面向水产养殖买家的免费项目计算器

免费计算器将产量目标转化为初步规模测算以及水、能源、饲料与预算数据——在您联系任何供应商之前。无需注册,完全免费,不偏向任何供应商。

计算器名称以英文显示;每个计算器打开其英文版本。此语言差异已在页面下方注明。

内嵌工具

循环水养殖(RAS)选型计算器

循环水养殖系统(RAS)以存塘生物量、投饲量和目标密度为基础进行选型。本工具计算系统水体、每日补充水量、氨氮(TAN)产生量、MBBR 生物滤池体积与需氧量。

鳟鱼/三文鱼 40–80,罗非鱼 60–120

现代 RAS 3–10%

From your feed bag / feed supplier's specification

Example — use the media supplier's tested rate at your temperature. Measured in a working RAS: 127.6 ± 58.3 g TAN/m³·day (Pfeiffer & Riche 2011, Florida pompano)

250 g from Timmons & Ebeling; use your designer's figure if different

Example — use your system designer's recirculation rate

Example — from your designer's hydraulic calculation

Example — read it off the pump's performance curve at your flow and head

Blowers, UV, heating, lights — from your equipment list

Example — from your power bill or utility tariff

Your water supplier's tariff; 0 if you use your own well

系统水体
833 m³
50,000 千克 ÷ 60 千克/立方米
每日补充水量
66.7 m³/day
系统体积的 8%
投饲量
600 kg/day
每天 1.20% 体重
氨氮产生量
22.08 kg/day
37 g TAN / kg feed (feed × protein × 0.092)
MBBR 生物滤池体积
55.2 m³
按 400 克 TAN/立方米·天
需氧量
150 kg O₂/day
250 克 O₂ / 千克饲料
Biofilter oxygen use
92 kg O₂/day
4.18 g O₂ per g TAN (Ebeling, Timmons & Bisogni 2006)
CO₂ produced
206 kg CO₂/day
1.375 g CO₂ per g O₂ (Timmons et al.)
碱度消耗量
156 kg CaCO₃/day
7.05 g per g TAN (Ebeling, Timmons & Bisogni 2006)
循环流量
833 m³/h
833 m³ × 1.0 turnovers/h
Pumping power
15.1 kW
ρ·g·Q·H ÷ η at 4.0 m head
Electricity + water together
363 kWh/day · 66.7 m³/day
15.1 kW total load · 133 MWh/yr · 24,333 m³/yr
Energy + water cost
$19,893
Power $19,893/yr + water $0/yr · 0.61 kWh and 111 L per kg feed

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

在确定设施规模之前

将产量目标换算为池体、水体与养殖密度假设。

在确定生命维持系统之前

氧气、换水与过滤决定了设备范围的大部分内容。

在编制预算之前

供内部评审使用的 CAPEX、运营成本与回报参考区间。

在发出询价单之前

供应商反正会询问的饲料、加工与电力假设。

买家常见问题

这些计算器真的免费吗?

是的。FishMatch Group 的所有计算器均可免费使用,无需注册,且对供应商保持中立。

计算结果有多准确?

结果属于规划级。结果取决于品种生物学特性、场址条件、水质、工程设计以及当地法规,在任何投资决策之前必须由合格专业人员核实。

我可以把结果用于供应商询价吗?

可以。结果可以作为已声明的假设写入询价单,使供应商的报价更易于比较。

计算器会把我的数据分享给供应商吗?

不会。计算器输入不会发送给供应商。只有您主动提交供人工审核的项目才会进入询价流程。

水产养殖之外

如需水产养殖之外的工业项目,请参阅 Global B2B Group 的免费项目计算器与询价工具指南。其方法在 Global B2B Group 的项目计算器与询价工具. 面向水产养殖项目的结构化采购.

所有计算器结果均为初步规划假设。它们不构成工程设计、财务建议,也不构成对生物学或财务表现的保证,必须由合格专业人员根据品种生物学特性、场址条件与当地法规进行核实。