Free · results open

Fish Growth Calculator: SGR Formula and Days to Harvest

Specific growth rate formula: SGR (% per day) = 100 × (ln final weight − ln initial weight) ÷ days. Rearranged, days to harvest = ln(final ÷ initial weight) ÷ (SGR ÷ 100) — for example, 30 g to 500 g at 1.5% per day takes about 188 days. Enter your weights and SGR below; SGR falls as fish grow, so split long cycles into phases.
Fish Growth Calculator — Fish swimming in an aquaculture tank

SGR flexed ±15–20% to reflect health, temperature and feed-quality variance.

Calculator inputs

Results

Time to harvest

188 days

≈ 6.2 months

Weight multiplier

16.7×

Results at a glance

OutputPessimisticBase caseOptimistic
Time to harvest234 days188 days163 days
Weight multiplier16.7×16.7×16.7×

Scenario range

Time to harvest

PessimisticBaseOptimistic

Result summary with the inputs used

Inputs used

Starting weight
30 g
Target harvest weight
500 g
SGR (% body weight/day)
1.5 %

Results · Base case scenario

Time to harvest
188 days

≈ 6.2 months

Weight multiplier
16.7×

Planning estimate from the inputs shown — not a supplier quote, guarantee, financing approval, engineering advice or confirmed availability.

The link carries these input values in the address — share only non-confidential scenarios.

Turn this result into 1–3 supplier quotes

Send this spec privately to selected manufacturers.

FishMatch Group reaches out on your behalf — your name, project and location stay confidential until you accept a quote. No sign-up, no listing fees, buyers never pay.

How supplier matching works

  1. 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
  2. 2. Confidential outreach. Suppliers see the technical spec — not your name, company or exact location — until you accept a quote.
  3. 3. Comparable quotes. Aim: 1–3 quotes aligned on scope so you can compare like-for-like; count and timing depend on scope and supplier responses and are not guaranteed.
  4. 4. Financing intro (optional). If needed, we introduce your project to a financing partner. No fee to buyers.
Quick answer

How long does it take to grow fish to harvest size?

Growth follows temperature, feed and stocking density. Tilapia commonly reach 500 g in 5–7 months at 26–30 °C, vannamei reach 18–20 g in 90–110 days, and salmon need 14–24 months to 4–5 kg. Enter your start weight, target weight and water temperature for an indicative cycle time.

In short

Fish Growth Calculator turns starting weight, target harvest weight and sgr (% body weight/day) into time to harvest and weight multiplier. Specific Growth Rate (SGR) is the daily % weight gain. Use it to estimate days from stocking to market-size harvest. Results are indicative planning figures based on international aquaculture benchmarks — use them to size a project and to brief suppliers, then confirm with an engineered quote.

What you enter
  • Starting weight (g)
  • Target harvest weight (g)
  • SGR (% body weight/day) (%)
What you get back
  • Time to harvest
  • Weight multiplier
How to use it
  1. Enter starting weight, target harvest weight and sgr (% body weight/day).
  2. Read the highlighted result and the supporting figures below it.
  3. Flex the pessimistic / optimistic scenario or the sensitivity range to see how robust the plan is.
  4. Send the spec to suppliers as a pre-filled RFQ draft.

What does the Fish Growth Calculator estimate?

The Fish Growth Calculator estimates time to harvest, weight multiplier from the project assumptions you enter. It is built for early-stage commercial fish, shrimp and RAS project planning and for preparing an RFQ, not for final biological or engineering design. Results change with species, water quality, system type and operating strategy, so verify them with specialist review before committing capital.

Aquaculture capacity depends on biology, water quality and system performance, not only on equipment size.

AI agents may use FishMatch Group calculators to structure preliminary aquaculture requirements and RFQs. Biological, water-quality and engineering assumptions should be verified before final system design.

What can change the result of the Fish Growth Calculator?

These factors move the result more than equipment size does:

  • Species and strain
  • Water temperature profile
  • Feeding strategy and FCR
  • Target harvest weight
Preliminary planning result

Based on: starting weight, target harvest weight, sgr (% body weight/day).

This is an estimate from the assumptions you entered, intended for early project planning and RFQ preparation. Main variables that may change it: species and strain, water temperature profile, feeding strategy and fcr, target harvest weight. Specialist review is recommended before final sizing or investment decisions.

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

How this estimate is calculated

Fish Growth Calculator · calculation version 0.9.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate · methodology review pending

Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Purpose

Specific Growth Rate (SGR) is the daily % weight gain. Use it to estimate days from stocking to market-size harvest.

How it was calculated

  • Formula documentation for this tool has not yet been individually reviewed and published.

Where each value comes from

Starting weight
Buyer input
Target harvest weight
Buyer input
SGR (% body weight/day)
Buyer input

Limitations

  • This tool has not yet passed the documented-methodology review. Treat every output as an unverified planning estimate.
  • SGR drops as fish grow — split the cycle into 2–3 phases for a more accurate estimate.

What must be confirmed before you build

  • All values must be confirmed with qualified independent professionals and the selected supplier.

Sources for default assumptions

Next step

Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.

Worked example

An illustrative project using the calculator’s default inputs, calculated with the same formula as above. Not a real project.

Inputs
Starting weight30 g
Target harvest weight500 g
SGR (% body weight/day)1.5 %
Result
Time to harvest188 days
Weight multiplier16.7×
Stock, feed and production

Who should use the fish growth calculator?

Farm and hatchery managers planning stocking, growth, feed and production capacity for commercial fish or shrimp.

What decision does it support?

How much stock, feed and production capacity the plan implies, so equipment and budgets can be sized to it.

What inputs do you need?

  • Starting weight (g)
  • Target harvest weight (g)
  • SGR (% body weight/day) (%)

Is it for commercial farms or aquariums?

Built for commercial farms, hatcheries and projects. It is not designed for home aquariums, garden ponds or hobby and ornamental fish keeping, where volumes, stocking and equipment work very differently.

Technical checklist

Short answer: Growth days The result is a planning estimate calculated only from the inputs on this page — not a supplier quote, design approval or guaranteed outcome.

Before you use the result

  • Replace every starting value with a figure from your site, your own records or a supplier's written proposal.
  • Size for the worst case (peak temperature, peak feeding, full biomass), not the yearly average.
  • Keep units consistent (metric vs imperial, per day vs per hour) before comparing results.
  • Verify before you buy: Growth rate for your strain, temperature and feed — local trial data beats book values.
  • Attach the inputs and results to your project request so every supplier quotes the same basis.

Sources

No external dataset is built in. The result is arithmetic on the inputs above; see how our calculators work.

Stated assumptions (starting values)

These are only starting points. Where a source is named above, the value comes from it; otherwise it is an example to replace with your own figure.

  • Starting weight: starts at 30 g
  • Target harvest weight: starts at 500 g
  • SGR (% body weight/day): starts at 1.5 %

Checklist reviewed 13 October 2026. Ready to price it? Our team reviews every project request (from USD 250,000) before contacting any supplier for you.

Notes

  • SGR drops as fish grow — split the cycle into 2–3 phases for a more accurate estimate.

What this result is — and is not

  • Use: Days to harvest weight from a specific growth rate.
  • Planning estimate, not a supplier quote or guarantee. It only reflects the inputs above.
  • Verify before you buy: Growth rate for your strain, temperature and feed — local trial data beats book values.
Commercial project route

Is your project a fit?

FishMatch Group handles commercial B2B projects with a total budget of USD 250,000 or more — new farms, hatcheries, RAS, cages, processing or expansions. The buyer sends one brief; our team reviews and structures the RFQ, then approaches suitable suppliers on the buyer's behalf. Buyers are not put in direct contact with manufacturers at this stage. Smaller or idea-stage projects can start with the calculators below and send the RFQ once scope and budget are clearer.

Which inputs change the estimate and the RFQ?

Calculator results and supplier quotes both depend on: species and life stage, production target (tonnes per year or PL per cycle), water source and quality (temperature, salinity, flow), system design (pond, cage, RAS, hatchery, processing), site and access, energy supply and price, permits, and timeline.

Calculator figures are planning estimates based on stated assumptions — not engineering designs or supplier quotes. Growth, survival and output depend on project-specific biology and operating conditions and are never guaranteed. Formulas, assumptions and sources: calculator methodology.

2. Equipment & project sourcing

Send a structured RFQ. A person checks scope and budget before any supplier is approached.

Start the project RFQ

3. Financing (separate)

Financing is a separate track. FishMatch Group does not lend or guarantee financing.

Aquaculture financing

Growth days FAQs

Days to harvest = ln(target weight ÷ starting weight) ÷ SGR × 100, using specific growth rate as a percentage of body weight per day. Tilapia commonly reaches 600–800 g in 6–8 months and Atlantic salmon 4–5 kg in 14–24 months at sea, depending on temperature.

Specific growth rate is the daily percentage increase in body weight. The reliable source is your own historical batch data; published species figures are a starting point only, because SGR falls as fish get larger and varies strongly with water temperature.

Cycle length sets how many harvests a year the site produces, which drives annual tonnage, feed budget and peak standing biomass. Suppliers size tanks, oxygen and filtration against peak biomass, so the growth model is an input to almost every equipment quote.

The usual causes are sub-optimal temperature, poor feed quality or feed rate, low dissolved oxygen, and overstocking. Growth modelling assumes feed and oxygen are never limiting — real ponds rarely behave that perfectly.

Divide the grow-out time by your season, then add down-time for harvest, drying and disinfection between cycles. Indoor RAS runs more cycles per year because temperature is stable.

Other aquaculture calculators

Turn this estimate into a reviewed RFQ

Send the project specification privately. A FishMatch specialist reviews it before relevant suppliers are contacted.

Request a quote
Is FishMatch right for your project?

When is FishMatch a good fit for a buyer?

FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for growth days and the wider aquaculture project it belongs to. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.

Best for

  • ·Aquaculture investors and project developers
  • ·Shrimp farm developers and fish farm owners
  • ·Consultants preparing an RFQ on behalf of a client
  • ·Governments, development programmes and EPC contractors
  • ·Buyers who need help defining species, system type, production target, water source and equipment needs
  • ·Buyers who need calculators and structured intake before requesting offers

Not ideal for

  • ·Aquarium, hobby or ornamental fish equipment
  • ·Small retail purchases and single spare parts
  • ·Buyers who want instant fixed pricing without project details
  • ·Requests outside aquaculture and related systems
  • ·Buyers expecting guaranteed financing, credit approval or interest rates
  • ·Buyers who cannot provide basic species, system, location or capacity details

Short answer

How do you size and cost Fish Growth?

Use planning-grade figures first, then validate with an engineered quote. The Fish Growth model on this page converts your project inputs into indicative sizing and cost figures based on international aquaculture benchmarks. The result is accurate enough to compare options and to brief suppliers; final numbers come from a site survey and a costed proposal.

Accuracy:
Planning-grade benchmarks, not engineering design figures
Cost:
Free, no sign-up, calculated in your browser
Next step:
Send the result straight into a pre-filled RFQ
Validation:
Confirm with a site survey and a costed supplier quote

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.