Free project calculators for aquaculture buyers
63+ free calculators that turn a production target into preliminary sizing, water, energy, feed and budget figures — before you contact a single supplier. No account, no cost, no supplier bias.
Before you size the facility
Turn a production target into tanks, volumes and stocking assumptions.
Before you specify life support
Oxygen, water exchange and filtration drive most of the equipment scope.
Before you build the budget
Indicative CAPEX, operating cost and return ranges for internal review.
Before you issue the RFQ
Feed, processing and power assumptions that suppliers will ask about anyway.
Fish & shrimp FCR
Estimate annual feed tonnage and cost from production, FCR and feed price.
Processing plant
Seafood cold storage kW
Total kW load
Genset kVA
Questions buyers ask
Are the calculators really free?
Yes. Every calculator on FishMatch Group is free to use, requires no account and is supplier-neutral.
How accurate are the results?
They are planning-grade. Results depend on species biology, site conditions, water quality, engineering design and local regulation, and must be verified by qualified specialists before any investment decision.
Can I use the results in a supplier RFQ?
Yes. Results can be carried into the RFQ builder as stated assumptions, which makes supplier quotations easier to compare.
Do the calculators share my data with suppliers?
No. Calculator inputs are not sent to suppliers. Only a project you submit for human review enters the RFQ process.
Beyond aquaculture
For industrial projects outside aquaculture, see the Global B2B Group guide to free project calculators and RFQ tools. The method behind them is described in structured procurement for aquaculture projects.
All calculator results are preliminary planning assumptions. They are not engineering design, financial advice or a guarantee of biological or financial performance, and must be verified by qualified specialists against species biology, site conditions and local regulation.