Aquaculture tanks and water recirculation equipment
← Markets

Aquaculture projects in Cyprus: licences, buyers and equipment

A Cyprus fish farm needs a DFMR licence for establishing and operating a fish farm, environmental approval from the Department of Environment, a Veterinary Services licence for aquaculture production and, offshore, a Council of Ministers permit to use marine space. The sector is offshore seabream and seabass cages with marine hatcheries; DFMR records one shrimp hatchery and farm, so shrimp is a niche.

EUR · euro

t/year · kg · ha · m³ · m³/h · °C · kW · kWh

Approvals: offshore and onshore routes

  • The Department of Fisheries and Marine Research (DFMR) issues the licence for the establishment and operation of a fish farm, for offshore and onshore units. Offshore farms also need Department of Environment approval and a Council of Ministers permit to use marine space, submitted through the agriculture minister; onshore units need planning permission and a Department of Environment discharge permit.
  • Both routes list a Veterinary Services licence for production of aquaculture products, and Veterinary Services publishes a register of aquaculture production businesses. Packing or processing establishments are a separate question.

What Cyprus farms, and who buys it

  • EUMOFA reports 2023 production of about 3,700 t gilthead seabream (64.1%), 1,900 t European seabass (32.5%) and 200 t of other species. The European Commission, citing DFMR, reports 9,054 t worth €53 million in 2024 from nine cage farms, three marine hatcheries and one shrimp hatchery and farm — a different year and source, so the totals are not interchangeable.
  • Israel took 90% and Greece 5% of Cyprus's 2024 seafood export value, with seabream and seabass making up 43% and 27% of it. At home, consumers named supermarkets (74%), specialist fish shops (27%) and direct purchase from farms or fishers (21%) as places they buy. Cyprus imported 18,600 t and exported 7,000 t of seafood in 2024.

Equipment that matches Cypriot systems

  • Offshore cage farms buy cages, nets, moorings and feeding systems; hatcheries buy tanks, water treatment and recirculation, live-feed and biosecurity equipment. This follows the documented cage, hatchery and tank-based systems; it is not measured procurement demand.
  • Specify sea-state and depth data for the site, the receiving port and who handles installation offshore.

Cyprus project brief checklist

For the Cyprus site, include administrative area and coordinates, legal applicant and site rights, species and life stage, intended annual harvest and peak biomass, water-use and approval status, measured seasonal water data, intake and discharge layout, power and backup, delivery point, quote currency and budget. Attach the DFMR licence status, the Department of Environment approval or discharge permit, the marine-space permit for offshore sites and the Veterinary Services licence. Mark every unconfirmed assumption. Separate studies and applications, civil works, equipment, installation and acceptance responsibilities. FishMatch reviews commercial projects of USD 250,000 or more by hand; smaller projects can still use the free planning tools.

Request private project review

Calculate from your measured site inputs

Cyprus buyer questions

Which approval should I resolve first in Cyprus?

For an offshore farm, the marine-space permit and Department of Environment approval decide whether the site is usable at all; the DFMR licence and Veterinary Services licence complete the set. Onshore units start with planning permission and the discharge permit.

Is shrimp farmed commercially in Cyprus?

Only on a small scale: DFMR records one shrimp hatchery and farm alongside nine cage farms and three marine hatcheries. No shrimp tonnage is published in the sources used here.

Will FishMatch expose supplier contacts or forward the brief automatically?

No. Project requests are private and human-reviewed; supplier identities and contacts remain confidential and there is no automatic supplier routing. Procurement assistance is for commercial projects of USD 250,000 or more; the planning tools remain free.

Institutional, legal and statistical references

Prepared 30 October 2026 from the linked institutional, legal and statistical references, each opened on that date. This is editorial planning guidance, not a legal opinion, local engineering design, approval or independent expert sign-off. Procedures and figures can change; confirm the current rules and site-specific applicability with the competent authority before committing capital. No local tariffs, project prices, production gains or buyer commitments are asserted; trade and production figures describe the country, not demand for a specific project.

Short answer

How do you prepare a reviewed RFQ for Cyprus?

Submit a private request for Cyprus with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer