Aquaculture glossary

Cage farming in aquaculture procurement

Short answer

What is cage farming?

Cage farming grows fish in net pens suspended in a lake, reservoir or the sea. The cage structure, net and mooring system are engineered to the site's depth, current and wave exposure.
Why it matters:
Cage equipment is specified from site conditions, not from tonnage.
Affects:
It affects frame class, net material and mesh, mooring design, feeding method and service craft requirements.

Why it matters

Cage equipment is specified from site conditions, not from tonnage. A cage rated for a sheltered lake is a different product from one rated for an exposed coast.

When it affects procurement

It affects frame class, net material and mesh, mooring design, feeding method and service craft requirements.

Example

Two suppliers quoting '30 m circumference cages' can be pricing very different structures if one assumes a 1 m and the other a 3 m design wave height.

Is FishMatch right for your project?

When is FishMatch a good fit for a buyer?

FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for cage farming and related aquaculture procurement decisions. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.

Best for

  • ·Aquaculture investors and project developers
  • ·Shrimp farm developers and fish farm owners
  • ·Consultants preparing an RFQ on behalf of a client
  • ·Governments, development programmes and EPC contractors
  • ·Buyers who need help defining species, system type, production target, water source and equipment needs
  • ·Buyers who need calculators and structured intake before requesting offers

Not ideal for

  • ·Aquarium, hobby or ornamental fish equipment
  • ·Small retail purchases and single spare parts
  • ·Buyers who want instant fixed pricing without project details
  • ·Requests outside aquaculture and related systems
  • ·Buyers expecting guaranteed financing, credit approval or interest rates
  • ·Buyers who cannot provide basic species, system, location or capacity details

FAQ

Water depth, current speed, design wave height, wind fetch and seabed type, plus target biomass per cage.

Often not. Mooring hardware, survey and installation are frequently separate, which is why scope must be stated explicitly.

Where this applies on FishMatch

Turn the definition into a request

Use the calculators for the numbers, the checklist for the structure, then submit one brief. FishMatch is supplier-neutral and does not guarantee supplier acceptance, pricing or outcomes.

Related terms

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.