Engineering & Procurement Knowledge Base

Equipment Intelligence Center

The vendor-neutral knowledge base built by aquaculture engineers. Compare technologies, draft technical specifications, budget CAPEX and OPEX, score suppliers and prepare your RFQ — before you talk to a single vendor.

Technology comparisons

Head-to-head tables: paddlewheel vs LOX, HDPE vs steel cages, RAS vs flow-through.

Spec checklists

Line-by-line technical specifications you can hand to any engineer.

Cost drivers

What moves CAPEX and OPEX by project size. Cost figures only where a dated public source exists; otherwise “Not sourced”.

Supplier scoring

Weighted evaluation matrices. Buy on merit, not on marketing.

Equipment categories

Each page includes overview, comparison, buying guide, spec checklist, budget, procurement checklist, supplier evaluation matrix, decision wizard and FAQ.

How professionals use it

1. Learn the landscape

Read the overview and comparison to understand each technology, its strengths, weaknesses and typical project sizes.

2. Build your specification

Use the spec checklist, buying-guide questions and evaluation matrix to draft a vendor-neutral technical brief.

3. Issue a confidential RFQ

Turn the brief into an RFQ through the RFQ Builder. Only project-matched international suppliers see it.

Frequently asked questions

A vendor-neutral knowledge base built by aquaculture engineers to help investors, operators, consultants and procurement teams evaluate technologies, compare equipment, prepare technical specifications and plan investments — before choosing a supplier.

No. We never publish supplier names. Every page is written to teach — comparisons, specifications, budgets, procurement checklists and supplier scoring frameworks. When you are ready, the RFQ Builder reaches only project-matched international manufacturers privately.

RAS project developers, shrimp and fish farm investors, hatchery managers, seafood processors, engineering companies, consultants and procurement teams evaluating aquaculture technology.

Yes. Every guide, comparison and template is free. Buyers pay no fee, and suppliers cannot pay for ranking or shortlist position.

Farm management systems help you operate a running farm. The Equipment Intelligence Center helps you plan, specify and buy the equipment in the first place.

Planning a project?

When you have a clear specification, get confidential quotations from project-matched international suppliers — or line up equipment financing first.

Short answer

How do you source Equipment Intelligence for a commercial aquaculture project?

Start from the process requirement — biomass, flow, water quality target and site constraints — not from a product catalogue. FishMatch Group converts that requirement into a specification for Equipment Intelligence, sources it from matched manufacturers and integrators across Europe, Asia and the Americas, and returns like-for-like quotations with lead times, energy consumption and lifetime running cost stated in the same format.

What we compare:
Scope, capacity, energy use, lead time and total cost of ownership
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Delivery terms:
Quotations normalised to EXW / FOB / CIF so prices are like-for-like
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.