, allowing the same water to be re-used.
The cold chain is the unbroken temperature-controlled path from harvest through chilling, processing, freezing, storage and transport to the buyer. In aquaculture it starts at the pond or tank edge, not at the processing plant door.
Feed formulation is the specification of an aquafeed's composition — protein, lipid, carbohydrate, fibre, ash, vitamins and minerals — and its physical form, such as pellet size, water stability and whether it sinks or floats. Formulation is matched to species, life stage and production system.
Pond design is the engineering layout of an aquaculture pond farm: pond size and depth, embankment and lining, inlet and outlet structures, water supply and drainage, aeration layout and harvest access. It converts a production target into a buildable site plan.
Water quality is the set of measured conditions the stock lives in: dissolved oxygen, temperature, pH, alkalinity, ammonia, nitrite, nitrate, carbon dioxide, salinity, suspended solids and, in marine systems, specific ions. Each parameter has a safe band per species and life stage.
Shrimp count is the number of shrimp in a unit of weight, written as a range such as 21/25 or 41/50. A lower count means larger shrimp. The unit may be per pound (common in the United States) or per kilogram, so the same label can describe different sizes.
Shrimp product forms describe how much of the animal has been removed before freezing: head, shell, vein and tail. The abbreviations are trade shorthand, so the same count can describe very different products depending on the form.
Glazing is a thin protective layer of ice applied to frozen fish or shrimp by spraying or dipping, to limit drying and oxidation in cold storage. The ice adds weight, so glaze must be separated from the weight of the seafood itself.
IQF means each piece — a shrimp, fillet or portion — is frozen separately so pieces stay loose in the pack. Block frozen product is frozen together in a block, usually with water, and must be thawed as a unit.
A seafood health certificate is an official document, signed by the competent authority of the exporting country, confirming that a consignment meets the destination's public-health conditions. Many destinations prescribe the certificate model to be used.
Total ammonia nitrogen — a toxic nitrogen compound excreted by fish that must be converted to nitrate by a biofilter in RAS systems.
Aquaculture procurement is the structured sourcing of equipment, technology and EPC services for aquaculture projects — from single subsystems (biofilters, aerators, RAS loops) to full turnkey farms, hatcheries and processing plants.
Aquaculture project development is the structured process of taking a commercial fish, shrimp or processing project from concept to operations — covering site, permits, engineering, CAPEX/OPEX modelling, financing, EPC and commissioning.
Aquaculture Stewardship Council — third-party certification standard for responsibly farmed seafood.
Best Aquaculture Practices — Global Seafood Alliance certification covering farm, hatchery, feed mill and processing plant.
The nitrification loop in a RAS that converts ammonia to nitrite and then nitrate using bacteria on a plastic media bed.
Total live weight of fish or shrimp in a system, expressed in kg or tonnes.
The set of protocols, structures and inputs designed to keep pathogens out of a farm or hatchery.
Bill of Quantities — the itemized list of equipment, materials and works used in an RFQ or EPC contract.
Adult fish or shrimp kept to produce eggs, larvae or fingerlings.
Marine or lake production system where fish are grown in floating net pens.
Capital expenditure — the up-front investment to design, build and commission a project.
The temperature-controlled chain from harvest through processing, storage and export.
Commercial aquaculture is the industrial-scale farming of aquatic species — primarily fish, shrimp, molluscs and seaweed — for sale into food, feed or export markets. It uses engineered production systems (ponds, cages, RAS or hybrid) with defined biosecurity, water management and quality controls.
Feed Conversion Ratio — kilograms of feed required to produce one kilogram of live fish or shrimp.
Juvenile fish, typically 5–20 grams, ready to be transferred from a hatchery to a grow-out farm.
A fish hatchery is a specialized aquaculture facility that produces eggs, larvae and juveniles (fingerlings, post-larvae or smolts) from managed broodstock, for stocking into grow-out farms.
Internal Rate of Return — the annualized return of a project's cash flows.
Letter of Intent — a non-binding document expressing commercial interest before a contract is signed.
Two-step biological conversion of ammonia → nitrite → nitrate performed by the biofilter of a RAS.
A contractual buyer for the farm's harvest, often a processor, exporter or retailer.
Operating expenditure — ongoing costs of running a facility (feed, energy, labour, maintenance).
Programmable Logic Controller — the automation hardware used to run pumps, aerators and dosing systems.
Early juvenile shrimp (PL10–PL15) transferred from a hatchery to a nursery or grow-out pond.
The structured process of specifying, sourcing and contracting equipment and services.
Recirculating Aquaculture System — indoor facility that treats and re-uses 90–99% of its water.
A RAS facility is an indoor aquaculture plant that recirculates 90–99% of its water through mechanical filtration, biological nitrification, degassing, oxygenation and disinfection. It enables year-round production near consumption markets, independent of climate, tides or open water.
Request for Quotation — the formal document sent to suppliers to obtain priced offers.
Supervisory Control and Data Acquisition — the monitoring and control software layer above the PLCs.
Seafood processing is the industrial transformation of harvested fish, shrimp and shellfish into chilled, frozen, canned or value-added products for domestic or export markets, under HACCP, ASC, BAP or ISO 22000 food-safety systems.
A shrimp farm is a commercial facility that grows shrimp — primarily Litopenaeus vannamei (whiteleg) or Penaeus monodon (black tiger) — from post-larvae to harvest, in earthen ponds, lined ponds, biofloc systems or indoor RAS.
Live weight of fish or shrimp per unit of water volume (kg/m³) or area (kg/m²).
Water treatment using ultraviolet light to inactivate bacteria, viruses and parasites in the RAS loop.
Litopenaeus vannamei — the whiteleg shrimp species that accounts for the majority of global shrimp production.
Short answer
Submit one structured request for Glossary. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
Submit one structured request for Glossary. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.
No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.