For projects from USD 250,000

How to submit an aquaculture RFQ and how we review the responses

Short answer: you send one written project request. Our team checks it, asks about anything missing, contacts suitable suppliers for you and sends them the same specification. When responses come back, we line them up on the same scope, terms and open questions and present them to you through FishMatch. You never have to deal with each supplier separately, and you decide what happens next.

Aquaculture monitoring sensors and control panel used to track water quality

Part 1 — Submitting your RFQ

  1. 01

    Describe the project

    Species, farming system, yearly production target, country and site status, water source and power. Rough figures are fine — say which ones are estimates.

  2. 02

    Set the scope and budget

    What you need quoted (full turnkey, a system, or specific equipment), your budget range, funding status and timeline. Requests from about USD 250,000 can be sent to suppliers.

  3. 03

    Submit one request

    Use the project request form. Your details stay private: suppliers see the specification, not your name, company or contact details.

  4. 04

    Our team reviews it

    A person reads every request. We aim to reply within one business day, usually with a few questions to close gaps before any supplier is approached.

  5. 05

    We contact suitable suppliers for you

    Once the specification is clear, we send the same scope to suppliers that fit the project. All supplier contact runs through FishMatch.

Not sure of your numbers yet? Start with the RFQ checklist or the free calculators — several can open a request already filled in with your results.

Part 2 — How FishMatch reviews the responses

Supplier quotes for the same project often differ in what they include. Before anything reaches you, we check each response against your specification:

What we checkWhy it matters
ScopeIs everything you asked for included — or are key items like installation, water treatment or backup power left out?
Capacity and design basisIs the quote sized for your production target, species and water conditions, or for a different assumption?
Price basisDelivery terms, currency, taxes and what is excluded, so totals can be compared fairly.
Delivery and installationStated lead time, installation and commissioning responsibilities, and site work left to you.
Warranty and after-salesWarranty length and coverage, spare parts, training and local service options.
Open questionsAnything unclear or missing is listed and raised with the supplier before you decide.

You then receive the comparable responses with our notes on differences and open questions. If a quote leaves something out, we go back to the supplier for clarification rather than guessing. For the detailed scoring method, see how to compare RAS quotations.

Technical checklist for your RFQ

Short answer: a request can be quoted on the same basis when it states the species, yearly tonnage, system type, water source and quality, power supply, site status, the scope to be quoted, budget range and timeline — and marks which figures are estimates.

  • Production basis: species, target harvest size, tonnes per year, number of cycles.
  • Design figures: peak water temperature, stocking density, feed rate, oxygen demand and water exchange or recirculation rate — with the calculator results attached.
  • Site: country, land or sea area, water source and test results, grid power and backup needs, permits status.
  • Scope: turnkey, a full system or named equipment; what is excluded (civil works, installation, training).
  • Commercial: budget range, currency, delivery terms wanted, funding status and decision date.
  • Comparison: ask every supplier to state power draw at full load, lead time, warranty and spare-parts plan in writing.

Sources and stated assumptions

  • Source: FishMatch Group's own request review process, described on this page. No external market data is used here.
  • Assumption: requests are sent to suppliers only from about USD 250,000 of project scope.
  • Assumption: our team aims to reply within one business day; supplier quoting time is not promised.
  • Design figures should come from the calculators (each lists its own sources and starting values) or your designer.

Checklist reviewed 13 October 2026.

What we do not do

  • We do not pass your request to an open marketplace or give you a list of supplier contacts.
  • We do not promise how fast suppliers will quote or that a quote will be accepted.
  • We do not certify equipment, guarantee farm performance or lend money.
  • Every request is read by a person; nothing is sent to suppliers automatically.

Frequently asked questions

Do I contact the suppliers myself?

No. FishMatch contacts suitable suppliers for you and presents their responses. You do not need to manage each supplier separately, and suppliers do not receive your contact details from us.

How long does it take?

We aim to send a first reply from our team within one business day. How long suppliers take to quote depends on the project and the supplier, so we do not promise a quote date.

What if my project is below USD 250,000?

Requests below about USD 250,000 are not sent to suppliers, but you can still use the free calculators, planners and guides to prepare your project.

Does FishMatch choose the supplier for me?

No. We line up the responses on the same basis and point out differences and open questions; the decision stays with you.

Ready to send your project?

For projects from about USD 250,000. Smaller projects can still use the free planning tools.

Short answer

How do you prepare a reviewed RFQ for RFQ Process?

Submit a private request for RFQ Process with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.