Country guides

Aquaculture projects and farmed seafood buyer markets

Plan a fish or shrimp farm project, or prepare a separate farmed seafood sourcing brief. Country tools use stated assumptions; available languages and evidence vary by guide. Seafood import context does not establish farm demand, supplier coverage or a quoted price.

Planning a farm? Start with the full aquaculture project guide — planning, budget, approvals, site and system choice.

Island or remote site? Island and remote aquaculture markets covers the Faroe Islands, Caribbean, Pacific and Indian Ocean locations, where freight, power and water supply shape the project.

Offshore aquaculture net pens and a work boat at sea

FishMatch Group · Buyer-country briefings

Buying seafood or building an aquaculture project?

Seafood import data helps scope a destination, not a purchase or an equipment investment. These eight market briefs separate food procurement from farm, hatchery, pond and RAS planning. Research reviewed 19 October 2026; figures below retain their source periods and definitions. They are not live prices, available stock or a ranking of investment opportunities.

Comparable baseline: WITS/UN Comtrade reporter imports from World, 2024, HS chapter 03 in the displayed HS 1988/92 nomenclature. Values are converted from thousands of US dollars to US$ million. This excludes prepared/preserved seafood HS1604/1605 and fishmeal HS230120; it is not a complete edible-seafood basket. Chapter quantities are unavailable, so no aggregate import tonnes or customs-derived farmed share are inferred. National/AAFC/FAS series below have different scopes and retain their own currency. 2024 is the common comparison year, not a claim that every authority lacks newer data.

Japan: destination and specification checks

WITS/UN Comtrade 2024 HS03 imports: US$8,972.58 million; leading reported value partners: Chile, China, United States, Russia and Norway. Japan’s Fisheries Agency separately reports 2024 fishery-product imports of JPY 2,061.3 billion and 2.16 million tonnes (product weight). That broader national measure is not the HS03 baseline.

Product scope: Salmon/trout, shrimp and bonito/tuna are leading national import groups; shrimp origins include India, Vietnam and Indonesia. Neither salmon nor shrimp customs totals certify farmed origin.

Buyer task: For wholesale or retail salmon and shrimp, lock the production method, trim/count basis and chilled/frozen receiving window before asking for offers. Japan’s national data is not evidence of a FishMatch export-approved producer.

South Korea: destination and specification checks

WITS/UN Comtrade 2024 HS03 imports: US$3,984.96 million; leading reported value partners: China, Russia, Norway, Vietnam and United States. Agriculture Canada’s 2024 fish-and-seafood headline is Can$7.9 billion; the detailed table is CAD7,961.8 million and 1,406.4 million kg. The aggregate includes fishmeal/pellets unfit for human consumption and is not an edible-only or HS03 total.

Product scope: 2024 frozen shrimp/prawns: CAD658.3 million and 64.5 million kg in the AAFC series (HS030617); biological species and farmed origin are not identified by that heading. Frozen pollock, octopus and squid are separate categories, not farmed-fish evidence.

Buyer task: Processors should specify thawing/packing requirements, net weight and permitted treatments; foodservice buyers need portion/count and receiving specifications. Confirm current importer and product eligibility separately.

Singapore: destination and specification checks

WITS/UN Comtrade 2024 HS03 imports: US$766.82 million; leading reported value partners: Malaysia, Norway, China, Vietnam and Japan. SFA says Singapore imports more than 90% of its overall food supply, not specifically seafood. Its 2024 seafood supply is 128,500 tonnes, with Indonesia, Malaysia and Vietnam the top sources by that supply measure. This is total supply, not import tonnage, and differs from the HS03 value ranking.

Product scope: SFA’s supply measure covers live, chilled and frozen seafood. Local farms supplied around 6% of seafood consumption; this must not be converted into an assumed customs import ratio.

Buyer task: Importers and distributors should distinguish local sale from re-export, confirm receiving/cold storage and importer obligations. The separate Singapore Aquaculture Plan is policy context, not an equipment order or an offtake guarantee.

China: destination and specification checks

WITS/UN Comtrade 2024 HS03 imports: US$15,751.88 million; leading reported value partners: Ecuador, Russia, India, Canada and Vietnam. USDA’s 2025 China Fishery Products Report separately cites 2024 seafood imports of US$17.7 billion. Its broader code scope is not reconciled to HS03 here, so the measures are not interchangeable.

Product scope: The report identifies HS0303 frozen fish near 2.38 million tonnes and HS0306 crustaceans at 1.19 million tonnes. These are chapter-group volumes, not farmed shrimp quantities. Its aggregate tonnage text is inconsistent, so no aggregate volume is reproduced here.

Buyer task: Processors must distinguish imports for processing/re-export from domestic retail demand. Establish production origin, species/form, destination/site eligibility and current customs requirements; do not infer a producer approval from a trade partner country.

Hong Kong: destination and specification checks

WITS/UN Comtrade 2024 HS03 imports: US$2,308.70 million; leading reported value partners: China, Japan, Australia, Norway and Vietnam. This observation is Hong Kong alone, not Hong Kong and Macao combined. Gross imports are not domestic consumption in a trading/re-export hub. Aggregate weight, growth and species-by-origin figures were not established in this extract.

Product scope: A product-specific farmed-fish or shrimp enquiry needs separate species/form evidence; this chapter total does not establish frozen, fresh or processed shares.

Buyer task: Distributors should state the final destination and local distribution versus re-export, request lot traceability and agree which operator checks applicable food import and storage requirements.

Taiwan: destination and specification checks

USDA FAS Taiwan Seafood Market 2025 reports 2024 world imports of US$1,885 million versus US$1,904 million in 2023: a fall of approximately 1.0% in that same BICO-Seafood series, not a forecast. Comparable WITS HS03 and exact aggregate tonnage were not established. The BICO scope is not confirmed edible-only.

Product scope: The report discusses premium seafood and shrimp. Rounded 2024 supplier values include China US$232 million, Japan US$213 million, Norway US$184 million and Vietnam US$162 million; trade partners do not establish farm origin.

Buyer task: Separate live/chilled buyer requirements from frozen processing or retail packs. Confirm current importer/product eligibility and labeling with the responsible authority; neither domestic tilapia production nor a market-access code list establishes import demand for that species.

Saudi Arabia: destination and specification checks

WITS/UN Comtrade 2024 HS03 imports: US$412.01 million; leading reported value partners: Norway, Vietnam, Yemen, Myanmar and Oman. Agriculture Canada separately reports CAD836.2 million of fish-and-seafood imports in 2024; that broader measure is not the HS03 baseline. Its growth narrative conflicts with its displayed endpoints, so no growth claim is repeated.

Product scope: AAFC 2024: prepared fish HS160419 CAD171.6 million; other prepared fish HS160420 CAD131.7 million; fresh/chilled Atlantic/Danube salmon HS030214 CAD77.3 million; fresh/chilled mackerel HS030244 CAD31.6 million; other frozen fillets HS030479 CAD24.2 million. Prepared does not mean frozen or necessarily canned; mackerel trade is not proof of farmed output.

Buyer task: Retail/foodservice buyers should separate chilled salmon from frozen fillets or prepared products and confirm labeling, importer/site and health-document requirements with SFDA/qualified advisers. Procurement briefs must identify the actual farmed species and lot evidence.

United Arab Emirates: destination and specification checks

A comparable 2024 reporter seafood import total was not validated. The checked WITS page contains no observations: missing is not zero. Agriculture Canada’s available UAE report mixes older periods and mirror data; it is not presented as a 2024 national total.

Product scope: No 2024 species, volume, supplier-origin or growth ranking is claimed. Historical product examples are not used to imply current farmed supply.

Buyer task: State the emirate, port and final local-sale/re-export destination. Coordinate current competent-authority, customs, importer/establishment and labeling checks. A Dubai commercial description is not a UAE-wide approval or a confirmed purchase.

One comparable seafood brief, not eight generic requests

  1. Identify the scientific species and explicitly request farmed origin. Separate farming, processing and dispatch countries. Customs headings usually do not establish production method.
  2. For salmon, specify chilled or frozen, whole/gutted/fillet/portion, trim, skin/bones and unit weight. For shrimp, specify species, shell/head/deveining form, raw/cooked, IQF/block and count with kg or lb basis. Mackerel or prepared-fish imports do not establish farmed supply.
  3. State net product tonnes, glaze and additives, packs/carton, destination port, intended food-service/retail/processing use, receiving capacity and delivery window. Retail labels and processor yield requirements are different briefs.
  4. Request a lot-specific harvest and processing calendar, contingency window and remaining shelf life. A national fishing season is not a farm harvest schedule; no universal seasonal availability is assumed.
  5. Ask the responsible importer to confirm current species/origin/site eligibility, food safety, labeling, health-document and customs obligations. Request dated lot/temperature records and chain-of-custody evidence; supplier declarations are not independent verification.
  6. Compare staff-relayed offers only on the same net kg, currency, dated exchange rate, Incoterm/named place, validity, freight/insurance, inspection and exclusions. Leave unknown costs unpriced; do not infer a market price from customs unit values.

A separate brief for equipment and production technology

Developers need a real site and species plan: permits, water source/salinity, peak biomass and feed load, temperature, electricity and backup, discharge, biosecurity, civil works, commissioning and training. Request the same capacity, design assumptions, scope exclusions, operating consumables and acceptance criteria from each potential offer. Import totals cannot validate these site assumptions or prove demand for a RAS installation.

Buyer access is free. Managed equipment/project RFQs and managed seafood opportunities each require at least USD 250,000; a free seafood brief does not establish value qualification or staff approval. FishMatch is a human-led intermediary, not a farm, exporter, food-safety certifier or guaranteed supplier. Producers and the responsible import operators must meet their contractual and regulatory responsibilities. Supplier identities and documents remain private; questions and comparable potential offers are screened and relayed by staff, with no direct buyer-supplier bypass or promised match.

Local approvals and project procurement

Country market guides

Market overview for each country, with the language editions that exist.

Country-specific planning and approval checks

New market buyer guides

Procurement guides for five emerging markets, each with cost scoping, equipment comparison and a species plan — in English, Spanish, Portuguese, French, Russian and Hebrew.

Canadian seafood market access gains (CFIA, June 2026)

What the new certificate agreements mean for buyers — confirmed access, supplier eligibility and documents kept separate from unverified demand.

Quick answer

Which country is best for a fish or shrimp farm?

There is no single best country. It depends on the species, the water temperature, electricity prices and the licensing route. Warm coastal countries suit pond shrimp and tilapia. RAS (indoor recirculating) farms are less tied to climate and are often built close to the buyers, where power is reliable. Each country guide here compares those factors and includes a local cost calculator.

Pond shrimp (mainly vannamei) needs warm water all year, ideally above about 26 °C, plus coastal or brackish water and land suitable for ponds. Typical CAPEX is USD 25,000–60,000 per hectare for semi-intensive ponds and USD 80,000–180,000 for lined intensive ponds. Indoor RAS shrimp can be built in cooler countries at about USD 400,000 per hectare or more.

Less than ponds or cages, because the water loop is controlled indoors. Electricity price and reliability, permits, access to smolts or fingerlings and distance to market matter most. Typical RAS CAPEX is USD 10,000–25,000 per tonne of annual capacity.

The main farmed species, water temperatures, electricity costs, the licensing authority and import ports, plus a local-currency farm cost calculator. Each guide is available in English, Spanish, French and the local language.

Yes. Send a project brief with species, target tonnage and location. A person reviews it and replies within one business day. Buyers pay no fees and supplier identities stay private until you decide to proceed.

Explore by category

The two categories most country projects start from:

Short answer

What is the fastest way to get quotes for Markets?

Submit one structured request for Markets. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer