FishMatch Group · EPC Marketplace

A neutral EPC marketplace for large aquaculture projects.

Sponsors bring the project. FishMatch prepares the bankable package. Selected EPC partners are asked to respond to a like-for-like scope, handled confidentially. No equipment sales, no channel conflict, no hidden fees to buyers.

How the marketplace works

  1. 1. Confidential intake
    Sponsor submits scope, capacity, site and budget. Identity and financials are not shared without approval.
  2. 2. Bankable package
    We prepare a class-3 CAPEX, technical spec and bankability checklist so every bidder sees the same brief.
  3. 3. EPC shortlist
    2–4 project-matched EPC partners with matching category and country experience are invited to bid.
  4. 4. Like-for-like proposals
    Coordinated response window with a standard cost breakdown, schedule and warranty terms.
  5. 5. Financing intro (optional)
    If needed, we introduce DFIs, leasing or impact-fund partners once the package is ready.
  6. 6. Award & handover
    Sponsor selects the EPC. FishMatch remains available for owner's-engineer support if requested.

EPC packages we coordinate

RAS turnkey packages

100–1,000 t/yr indoor recirculating fish and shrimp systems.

  • • Tanks, filtration, biofilters, degassers, O₂ cones
  • • Control & monitoring, HVAC, power redundancy
  • • Civil, process pipework, effluent treatment
Reference archetype

Shrimp farm EPC

50–500 ha semi-intensive / intensive vannamei and monodon farms.

  • • Pond civil, HDPE lining, drain harvest
  • • Aeration, pumping, biosecurity
  • • Nursery, PL logistics, processing tie-in
Reference archetype

Hatchery EPC

Marine and freshwater hatcheries for PL, fingerlings, smolt.

  • • Broodstock, larval, live-feed rooms
  • • Water treatment, UV/ozone, RAS loops
  • • Off-grid solar / hybrid power
Reference archetype

Processing plant EPC

Reception, filleting, IQF, packing, cold storage.

  • • HACCP / BRC / EU / FDA / GCC compliant layout
  • • Blast freezer, cold rooms, reefer dock
  • • Traceability, effluent, refrigeration plant
Reference archetype

Solar & hybrid power EPC

PV + LFP battery + diesel backup for farms, RAS and cold chain.

  • • Grid-tied, hybrid and off-grid
  • • Load-shifting for aeration and pumping
  • • 15-year LCOE vs diesel modelling
Reference archetype

Water treatment EPC

Intake, reuse, effluent and discharge across aquaculture.

  • • Coagulation, sedimentation, biological, disinfection
  • • Sludge handling, discharge compliance
  • • Reuse and closed-loop design
Reference archetype

EPC vetting criteria

  • Minimum 3 delivered aquaculture references in the target category
  • Documented HSE record and QA/QC procedures
  • Financial capacity to execute the target contract size
  • Local presence or delivery experience in the target country
  • Ability to work under NDA and bank-standard procurement rules
  • Willingness to warranty scope for a defined defect-liability period

Ready to move a project into procurement?

Sponsors and EPC firms engage through the same neutral pipeline. Buyers never pay.

Short answer

What is the fastest way to get quotes for EPC Marketplace?

Submit one structured request for EPC Marketplace. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer