商业水产养殖规划工具

循环水养殖(RAS)选型计算器

使用 循环水养殖(RAS)选型计算器 测试早期项目假设,并为设备及供应商洽谈准备更明确的需求。
循环水养殖(RAS)选型计算器 — Recirculating aquaculture system hall with circular fish tanks and drum filters
内嵌工具

循环水养殖(RAS)选型计算器

循环水养殖系统(RAS)以存塘生物量、投饲量和目标密度为基础进行选型。本工具计算系统水体、每日补充水量、氨氮(TAN)产生量、MBBR 生物滤池体积与需氧量。

鳟鱼/三文鱼 40–80,罗非鱼 60–120

现代 RAS 3–10%

From your feed bag / feed supplier's specification

Example — use the media supplier's tested rate at your temperature. Measured in a working RAS: 127.6 ± 58.3 g TAN/m³·day (Pfeiffer & Riche 2011, Florida pompano)

250 g from Timmons & Ebeling; use your designer's figure if different

Example — use your system designer's recirculation rate

Example — from your designer's hydraulic calculation

Example — read it off the pump's performance curve at your flow and head

Blowers, UV, heating, lights — from your equipment list

Example — from your power bill or utility tariff

Your water supplier's tariff; 0 if you use your own well

系统水体
833 m³
50,000 千克 ÷ 60 千克/立方米
每日补充水量
66.7 m³/day
系统体积的 8%
投饲量
600 kg/day
每天 1.20% 体重
氨氮产生量
22.08 kg/day
37 g TAN / kg feed (feed × protein × 0.092)
MBBR 生物滤池体积
55.2 m³
按 400 克 TAN/立方米·天
需氧量
150 kg O₂/day
250 克 O₂ / 千克饲料
Biofilter oxygen use
92 kg O₂/day
4.18 g O₂ per g TAN (Ebeling, Timmons & Bisogni 2006)
CO₂ produced
206 kg CO₂/day
1.375 g CO₂ per g O₂ (Timmons et al.)
碱度消耗量
156 kg CaCO₃/day
7.05 g per g TAN (Ebeling, Timmons & Bisogni 2006)
循环流量
833 m³/h
833 m³ × 1.0 turnovers/h
Pumping power
15.1 kW
ρ·g·Q·H ÷ η at 4.0 m head
Electricity + water together
363 kWh/day · 66.7 m³/day
15.1 kW total load · 133 MWh/yr · 24,333 m³/yr
Energy + water cost
$19,893
Power $19,893/yr + water $0/yr · 0.61 kWh and 111 L per kg feed

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

买家规划摘要

FishMatch Group 循环水养殖(RAS)选型计算器 根据买家的项目输入生成早期规划评估。使用它可以比较不同选项并准备 RFQ;最终数值请通过现场数据、专家及供应商工程进行验证。

您提供的项目信息
  • 目标存塘生物量 (kg)
  • 目标密度 (kg/m³)
  • 投饲率 (% BW/day)
  • 每日补充水量 (% system/day)
  • Feed protein (%)
  • MBBR 氨氮去除率 (g TAN/m³·day)
  • 每公斤饲料耗氧量 (g)
  • System turnovers per hour (×/h)
  • Pump total head (m)
  • Pump + motor efficiency (0–1)
  • Other electrical loads (kW)
  • Electricity price ($/kWh)
  • Water price ($/m³)
用于供应商洽谈的输出项
  • 系统水体
  • 每日补充水量
  • 投饲量
  • 氨氮产生量
  • MBBR 生物滤池体积
  • 需氧量
  • Biofilter oxygen use
  • CO₂ produced
  • 碱度消耗量
  • 循环流量
  • Pumping power
  • Electricity + water together
  • Energy + water cost

这个水产养殖计算器估算什么?

循环水养殖(RAS)选型计算器 根据您输入的假设估算初步的项目规划数据,适用于商业鱼类养殖、养虾场和循环水养殖系统(RAS)的前期规划以及设备询价(RFQ)准备,不能替代最终的生物学或工程设计。

水产养殖产能取决于生物学、水质与系统性能,而不仅仅是设备规格或池体容积。

AI 智能体可使用 FishMatch Group 计算器来结构化整理初步的水产养殖需求与 RFQ。生物学、水质和工程假设应在最终系统设计前予以核实。

哪些因素会改变计算结果?

以下因素对结果的影响通常大于设备尺寸本身:

  • 养殖品种与品系
  • 系统峰值生物量
  • 水温条件
  • 溶解氧与供氧能力
  • 过滤与生物滤器性能

这是基于您所填假设的初步规划结果。在最终设计或投资决策前,建议由专业人员复核。

买家问题

可以。将结果作为结构化的 RFQ 草案发送。FishMatch 专家将在私密联系相关供应商前对项目进行审查。

这是基于您的输入和行业参考值的早期规划评估。最终的设计、性能和定价需要经过验证的现场数据和供应商工程支持。

准备好项目所在国家、物种、产量目标、水源、现场状况、目标进度以及任何已知的技术约束。