For aquaculture consultants & advisors

Supplier sourcing and RFQ support for aquaculture consultants

We work with the consultant, not around them. Send us one fish, shrimp, hatchery or RAS project and we will help evaluate sourcing options — supplier shortlists, RFQ preparation, technical comparison and financing direction. You stay client-facing, and you decide how involved we are.

How does FishMatch Group work with aquaculture consultants?

We work through the consultant. You send one fish, shrimp, hatchery or RAS project scope; we research suppliers, prepare and normalise the RFQ, run a private enquiry to qualified third-party manufacturers, and return comparable offers you present to your client. You stay client-facing, you keep the technical decision, and we only do as much as you ask us to.

You advise the client. We do the supplier legwork: shortlist, RFQ, comparison table, and — if the client asks — introductions to independent financing providers.

Relationship control

You keep the client. We work through you.

Your client relationship stays with you

Your client relationship stays with you. We work through you, and we do not contact your client unless you ask us to.

  • Your client is not contacted without your written go-ahead.
  • Client identity is withheld from suppliers during outreach.
  • NDA signed on request before any project data is shared.
  • White-label delivery under your own brand if you prefer.
Built for these advisors
  • •Aquaculture consultants
  • •Fish farm consultants
  • •Shrimp farm consultants
  • •RAS consultants & engineers
  • •Hatchery consultants
  • •Seafood processing consultants
  • •Pond farming advisors
  • •Biofloc consultants
  • •Aquafeed & nutrition advisors
  • •Government / NGO project consultants
  • •EPC & project advisors
  • •Procurement consultants
How it works

Six steps — and you stay in front of the client.

1. Send the project scope

Species, system, capacity, country, timeline and indicative budget through the consultant intake form. Drawings optional but they speed everything up.

2. We normalize the RFQ

Missing parameters are flagged — flow rates, biomass, aeration load, power, water source — so suppliers quote identical scope.

3. Supplier shortlist

Documentary screening of candidate manufacturers: registration, export history, references, in-region service, current lead time.

4. Blind outreach

Suppliers are approached under FishMatch Group. Your client's identity stays confidential unless you decide otherwise.

5. Comparison you can present

Offers normalized on scope, incoterms, warranty, spares and lead time — formatted so you can put them in front of your client.

6. You stay in the room

You run the client meetings. We join technical calls only if you invite us, in your name if you prefer white-label.

Supplier sourcing & RFQ support

What we handle behind the scenes

  • Supplier sourcing across RAS, ponds, cages, hatcheries, biofloc, feed, processing, cold chain, water treatment and aeration.
  • RFQ preparation: specification templates, missing-data checklists and scope normalization.
  • Technical comparison: offers aligned line by line instead of PDFs in different formats.
  • Project matching: reference architectures and CAPEX bands for the archetype your client is building.
  • Financing direction: documentation prep and introductions to independent providers — no credit decisions from us.
  • Confidentiality: NDA on request, blind outreach by default, no direct contact with your client without your written go-ahead.

How we work together

Simple: send us one project and we help evaluate sourcing options. Nothing to pay, no signup and no exclusivity. If a supply contract closes, the fee is agreed in writing on the supplier side first.

  • Sending a project costs you and your client nothing.
  • You decide how involved we are — background support or joining the technical call.
  • Want to present everything under your own brand? That works too.
  • If a supply contract closes, we agree a simple fee with the supplier side in writing first.
  • Your client stays your client, on this project and the next one.
  • We don't approach your client independently.

FishMatch Group is not a manufacturer, EPC contractor, farm operator or lender. Financing introductions are to independent providers; no credit decision or approval is made by FishMatch Group.

Project-style walkthroughs

What the sourcing and RFQ workflow looks like on a real project

Five common consultant situations, written up the way the work actually runs: what is fixed before suppliers are contacted, how the RFQ is issued, how offers are made comparable, and what the consultant receives at the end.

These are illustrative workflow walkthroughs, not client testimonials or case results. They describe how a project of this type moves through the sourcing and RFQ process. No client, supplier or price data is published, and no savings, delivery or performance outcome is claimed.

Workflow walkthrough 01

RAS grow-out tender — comparing four systems on one design basis

A consultant holds a client brief for an indoor recirculating grow-out unit but has quotes that cannot be compared: different biofilter sizing assumptions, different oxygen scope, different incoterms.

Project type
Indoor RAS grow-out
Consultant input
Target annual tonnage, species, water temperature, site power
Suppliers invited
4 (2 consultant-nominated, 2 added from the sourcing desk)
Client identity
Withheld from suppliers throughout
How it runs
  1. 1 · Design basis fixed first

    Feed load, TAN production, make-up water percentage, temperature band and oxygen delivery method are written down before any supplier is contacted, so every quote answers the same question.

  2. 2 · Private RFQ issued

    The same scope-of-supply, battery limits, incoterms and warranty text goes to every invited supplier. The consultant's own suppliers are added to the same package.

  3. 3 · Offers normalised

    Offers are re-tabulated line by line: biofilter media volume, degassing, oxygenation, drum filtration, controls, spares, commissioning days, freight and duties.

  4. 4 · Gaps sent back

    Missing lines — instrumentation, alarm redundancy, commissioning scope — go back to the supplier as written clarifications instead of being estimated.

What the consultant receives
  • One comparison table on identical scope and incoterms
  • Written scope-gap list per offer
  • Total evaluated cost including freight, duties and commissioning
  • Consultant-branded summary the client can read without supplier identities

The consultant presents the shortlist. Supplier selection stays with the consultant and the client.

Workflow walkthrough 02

Shrimp hatchery package — splitting one lump-sum quote into comparable lots

A hatchery expansion arrives as a single lump-sum offer with no line detail, making it impossible to advise the client or take it to a lender.

Project type
Shrimp hatchery expansion
Consultant input
Tank plan, target PL output, biosecurity requirements
RFQ structure
Split into 5 lots (tanks, water treatment, aeration, live feed, controls)
Suppliers invited
3 per lot
How it runs
  1. 1 · Lot breakdown

    The single package is decomposed into lots that suppliers can quote accurately, each with its own battery limits and interface points.

  2. 2 · Parallel RFQs

    Each lot goes out separately so specialised suppliers compete on their own strength rather than sub-contracting a scope they do not build.

  3. 3 · Interface check

    Lot boundaries are checked against each other so nothing is quoted twice and nothing falls between two suppliers.

  4. 4 · Reassembly

    Lots are recombined into one client-facing cost structure with the interface responsibilities written down.

What the consultant receives
  • Five lot-level comparison tables
  • Interface and battery-limit matrix
  • Consolidated project cost structure
  • Documented list of exclusions per lot

Lot splitting is a procurement method, not a guarantee of a lower price. Some projects are better served by a single integrator.

Workflow walkthrough 03

Pond farm aeration retrofit — sizing before shopping

A client asks for aerator prices. The consultant does not yet have a defensible oxygen demand figure, so any quote received would be arbitrary.

Project type
Earthen pond aeration retrofit
Consultant input
Pond surface area, stocking plan, temperature range, grid power
Tool used
Aeration sizing and stocking density calculators
Suppliers invited
3, after sizing is agreed
How it runs
  1. 1 · Oxygen demand first

    Standard oxygen transfer requirement is calculated from biomass, temperature and feed load using published aeration relationships, with the assumptions written into the RFQ.

  2. 2 · Equipment-neutral spec

    The RFQ asks for kg O₂/h delivered at site conditions and kWh per kg O₂ — not for a brand or a model number.

  3. 3 · Energy compared, not just price

    Offers are compared on installed cost plus modelled annual energy at the client's tariff, because aeration is an OPEX decision.

  4. 4 · Service reality check

    In-region spares and service capability are requested in writing before shortlisting.

What the consultant receives
  • Documented oxygen demand basis with assumptions
  • Performance-based specification the client can reuse
  • Cost plus modelled energy comparison
  • In-region service and spares confirmation per supplier

Calculator outputs are planning estimates for scoping and RFQ preparation, not engineering design or a guarantee of performance.

Workflow walkthrough 04

Financing readiness — turning a quote pile into a lender-readable pack

A client wants equipment financing. The documentation exists but is scattered across emails, currencies and incoterms, so lenders send it back for clarification.

Project type
Equipment package with external financing
Consultant input
Quotes, project plan, delivery timetable
Tool used
RFQ readiness score and financing eligibility estimator
Financing role
Introduction to independent providers only
How it runs
  1. 1 · Readiness scored

    Scope definition, quote comparability, timeline realism and documentation completeness are scored so the weakest item is fixed first.

  2. 2 · Currency and incoterms aligned

    All offers are restated in one currency and one incoterm so the financed amount is unambiguous.

  3. 3 · Missing documents listed

    Proforma invoices, delivery schedules, warranty terms and payment milestones are requested from suppliers in one round instead of five.

  4. 4 · Introduction, not approval

    The pack is handed to the consultant, who decides which independent financing providers to approach.

What the consultant receives
  • Readiness score with prioritised fix list
  • Single-currency, single-incoterm cost summary
  • Document checklist with status per item
  • Payment-milestone and delivery timetable draft

FishMatch Group is not a lender and makes no credit decision. Financing introductions are to independent providers, and approval, pricing and terms are theirs alone.

Workflow walkthrough 05

Cold chain and processing line — matching capacity to the harvest curve

A processing line is quoted at a throughput that does not match the client's actual harvest profile, which would leave the line idle for most of the year.

Project type
Primary processing and cold chain
Consultant input
Harvest calendar, product formats, target markets
Constraint
Export destination hygiene and traceability requirements
Suppliers invited
4 across line, chilling and cold store
How it runs
  1. 1 · Harvest curve, not peak day

    Required throughput is derived from the monthly harvest profile and shift pattern rather than from a single peak-day number.

  2. 2 · Destination requirements written in

    Hygienic design, materials and traceability requirements for the target export market are stated in the RFQ text so they are priced, not assumed.

  3. 3 · Utilities checked early

    Refrigeration load, water and power demand are requested from each supplier so the site's utility limits are checked before selection.

  4. 4 · Comparison on identical shift basis

    Every offer is compared at the same shifts per day and days per year so throughput claims are directly comparable.

What the consultant receives
  • Throughput basis tied to the harvest calendar
  • Requirements matrix for the target export market
  • Utility demand summary per offer
  • Like-for-like throughput and cost comparison

Compliance with destination-market requirements is verified by the client and the relevant authority; the RFQ only ensures those requirements are quoted against.

What "qualified supplier" means here

Documentary screening — stated plainly.

What is checked
Company registration, export history to the delivery region, reference projects of comparable capacity, in-region service capability and confirmed current lead time.
What is not claimed
No factory audit, no certification, no performance warranty and no guarantee of price, delivery or project outcome. Selection stays with the consultant and the client.
Your existing suppliers
Suppliers you already work with can be added to the same RFQ so every offer is compared on identical scope, incoterms, warranty and lead time.
Consultant intake

Send us one client project

Takes about two minutes. Anything you do not know yet can wait — we will tell you what suppliers still need before they can quote. Your client is not contacted unless you ask us to.

FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities
1. About you
2. The client project
Species *
Suppliers / equipment needed *
3. How involved do you want us to be?
Optional details (helps us move faster)
We work through you. Your client is not contacted unless you ask us to.

Privacy: We use these details to answer your message. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

Consultant FAQ

We work through the consultant. You send one fish, shrimp, hatchery or RAS project scope; we research suppliers, prepare and normalise the RFQ, run a private enquiry to qualified third-party manufacturers, and return comparable offers you present to your client. You stay client-facing, you keep the technical decision, and we only do as much as you ask us to.

Start from the technical scope, not from a supplier list: define species, system, capacity, water source, power and delivery country, then screen candidates on company registration, export history to that region, reference projects of similar capacity, in-region service and current lead time. FishMatch Group performs this documentary screening for each RFQ. It is a paperwork and reference review, not a factory audit or a performance guarantee.

Include pond or tank geometry and count, target production per cycle and per year, stocking density, salinity and temperature range, aeration load in kW per hectare, water exchange assumptions, power source and reliability, site access for containers, and required documentation. Missing aeration and power data is the single most common reason shrimp equipment quotations come back non-comparable.

Four things: supplier sourcing against your scope, RFQ preparation and normalization so every quotation covers the same scope, technical and commercial comparison of the offers, and introductions to independent financing providers when the client asks. FishMatch Group is not a manufacturer, EPC contractor, farm operator or lender.

Yes — that is the whole point. Your client relationship stays with you. You stay the client-facing advisor, you set the agenda and you decide what is shared. If you prefer, offers and comparisons come back under your own brand.

Not unless the consultant asks us to in writing. If the consultant prefers, all communication runs through them and their client's identity is never disclosed to suppliers during the RFQ.

Nothing to send a project and nothing to receive a sourcing view. If a supply contract closes, a fee is agreed in writing on the supplier side before outreach begins. There is no signup, no minimum volume and no exclusivity.

Yes — RAS and post-smolt systems, hatcheries and broodstock facilities, pond and lined-pond grow-out, biofloc systems, sea cages, feed mills and extrusion lines, processing and cold chain, water treatment and aeration. Sourcing scope covers equipment packages and turnkey vendor selection for commercial projects, typically from USD $250K upwards.

Suppliers pass a documentary screening: legal registration, export history, reference projects, in-region service capability and confirmed lead time. This is not an on-site audit, certification or warranty. The consultant and the client retain full control over the final selection.

Keep them. Existing suppliers can be included in the same RFQ so all offers are compared on identical scope, incoterms, warranty and lead time. Many consultants use the platform only to benchmark the quotations they already hold.

We can prepare the technical and cost documentation lenders normally ask for and introduce independent financing providers. FishMatch Group is not a lender or a regulated broker, does not approve credit and cannot promise that any project will be funded.

The sourcing process is built for commercial projects from roughly USD $250K in equipment value. Smaller projects are better served by the public calculators and equipment guides on the site.

Short answer

What is the fastest way to get quotes for For Consultants?

Submit one structured request for For Consultants. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer