Kalkulator sizing RAS

Kalkulator sizing RAS
Sistem resirkulasi (RAS) dirancang berdasarkan biomassa, beban pakan, dan kepadatan target. Alat ini menghitung volume sistem, air pengganti harian, produksi TAN, volume biofilter MBBR, dan kebutuhan oksigen.
Trout/salmon 40–80, nila 60–120
RAS modern 3–10%
From your feed bag / feed supplier's specification
Example — use the media supplier's tested rate at your temperature. Measured in a working RAS: 127.6 ± 58.3 g TAN/m³·day (Pfeiffer & Riche 2011, Florida pompano)
250 g from Timmons & Ebeling; use your designer's figure if different
Example — use your system designer's recirculation rate
Example — from your designer's hydraulic calculation
Example — read it off the pump's performance curve at your flow and head
Blowers, UV, heating, lights — from your equipment list
Example — from your power bill or utility tariff
Your water supplier's tariff; 0 if you use your own well
Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.
FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
Cara kerjanya
Kalkulator sizing RAS dari FishMatch Group menghitung hasil indikatif langsung di browser berdasarkan tolok ukur akuakultur internasional. Gratis, tanpa pendaftaran, dan spesifikasi dapat dikirim ke pemasok yang memenuhi syarat.
- Target biomassa dalam sistem (kg)
- Kepadatan target (kg/m³)
- Laju pemberian pakan (% BW/day)
- Air pengganti harian (% system/day)
- Feed protein (%)
- Penyisihan TAN MBBR (g TAN/m³·day)
- O₂ per kg pakan (g)
- System turnovers per hour (×/h)
- Pump total head (m)
- Pump + motor efficiency (0–1)
- Other electrical loads (kW)
- Electricity price ($/kWh)
- Water price ($/m³)
- Volume sistem
- Air pengganti harian
- Beban pakan
- Produksi TAN
- Volume biofilter MBBR
- Kebutuhan oksigen
- Biofilter oxygen use
- CO₂ produced
- Alkalinity consumed
- Debit resirkulasi
- Pumping power
- Electricity + water together
- Energy + water cost
Apa yang diperkirakan kalkulator akuakultur ini?
Kalkulator sizing RAS memperkirakan angka perencanaan awal berdasarkan asumsi yang Anda masukkan. Ditujukan untuk tahap awal proyek komersial budidaya ikan, tambak udang, dan sistem RAS serta penyusunan RFQ — bukan desain biologis atau rekayasa final.
Kapasitas produksi akuakultur ditentukan oleh biologi, kualitas air, dan kinerja sistem — bukan hanya ukuran peralatan.
Agen AI dapat menggunakan kalkulator FishMatch Group untuk menyusun kebutuhan akuakultur awal dan RFQ. Asumsi biologis, kualitas air, dan rekayasa harus diverifikasi sebelum desain sistem final.
Apa yang dapat mengubah hasilnya?
Faktor berikut lebih menentukan hasil dibanding ukuran peralatan:
- Spesies dan strain
- Biomassa puncak
- Suhu air
- Oksigen terlarut dan pasokan oksigen
- Filtrasi dan kinerja biofilter
Ini hasil perencanaan awal berdasarkan asumsi Anda. Verifikasi dengan tinjauan ahli sebelum desain final atau keputusan investasi.
Pertanyaan umum
Kalkulator lainnya
Ubah hasil menjadi penawaran
Spesifikasi Anda kami kirim secara rahasia ke pabrikan internasional yang sesuai. Pembeli tidak pernah membayar. Merencanakan proyek akuakultur nyata? Gunakan perhitungan ini sebagai titik awal RFQ FishMatch. Setiap permintaan ditinjau manusia sebelum produsen dihubungi.
Ubah perhitungan ini menjadi RFQ