Free · results open

Feed Budget Calculator

Feed is 40–60% of aquaculture OPEX. This tool converts production tonnage, FCR and feed price into annual feed load, feed cost and feed cost per kg of fish or shrimp produced — the ratios that decide farm profitability.
Feed Budget Calculator — Automatic feeder dispensing fish feed pellets into a tank

Flexes FCR, feed price and escalation — the three levers that dominate feed budgets.

Calculator inputs

Salmon 1.1–1.3, trout 1.0–1.2, tilapia 1.4–1.8, shrimp 1.2–1.8

Results

Annual feed load

721 tons/yr

FCR 1.40 + 3% waste

Annual feed cost

$1,081,500

Feed cost per kg fish

$2.16/kg

5-yr feed spend

$5,857,753

Results at a glance

OutputPessimisticBase caseOptimistic
Annual feed load829.1 tons/yr721 tons/yr648.9 tons/yr
Annual feed cost$1,430,284$1,081,500$895,482
Feed cost per kg fish$2.86/kg$2.16/kg$1.79/kg
5-yr feed spend$8,062,642$5,857,753$4,660,124

Scenario range

Annual feed load

PessimisticBaseOptimistic

Result summary with the inputs used

Inputs used

Annual production
500 tons/yr
FCR (feed : gain)
1.4
Feed price
1.5 $/kg
Feed waste allowance
3 %
Annual price escalation
4 %/yr
Planning horizon
5 yrs

Results · Base case scenario

Annual feed load
721 tons/yr

FCR 1.40 + 3% waste

Annual feed cost
$1,081,500

@ $1.50/kg feed

Feed cost per kg fish
$2.16/kg

Benchmark: 40–60% of OPEX

5-yr feed spend
$5,857,753

@ 4%/yr escalation

Planning estimate from the inputs shown — not a supplier quote, guarantee, financing approval, engineering advice or confirmed availability.

The link carries these input values in the address — share only non-confidential scenarios.

Turn this result into 1–3 supplier quotes

Send this spec privately to selected manufacturers.

FishMatch Group reaches out on your behalf — your name, project and location stay confidential until you accept a quote. No sign-up, no listing fees, buyers never pay.

How supplier matching works

  1. 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
  2. 2. Confidential outreach. Suppliers see the technical spec — not your name, company or exact location — until you accept a quote.
  3. 3. Comparable quotes. Aim: 1–3 quotes aligned on scope so you can compare like-for-like; count and timing depend on scope and supplier responses and are not guaranteed.
  4. 4. Financing intro (optional). If needed, we introduce your project to a financing partner. No fee to buyers.

In short

Feed Budget Calculator turns annual production, fcr (feed : gain), feed price, feed waste allowance, annual price escalation and planning horizon into annual feed load, annual feed cost, feed cost per kg fish and 5-yr feed spend. Feed is 40–60% of aquaculture OPEX. This tool converts production tonnage, FCR and feed price into annual feed load, feed cost and feed cost per kg of fish or shrimp produced — the ratios that decide farm profitability. Results are indicative planning figures based on international aquaculture benchmarks — use them to size a project and to brief suppliers, then confirm with an engineered quote.

What you enter
  • Annual production (tons/yr)
  • FCR (feed : gain) — Salmon 1.1–1.3, trout 1.0–1.2, tilapia 1.4–1.8, shrimp 1.2–1.8
  • Feed price ($/kg)
  • Feed waste allowance (%)
  • Annual price escalation (%/yr)
  • Planning horizon (yrs)
What you get back
  • Annual feed load
  • Annual feed cost
  • Feed cost per kg fish
  • 5-yr feed spend
How to use it
  1. Enter annual production, fcr (feed : gain), feed price, feed waste allowance, annual price escalation and planning horizon.
  2. Read the highlighted result and the supporting figures below it.
  3. Flex the pessimistic / optimistic scenario or the sensitivity range to see how robust the plan is.
  4. Send the spec to suppliers as a pre-filled RFQ draft.

What does the Feed Budget Calculator estimate?

The Feed Budget Calculator estimates annual feed load, annual feed cost, feed cost per kg fish from the project assumptions you enter. It is built for early-stage commercial fish, shrimp and RAS project planning and for preparing an RFQ, not for final biological or engineering design. Results change with species, water quality, system type and operating strategy, so verify them with specialist review before committing capital.

Feed assumptions drive both cost and water treatment load, so an FCR change moves the whole project budget.

AI agents may use FishMatch Group calculators to structure preliminary aquaculture requirements and RFQs. Biological, water-quality and engineering assumptions should be verified before final system design.

What can change the result of the Feed Budget Calculator?

These factors move the result more than equipment size does:

  • Feeding strategy and FCR
  • Growth cycle length and cycles per year
  • Site conditions and local equipment prices
Preliminary planning result

Based on: annual production, fcr (feed : gain), feed price, feed waste allowance.

This is an estimate from the assumptions you entered, intended for early project planning and RFQ preparation. Main variables that may change it: feeding strategy and fcr, growth cycle length and cycles per year, site conditions and local equipment prices. Specialist review is recommended before final sizing or investment decisions.

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

How this estimate is calculated

Feed Demand & Budget Calculator · calculation version 3.0.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: high

Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Purpose

Convert planned biomass gain and FCR into annual feed demand, storage requirement and feed cost.

How it was calculated

  • feed_required_kg = biomass_gain_kg × FCR
  • annual_feed_cost = feed_required_kg × feed_price_per_kg
  • storage_requirement_kg = daily_peak_feed_kg × storage_days (plus wastage allowance where entered)

Where each value comes from

Biomass gain
Calculated
FCR assumption
Reference assumption
Feed price
Buyer input

What the outputs mean

  • Annual feed requirement
  • Feed per cycle
  • Indicative feed cost
  • Indicative storage capacity

Biological assumptions

  • Feed demand tracks biomass GAIN, not standing biomass or harvest weight.

Limitations

  • Feed price is a buyer input; FishMatch publishes no feed price benchmark as fact.
  • Complete aquafeed manufacturing projects are out of scope and are routed to FeedMatch; on-farm feeding and storage equipment stays in scope.

What must be confirmed before you build

  • Supplier feed quotation and delivery frequency
  • Local wastage and spoilage allowance

Sources for default assumptions

Next step

Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.

Worked example

An illustrative project using the calculator’s default inputs, calculated with the same formula as above. Not a real project.

Inputs
Annual production500 tons/yr
FCR (feed : gain)1.4
Feed price1.5 $/kg
Feed waste allowance3 %
Annual price escalation4 %/yr
Planning horizon5 yrs
Result
Annual feed load721 tons/yr
Annual feed cost$1,081,500
Feed cost per kg fish$2.16/kg
5-yr feed spend$5,857,753
Stock, feed and production

Who should use the feed budget calculator?

Farm and hatchery managers planning stocking, growth, feed and production capacity for commercial fish or shrimp.

What decision does it support?

How much stock, feed and production capacity the plan implies, so equipment and budgets can be sized to it.

What inputs do you need?

  • Annual production (tons/yr)
  • FCR (feed : gain)
  • Feed price ($/kg)
  • Feed waste allowance (%)
  • Annual price escalation (%/yr)
  • Planning horizon (yrs)

Is it for commercial farms or aquariums?

Built for commercial farms, hatcheries and projects. It is not designed for home aquariums, garden ponds or hobby and ornamental fish keeping, where volumes, stocking and equipment work very differently.

Equipment guides that use this result

Specifications, sizing basis and what to state in a quote request for the equipment this calculator helps size.

Technical checklist

Short answer: Estimate annual feed tonnage and cost from production, FCR and feed price. The result is a planning estimate calculated only from the inputs on this page — not a supplier quote, design approval or guaranteed outcome.

Before you use the result

  • Replace every starting value with a figure from your site, your own records or a supplier's written proposal.
  • Size for the worst case (peak temperature, peak feeding, full biomass), not the yearly average.
  • Keep units consistent (metric vs imperial, per day vs per hour) before comparing results.
  • Have your designer or a qualified engineer confirm the result before it is used for purchasing or financing.
  • Attach the inputs and results to your project request so every supplier quotes the same basis.

Sources

No external dataset is built in. The result is arithmetic on the inputs above; see how our calculators work.

Stated assumptions (starting values)

These are only starting points. Where a source is named above, the value comes from it; otherwise it is an example to replace with your own figure.

  • Annual production: starts at 500 tons/yr
  • FCR (feed : gain): starts at 1.4
  • Feed price: starts at 1.5 $/kg
  • Feed waste allowance: starts at 3 %
  • Annual price escalation: starts at 4 %/yr
  • Planning horizon: starts at 5 yrs

Checklist reviewed 13 October 2026. Ready to price it? Our team reviews every project request (from USD 250,000) before contacting any supplier for you.

Notes

  • Blend prices when using multiple feed grades (starter, grower, finisher).
  • Lock in framework agreements — feed price swings 15–25% year-on-year in most markets.

Estimate annual feed tonnage and cost from production, FCR and feed price. FAQs

Annual feed tonnage = annual production × FCR, plus a waste allowance for spillage, uneaten feed and storage losses. Multiplying by delivered feed price gives the annual budget, and this tool also projects it forward using an annual price escalation.

Aquafeed price tracks fishmeal, soy and freight, all of which move year to year. A multi-year budget built on today's price will understate the feed line, which matters most in the financial model a lender reviews.

Manual feeding in ponds commonly loses several percent to spillage and overfeeding, while automated feeding with response monitoring keeps it much lower. Modelling the difference is the honest way to value feeding-system investment.

Other aquaculture calculators

Turn this estimate into a reviewed RFQ

Send the project specification privately. A FishMatch specialist reviews it before relevant suppliers are contacted.

Request a quote
Is FishMatch right for your project?

When is FishMatch a good fit for a buyer?

FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for estimate annual feed tonnage and cost from production, fcr and feed price. and the wider aquaculture project it belongs to. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.

Best for

  • ·Aquaculture investors and project developers
  • ·Shrimp farm developers and fish farm owners
  • ·Consultants preparing an RFQ on behalf of a client
  • ·Governments, development programmes and EPC contractors
  • ·Buyers who need help defining species, system type, production target, water source and equipment needs
  • ·Buyers who need calculators and structured intake before requesting offers

Not ideal for

  • ·Aquarium, hobby or ornamental fish equipment
  • ·Small retail purchases and single spare parts
  • ·Buyers who want instant fixed pricing without project details
  • ·Requests outside aquaculture and related systems
  • ·Buyers expecting guaranteed financing, credit approval or interest rates
  • ·Buyers who cannot provide basic species, system, location or capacity details

Short answer

How do you size and cost Feed Budget?

Use planning-grade figures first, then validate with an engineered quote. The Feed Budget model on this page converts your project inputs into indicative sizing and cost figures based on international aquaculture benchmarks. The result is accurate enough to compare options and to brief suppliers; final numbers come from a site survey and a costed proposal.

Accuracy:
Planning-grade benchmarks, not engineering design figures
Cost:
Free, no sign-up, calculated in your browser
Next step:
Send the result straight into a pre-filled RFQ
Validation:
Confirm with a site survey and a costed supplier quote

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.