Aquaculture and fish farming equipment, including hatchery systems, scoped for your project.
Every system a commercial fish, shrimp or hatchery project needs — RAS, aeration and oxygen, filtration, pumps, feeding, monitoring and cages — sourced from manufacturers, dealers and exporters worldwide. FishMatch is supplier-neutral: we do not make or sell equipment; we structure one RFQ so offers are comparable.
FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities中文版:水产养殖设备 · Version française : équipement aquaculture · Versión en español: equipos de acuicultura
Still defining the farm? Read how to plan a commercial fish farm first. Buying for a fish farm specifically? Start with the fish farming equipment buyer page; for processing lines see fish processing equipment. Looking for suppliers by country instead? See aquaculture suppliers by country — including how to buy from exporters, distributors and dealers.
Buying fish or shrimp products, not equipment? Use the seafood sourcing request — a separate lane reviewed by our team.
Where do commercial farms buy aquaculture equipment?
Commercial fish and shrimp farms buy core systems (RAS, aeration, feeding, filtration) from manufacturers and their exporters, and spare parts and consumables from local dealers and distributors. The right mix depends on project size and how fast you need service on site. You prepare one project request; our team reviews it, contacts suitable manufacturers, exporters and dealers for you, and presents their responses through FishMatch on the same scope. FishMatch holds no stock and has no equipment for sale or price list — prices come from written quotes for your scope.
Fish hatchery equipment and local sourcing
Hatchery buyers usually ask three things: what the hatchery needs, what "automatic" really covers, and which parts can be bought in the project country. The answers below are in the questions further down this page; this checklist is what to have ready before you request quotes.
Hatchery request checklist
- • Species and life stage you will sell: eggs, fry, fingerlings or post-larvae
- • Target output per cycle and cycles per year
- • Water source, salinity and seasonal temperature range
- • Which functions must be automated, and the manual backup for each
- • Site power, backup generation and the voltage and frequency on site
- • Biosecurity and disinfection requirements set by your biologist or authority
Local or imported?
- • Often local: civil works, concrete or fabricated tanks, pipework, electrical installation, common pumps and blowers
- • Often imported: drum filters, biofilter media, UV and ozone, oxygen generators, sensors and controls
- • Check per item: import duties and customs classification, local registration rules, lead time and who services it after commissioning
- • Local availability differs by country and is confirmed only in written offers

Aquaculture equipment costs: use your quotes, not a generic price list
Aerators, pumps, filtration and farm packages need a defined duty and scope before a price is meaningful. No verified market-price list is available here. Compare dated written offers in one currency; keep missing costs marked as unknown rather than zero.
- Delivered and installed cost
- Equipment + freight + applicable duties and taxes + installation + commissioning + initial spares. Count each item once and record exclusions.
- Annual electricity cost
- Connected kW × measured load factor × hours/day × days/year × tariff per kWh. Include demand charges separately; nameplate power is not measured consumption.
- Undiscounted lifecycle cost
- Delivered and installed cost + annual energy, maintenance and spares × years. Constant annual costs are an assumption, not a forecast; financing, inflation, downtime and biological effects are excluded unless explicitly added.
- Sizing before pricing
- Usable water volume = peak biomass (kg) ÷ site-validated density (kg/m³). Density is species-, life-stage- and system-specific; this identity does not certify a safe design.
Equipment cost calculator
Enter amounts from your own dated quotes. There are no built-in prices; blank costs stay unknown, not zero.
Enter at least the equipment price and a valid currency to see results.
Arithmetic on your inputs only. Excludes financing, inflation, downtime and biological effects. Not a supplier price or engineering approval.
Opens your private projects (sign-in needed). Nothing is saved until you add it to a project and save; it then appears in your buyer dashboard.
Free planning tools; human-reviewed procurement for projects from USD 250,000. Arithmetic uses your inputs and does not guarantee savings, supplier prices or engineering performance.
Buying a farm package, tanks or a treatment system?
Choose the scope before comparing prices. Commercial farm capacity, peak biomass and stage-specific water duty are different quantities; a tank listing does not establish annual output. Managed procurement is for B2B projects from USD 250,000 total investment, with early planning and unknown budgets welcome.
Commercial tanks and farm packages
Working volume, materials, drains and installed interfaces.
Breeding and hatchery equipment
Broodstock, incubation and nursery have distinct duties.
Filtration packages
Flow, solids, TAN duty, head loss and sludge handling.
RAS system equipment
Feed load, water quality, oxygen and failure tolerance.
Cage-farming equipment
Site survey, moorings, nets and installation windows.
Turnkey fish farm scope
Design, civil works, utilities and acceptance boundaries.
For learning before purchase, use the commercial project explainer. For a priced design brief, use the RAS system RFQ. Standalone feed procurement belongs with FeedMatch Group; standalone refrigeration with ColdMatch Group. Fish hatcheries stay in FishMatch; poultry is outside this cluster.
How to compare aquaculture equipment classes
Each equipment class is sized from a different number. Compare quotes within a class on that number, not on catalogue items or headline price.
- Tanks and whole-farm packages
Sized from: Peak standing biomass, approved density and working volume
- Shrimp farm equipment
Sized from: Pond area or tank volume, peak biomass and feed
- RAS systems
Sized from: Peak daily feed, which sets oxygen, solids and ammonia loads
- Aeration
Sized from: Oxygen demand at peak biomass and temperature
- Oxygen systems (generators, liquid oxygen)
Sized from: Peak oxygen demand (kg O₂/day), purity, pressure and backup
- Filtration and water treatment
Sized from: Flow, solids and ammonia (TAN) load
- Hatchery equipment
Sized from: Egg, larvae or post-larvae output per cycle and protocol
- Processing lines
Sized from: Raw material in t/day at the harvest peak and product forms
How fish farming equipment is sized — and what drives its cost
Fish farming equipment is not chosen from a catalogue; it is sized from the biology. Fix the species, annual production target and peak standing biomass first, then derive feed load, oxygen demand and water flow. Every package below follows from those numbers, so quotes that start from them can be compared.
| Package | Sized from | Main cost drivers |
|---|---|---|
| Tanks, ponds or cages | Peak standing biomass ÷ target stocking density | Material, civil works, number of units |
| Aeration & oxygenation | Peak daily feed load and species oxygen use | Blower/aerator kW, pure-oxygen supply, redundancy |
| Mechanical & biological filtration (RAS) | Daily feed load and protein content | Recirculation rate, biofilter media volume, degassing |
| Pumps & water supply | Flow per tank and exchange or recirculation rate | Head, duty/standby pumps, intake works |
| Feeding systems | Number of units, feed per day, pellet sizes | Automation level, storage, distribution |
| Monitoring & backup power | Critical loads and alarm points | Sensors per unit, generator size, control system |
Start with free tools — no project size needed: biomass, oxygen demand, aeration sizing, FCR and the RAS cost calculator. Results are planning estimates, not engineering designs or supplier prices.
By system or species: equipment, feed & farm design selection guide · hatchery equipment · oyster aquaculture equipment · tilapia farming equipment · biofloc fish farming equipment · biofloc tank sizing, feed rates & FCR · biofloc equipment in India · aquaculture in India (biofloc, shrimp, ponds) (हिन्दी, తెలుగు) · shrimp farming equipment · processing.
Ready for quotes on a project of USD 250,000 or more? Send one project request — our team reviews it before any supplier is contacted.
Choose the right supplier role before requesting quotes
A manufacturer supplies a defined machine or package; a distributor adds local stock and service; a line integrator connects equipment into one operating process; and an EPC contractor may coordinate design, procurement and construction. FishMatch is supplier-neutral: our team structures the brief, then contacts suitable providers and organises their responses for you.
Manufacturer
Best when specifications and interfaces are already defined.
Distributor
Best when local spares, response time and commissioning matter most.
Line integrator
Best for connected equipment with throughput and acceptance guarantees.
EPC contractor
Best when civil works, utilities and multiple packages need one coordinator.
To make offers comparable, provide the project location, species, production capacity, culture system, water and power conditions, budget range, delivery terms and target commissioning date.
Structure the equipment RFQProduction systems
6 categoriesFish Farming Equipment
Complete fish farm equipment packages: tanks, pumps, sensors, feeders, aeration, water treatment and harvesting gear for freshwater and marine species.
Aquaculture Systems
Turnkey aquaculture production systems engineered for tilapia, salmon, sea bass, sea bream, trout, shrimp and other commercial species.
RAS Systems
Recirculating Aquaculture Systems with mechanical filtration, biofilters, UV/ozone disinfection, oxygenation and full process control for high-density indoor production.
Cage Farming Systems
HDPE and steel circular and square net pens, mooring systems, net handling and cage feeding barges for lake, reservoir and marine farms.
Pond Farming Systems
Liners, paddlewheels, harvest pumps, aerators and pond-management equipment for tilapia, catfish, shrimp and polyculture pond operations.
Offshore Aquaculture Systems
Submersible cages, exposed-site mooring systems, ROV-friendly infrastructure and service vessels for high-energy offshore fish farming.
Feeding, aeration & water quality
4 categoriesFish Feeding Systems
Automated and remote-controlled fish feeders, blowers, silos and AI-driven feeding platforms that cut FCR and labor across tanks, ponds and cages.
Aeration Systems
Paddlewheel, aspirator, diffused and Venturi aeration with oxygen cones and liquid-oxygen systems for ponds, tanks and intensive RAS.
Water Treatment Systems
Intake, process and effluent water treatment: solids removal, biofiltration, denitrification, pH control, ozone and UV disinfection for sustainable farms.
Filtration Systems
Aquaculture filter systems for RAS and pond farms — mechanical and biological filtration: drum, disc and sand filters, protein skimmers and moving-bed biofilters sized for hatcheries, nurseries and grow-out.
Monitoring & automation
1 categoriesHatchery, shrimp, turnkey & financing
4 categoriesFish Hatchery Equipment
Incubators, larval tanks, live-feed systems, broodstock tanks and water-quality skids for marine and freshwater hatcheries and nurseries.
Shrimp Farming Equipment
Intensive and biofloc shrimp farm equipment: aeration, liners, automatic feeders, monitoring and post-harvest handling for vannamei and monodon production.
Turnkey Fish Farms
Turnkey aquaculture projects sourced through qualified third-party EPC partners: feasibility, design, equipment supply, installation, commissioning and training are delivered by the selected partner — anywhere in the world.
Aquaculture Financing
Equipment financing, leasing and project finance for qualified buyers — fish farms, shrimp farms, RAS facilities, hatcheries and turnkey aquaculture projects.
Fish farming equipment list — machine guides, specs & sizing
Catalog overviewOpen catalog · 12 guidesThe aquaculture machines most commercial farms buy — filters, aerators, feeders, oxygen equipment, tanks, liners, sensors, hatchery systems, graders and freezers. Each guide gives typical specifications, sizing rules, selection criteria and price drivers so you can build a specification before you request quotes.
Drum filters
Rotary drum filter guide for fish and shrimp farms: micron ratings, flow capacity, backwash water use, sizing rules and price drivers. Our team requests and organises supplier quotes for you.
Specs & sizingPaddlewheel aerators
Paddlewheel aerator guide for shrimp and fish ponds: HP per hectare, SOTR and aeration efficiency, placement, price drivers and what to state in an RFQ.
Specs & sizingAutomatic feeders
Automatic fish and shrimp feeder guide: timer, demand, acoustic and centralised blower systems, hopper sizing, FCR impact, price drivers and RFQ checklist.
Specs & sizingOxygen cones
Oxygen cone (downflow bubble contactor) guide for RAS: absorption efficiency, flow and pressure, sizing to oxygen demand, LOX vs PSA and price drivers.
Specs & sizingRAS culture tanks
Buyer guide to RAS and freshwater shrimp farming tanks: circular, raceway and prawn nursery designs, GRP, HDPE and concrete, sourced sizes and an RFQ checklist.
Specs & sizingRAS biofilters
Buyer guide to aquaculture biofilters for RAS: moving-bed (MBBR), fixed-bed, sand and trickling filters, media surface area, fill ratios, start-up, maintenance and how to compare supplier quotes.
Specs & sizingOxygen generators
Oxygen systems for fish farms, shrimp farms and hatcheries: PSA/VPSA generators vs liquid oxygen, an oxygen demand calculator, a sourced running-cost guide and a quote request.
Specs & sizingWater quality sensors
Buyer guide to aquaculture water-quality monitoring: optical dissolved-oxygen probes, pH, ORP, conductivity/salinity, ammonia measurement, multiparameter sondes, IoT stations, calibration and maintenance.
Specs & sizingShrimp pond liners
Buyer guide to lined shrimp ponds and HDPE geomembranes: why farms line ponds, pond size and depth guidance, biofloc and sludge removal, installation quality, maintenance and RFQ checklist.
Specs & sizingHatchery systems
Buyer guide to hatchery equipment: upwelling egg incubators, larval and post-larval rearing tanks, Artemia hatchers, microalgae photobioreactors, UV and ozone water treatment, maintenance and RFQ checklist.
Specs & sizingSeafood freezers
Buyer guide to shrimp and fish freezing equipment: IQF fluidised-bed, spiral, tunnel, impingement, plate and brine freezers, capacity ranges, glazing, core temperature, labelling rules and RFQ checklist.
Specs & sizingShrimp graders
Buyer guide to shrimp grading, sorting and peeling equipment: roller graders, optical and laser sorters, capacity and grade counts, count-per-pound conventions, maintenance and RFQ checklist.
Specs & sizingPost-smolt & smolt RAS equipment sourcing
Land-based salmon projects sized from daily feed load: filtration, biofiltration, degassing, oxygenation, sludge handling and controls — with capacity bands, cost drivers and the RFQ fields suppliers need.
Open the sourcing pageEquipment packages by farm type
Example projectsTypical equipment scope for the main commercial farm types, with capacity, layout and cost drivers. These are planning examples, not client references.
Land-based RAS
Tanks, drum filters, biofilters, degassing, oxygen, UV and controls for a 500 t/year farm.
Pond & tank tilapia
Ponds or tanks, aeration, feeders, grading and harvest gear for commercial tilapia.
Shrimp ponds
Lined ponds, paddlewheels, nursery, feeders, biosecurity and harvest chilling.
Sea cages
Cages, moorings, nets, feed barge, cameras and service vessels.
Hatchery
Broodstock tanks, incubation, larval rearing, live feed and water treatment.
Biofloc
Tanks, high-capacity aeration, solids control and monitoring for biofloc systems.
Pond aeration upgrade
Paddlewheels, aspirators, blowers and backup power sized to biomass.
Turnkey farm
Design, equipment, building and commissioning under one coordinated package.
Farm monitoring, alarms and digital tools
Oxygen, temperature and pH sensors with alarms, feeding control, cameras and farm software are now part of most commercial equipment packages. We source monitoring systems from specialist suppliers alongside the main equipment, so sensors, controls and backup alarms are specified together instead of added later.
- Dissolved oxygen, temperature, pH and salinity sensors
- SMS and phone alarms with automatic backup aeration
- Automatic and camera-guided feeding control
- Farm management software for stock, feed and FCR
- Free planning calculators for FCR, biomass and costs
What equipment does an aquaculture project actually need?
Fish farming equipment procurement checklist
Answer: state these seven items before asking for quotes, so every supplier prices the same scope. Our team checks them, contacts suitable suppliers for you and presents comparable responses — for commercial projects from USD 250,000.
- Species, target tonnes per year and harvest weight — the design basis every supplier must quote against.
- System type chosen for the site (ponds, RAS, cages, biofloc or longlines) and why the alternatives were ruled out.
- Water source, measured quality and discharge limits; flag any analysis you do not yet have.
- Peak feed per day and the oxygen-demand basis you used, with its source.
- Scope split: process equipment, water treatment, oxygen/aeration, monitoring, civil works, installation and training.
- Backup power, alarms and spare-parts expectations written into the scope, not added later.
- Budget range (from USD 250,000) or an honest ‘unknown’, plus target timeline and financing status.
Outside FishMatch’s scope
- Aquafeed sourcing — FeedMatch Group
- Cold chain & processing logistics — ColdMatch Group
- Poultry hatchery equipment — HatchMatch Group
- Aquarium, ornamental and hobby equipment is not covered.
Aquaculture equipment — buyer questions we answer
Practical answers from live sourcing briefs. Every quote we run is anonymized: buyers never see supplier names until they choose one.
Ready to price it?
Start a private, anonymized RFQ.
1–3 shortlisted proposals. Zero buyer fees. Suppliers stay confidential until you choose.
Aquaculture equipment — categories, countries & financing
By category
- RAS systems & recirculating aquaculture equipment
- Fish feeding systems & automatic feeders
- Aeration systems for shrimp ponds & fish farms
- Water treatment & filtration systems
- Fish hatchery equipment
- Shrimp farming equipment
- Monitoring & IoT systems for water quality
- Cage & offshore aquaculture systems
- Turnkey fish farms
By supplier country
- Aquaculture equipment suppliers in Spain
- Aquaculture equipment suppliers in Norway
- Aquaculture equipment suppliers in Thailand
- Aquaculture equipment suppliers in the Philippines
- Aquaculture equipment suppliers in Vietnam
- Aquaculture equipment suppliers in Malaysia
- Aquaculture equipment suppliers in Mexico
- Aquaculture equipment suppliers in Egypt
- Aquaculture equipment suppliers in Indonesia
- Aquaculture equipment suppliers in Ecuador
- Aquaculture equipment suppliers in India
- Aquaculture equipment suppliers in Chile
Project financing
Are you a manufacturer?
Register your company for free in this directory, add your company information and keep it up to date.
Free listing · No upfront cost
FishMatch helps prepare aquaculture RFQs and source relevant suppliers. Supplier listings are for independent research and reference, not automatic matching — buyer follow-up and supplier selection are handled by FishMatch.
Fish Farming Suppliers: Aquaculture Procurement of Equipment
Equipment quotes differ in scope as much as in price. Use this checklist before choosing aerators, RAS components, feeders or a turnkey package.
1.Write one specification first
Species, target tonnes per year, system type, site, water source and budget. Quotes built on the same brief can be compared line by line; quotes built on different assumptions cannot.
2.Ask for the same delivery terms
Request every price on the same Incoterms® 2020 rule (for example FOB or CIF, named port). Mixed terms hide freight, insurance and duty differences (ICC).
3.Separate equipment from design and installation
Ask suppliers to price equipment, engineering, installation supervision, commissioning and training as separate lines, so missing scope is visible.
4.Check the technical basis
For RAS, ask how flow, oxygen and biofilter capacity were sized from the feed load — the method in Timmons & Ebeling is a common reference.
5.Confirm certification needs early
If your buyers require ASC or BAP, tell suppliers before design and check the applicable standard. FAO's certification guidelines provide a broader reference for environmental, social, food-safety and animal-health criteria; they do not certify a supplier or a project.
6.Compare total cost, not unit price
Include spares, warranty terms, currency, payment milestones and lead time. The lowest equipment price is not always the lowest project cost.
How FishMatch Group handles aquaculture procurement
A specialist reviews your brief, asks for anything missing, then contacts relevant suppliers privately. Available proposals are organised in one comparison, line by line, with differences and exclusions identified. FishMatch Group is supplier-neutral: it does not manufacture equipment, build or operate farms, or lend. Supplier names, websites and contact details stay confidential. We do not guarantee a number of proposals, the lowest price or financing approval.
Open the RFQ form →Planning a shrimp farm? Get a free cost estimate from your pond size, stocking density and harvest goals
Plan the budget before you buy equipment
Size the system and check the budget first, then send one specification so supplier quotes can be compared line by line.
Not sure where to start?
Tell us your farm size, species and budget status. Our team reviews your brief, coordinates suitable provider responses and presents them privately through FishMatch; availability is not guaranteed.
Start sourcingProject, seafood supply or RFQ service: which one do you need?
Commercial aquaculture project
Building, expanding or equipping a fish farm, shrimp farm, hatchery, RAS or processing line. You describe species, capacity, system, site and water.
Start an equipment requestSeafood sourcing
Buying farmed fish or shrimp as a product, not equipment. A separate brief asks for species, specification, volume, destination and cold chain.
Open the seafood sourcing briefHuman-reviewed RFQ service
There is no instant or automated supplier match. Manufacturer research happens after the project requirement is clear and is reviewed by the FishMatch team before any supplier is approached. No quote, price or financing is guaranteed.
How the review works
Buyers pay nothing. Managed requests start at USD 250,000: total project value for farms and equipment, or total annual or seasonal program value for seafood. FishMatch Group owns no farms or stock and guarantees no availability, price, quality, approval or delivery. Hobby, aquarium, backyard and ornamental systems are outside this service; the free calculators stay open to everyone. Free calculators
Explore aquaculture and RAS suppliers here for research and market discovery, or start with your project requirements so FishMatch can help structure the RFQ and identify relevant system providers for that specific production plan.
Directory — research
Browse categories, countries and technology types to understand the market and which system types exist. Nothing is requested and no supplier is contacted.
Project sourcing — RFQ
Define species, system, production target and site conditions, size the requirement with the planning tools, and build one structured RFQ. Manufacturer research follows the requirement.
- FishMatch helps prepare aquaculture RFQs and source relevant suppliers.
- Supplier and manufacturer listings are provided for independent research, transparency and reference. Listing does not constitute certification, endorsement, qualification for a specific project or automatic introduction.
- Buyer follow-up and supplier selection are handled by FishMatch.
There is no instant or automated supplier match. Manufacturer research happens after the project requirement is clear and is reviewed by the FishMatch team before any supplier is approached.
Manufacturers can register in the free directory and keep their company details up to date. Being listed is a research and visibility surface — it does not create an automatic connection to buyers, and it does not replace the human sourcing process.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
Buyer guides
Fish farming equipment buying guides
Practical guides for specifying, comparing and buying aquaculture equipment for commercial fish and shrimp projects.
- Shrimp farming equipment: what to buy and how to start
- RAS farm cost: CAPEX, OPEX and comparing system prices
- How to choose aerators for fish and shrimp ponds
- How to choose automatic fish feeders
- Aquaculture pumps, pipework and valves: buyer's guide
- UV and ozone disinfection equipment for fish farms
- Fish cage farm equipment: collars, nets and moorings
- Fish farm automation and monitoring systems
- Water quality testing and lab equipment
- How to import aquaculture equipment
- Why the cheapest equipment quote can cost more
- Equipment purchase contracts and payment terms
Short answer
How do you source Equipment for a commercial aquaculture project?
Start from the process requirement — biomass, flow, water quality target and site constraints — not from a product catalogue. FishMatch Group converts that requirement into a specification for Equipment, sources it from matched manufacturers and integrators across Europe, Asia and the Americas, and returns like-for-like quotations with lead times, energy consumption and lifetime running cost stated in the same format.
- What we compare:
- Scope, capacity, energy use, lead time and total cost of ownership
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Delivery terms:
- Quotations normalised to EXW / FOB / CIF so prices are like-for-like
- Cost to buyers:
- No fee charged to the buyer
Before you request quotes
Equipment scope
What equipment does a commercial aquaculture project actually need?
A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.
Which equipment should be specified before requesting quotes?
Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.
Can equipment be sourced in stages?
Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.