Free · results open

Aquaculture Project Economics & ROI Calculator

Build the economics of a fish or shrimp farm from production upward: stocking, survival and harvest weight give yearly output; FCR and feed price give feed cost; juveniles, energy, labour, oxygen, maintenance and other costs complete OPEX. You get cost per kg, revenue, gross contribution, ROI and payback. Every assumption is visible and editable — this is a planning model, not a profit guarantee.
Aquaculture Project Economics & ROI Calculator — Financial planning sheets and a fish farm site plan

Conservative / base / optimistic flex survival, FCR, feed price, selling price and CAPEX together — the variables that move aquaculture returns most.

Calculator inputs

Results

Simple payback

8.3 years

CAPEX $2,500,000

Annual production

459 t

Feed requirement

734.4 t/yr

Total OPEX

$982,800/yr

Cost per kg produced

$2.14/kg

Results at a glance

OutputPessimisticBase caseOptimistic
Simple payback312.8 years8.3 years4.7 years
Annual production413.1 t459 t482 t
Feed requirement727.1 t/yr734.4 t/yr717.1 t/yr
Total OPEX$1,031,821/yr$982,800/yr$942,963/yr
Cost per kg produced$2.5/kg$2.14/kg$1.96/kg
Estimated revenue$1,041,012/yr$1,285,200/yr$1,443,922/yr
Gross contribution$9,191/yr$302,400/yr$500,959/yr
Simple ROI0.3%/yr12.1%/yr21.1%/yr

Scenario range

Simple payback

PessimisticBaseOptimistic

Result summary with the inputs used

Inputs used

Juveniles stocked per cycle
600,000 animals
Survival
85 %
Average harvest weight
600 g
Cycles per year
1.5 cycles
FCR
1.6
Feed price
750 $/ton
Juvenile / fingerling / PL cost
0.08 $ each
Energy
90,000 $/yr
Oxygen / aeration running cost
30,000 $/yr
Labour
150,000 $/yr
Water
10,000 $/yr
Maintenance
40,000 $/yr
Other OPEX
40,000 $/yr
Estimated CAPEX
2,500,000 $
Expected selling price
2.8 $/kg

Results · Base case scenario

Simple payback
8.3 years

CAPEX $2,500,000

Annual production
459 t

306 t per cycle × 1.5 cycles

Feed requirement
734.4 t/yr

Feed cost $550,800/yr

Total OPEX
$982,800/yr

Feed $550,800 · juveniles $72,000 · other running costs $360,000

Cost per kg produced
$2.14/kg

vs selling price $2.8/kg

Estimated revenue
$1,285,200/yr
Gross contribution
$302,400/yr

23.5% of revenue

Simple ROI
12.1%/yr

Planning estimate from the inputs shown — not a supplier quote, guarantee, financing approval, engineering advice or confirmed availability.

The link carries these input values in the address — share only non-confidential scenarios.

Turn this result into 1–3 supplier quotes

Send this spec privately to selected manufacturers.

FishMatch Group reaches out on your behalf — your name, project and location stay confidential until you accept a quote. No sign-up, no listing fees, buyers never pay.

How supplier matching works

  1. 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
  2. 2. Confidential outreach. Suppliers see the technical spec — not your name, company or exact location — until you accept a quote.
  3. 3. Comparable quotes. Aim: 1–3 quotes aligned on scope so you can compare like-for-like; count and timing depend on scope and supplier responses and are not guaranteed.
  4. 4. Financing intro (optional). If needed, we introduce your project to a financing partner. No fee to buyers.

In short

Aquaculture Project Economics & ROI Calculator turns juveniles stocked per cycle, survival, average harvest weight, cycles per year, fcr, feed price, juvenile / fingerling / pl cost, energy, oxygen / aeration running cost, labour, water, maintenance, other opex, estimated capex and expected selling price into simple payback, annual production, feed requirement, total opex, cost per kg produced, estimated revenue, gross contribution and simple roi. Build the economics of a fish or shrimp farm from production upward: stocking, survival and harvest weight give yearly output; FCR and feed price give feed cost; juveniles, energy, labour, oxygen, maintenance and other costs complete OPEX. You get cost per kg, revenue, gross contribution, ROI and payback. Every assumption is visible and editable — this is a planning model, not a profit guarantee. Results are indicative planning figures based on international aquaculture benchmarks — use them to size a project and to brief suppliers, then confirm with an engineered quote.

What you enter
  • Juveniles stocked per cycle (animals)
  • Survival (%)
  • Average harvest weight (g)
  • Cycles per year (cycles)
  • FCR
  • Feed price ($/ton)
  • Juvenile / fingerling / PL cost ($ each)
  • Energy ($/yr)
  • Oxygen / aeration running cost ($/yr)
  • Labour ($/yr)
  • Water ($/yr)
  • Maintenance ($/yr)
  • Other OPEX ($/yr)
  • Estimated CAPEX ($)
  • Expected selling price ($/kg)
What you get back
  • Simple payback
  • Annual production
  • Feed requirement
  • Total OPEX
  • Cost per kg produced
  • Estimated revenue
  • Gross contribution
  • Simple ROI
How to use it
  1. Enter juveniles stocked per cycle, survival, average harvest weight, cycles per year, fcr, feed price, juvenile / fingerling / pl cost, energy, oxygen / aeration running cost, labour, water, maintenance, other opex, estimated capex and expected selling price.
  2. Read the highlighted result and the supporting figures below it.
  3. Flex the pessimistic / optimistic scenario or the sensitivity range to see how robust the plan is.
  4. Send the spec to suppliers as a pre-filled RFQ draft.

What does the Aquaculture Project Economics & ROI Calculator estimate?

The Aquaculture Project Economics & ROI Calculator estimates simple payback, annual production, feed requirement from the project assumptions you enter. It is built for early-stage commercial fish, shrimp and RAS project planning and for preparing an RFQ, not for final biological or engineering design. Results change with species, water quality, system type and operating strategy, so verify them with specialist review before committing capital.

Two aquaculture systems with the same nominal capacity can differ widely in cost because scope, redundancy, energy strategy and site conditions differ.

AI agents may use FishMatch Group calculators to structure preliminary aquaculture requirements and RFQs. Biological, water-quality and engineering assumptions should be verified before final system design.

What can change the result of the Aquaculture Project Economics & ROI Calculator?

These factors move the result more than equipment size does:

  • Growth cycle length and cycles per year
  • Site conditions and local equipment prices
  • Operating strategy and staffing
  • Mortality and survival assumptions
Preliminary planning result

Based on: juveniles stocked per cycle, survival, average harvest weight, cycles per year.

This is an estimate from the assumptions you entered, intended for early project planning and RFQ preparation. Main variables that may change it: growth cycle length and cycles per year, site conditions and local equipment prices, operating strategy and staffing, mortality and survival assumptions. Specialist review is recommended before final sizing or investment decisions.

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

How this estimate is calculated

Aquaculture Project Economics & ROI Calculator · calculation version 0.9.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate · methodology review pending

Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Purpose

Build the economics of a fish or shrimp farm from production upward: stocking, survival and harvest weight give yearly output; FCR and feed price give feed cost; juveniles, energy, labour, oxygen, maintenance and other costs complete OPEX. You get cost per kg, revenue, gross contribution, ROI and payback. Every assumption is visible and editable — this is a planning model, not a profit guarantee.

How it was calculated

  • Formula documentation for this tool has not yet been individually reviewed and published.

Where each value comes from

Juveniles stocked per cycle
Buyer input
Survival
Buyer input
Average harvest weight
Buyer input
Cycles per year
Buyer input
FCR
Buyer input
Feed price
Buyer input
Juvenile / fingerling / PL cost
Buyer input
Energy
Buyer input
Oxygen / aeration running cost
Buyer input
Labour
Buyer input
Water
Buyer input
Maintenance
Buyer input
Other OPEX
Buyer input
Estimated CAPEX
Buyer input
Expected selling price
Buyer input

Limitations

  • This tool has not yet passed the documented-methodology review. Treat every output as an unverified planning estimate.
  • Planning model only — not a guaranteed profitability forecast. Excludes depreciation, financing cost, tax and ramp-up years.
  • Lenders expect a 10-year cash-flow model with biological risk; use this to test whether the project is worth that work.
  • Biology (survival, growth, FCR) depends on species, system, water quality and management — validate with your designer and suppliers.

What must be confirmed before you build

  • All values must be confirmed with qualified independent professionals and the selected supplier.

Sources for default assumptions

Next step

Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.

Worked example

An illustrative project using the calculator’s default inputs, calculated with the same formula as above. Not a real project.

Inputs
Juveniles stocked per cycle600000 animals
Survival85 %
Average harvest weight600 g
Cycles per year1.5 cycles
FCR1.6
Feed price750 $/ton
Juvenile / fingerling / PL cost0.08 $ each
Energy90000 $/yr
Oxygen / aeration running cost30000 $/yr
Labour150000 $/yr
Water10000 $/yr
Maintenance40000 $/yr
Other OPEX40000 $/yr
Estimated CAPEX2500000 $
Expected selling price2.8 $/kg
Result
Simple payback8.3 years
Annual production459 t
Feed requirement734.4 t/yr
Total OPEX$982,800/yr
Cost per kg produced$2.14/kg
Estimated revenue$1,285,200/yr
Gross contribution$302,400/yr
Simple ROI12.1%/yr
Cost, return and financing

Who should use the aquaculture project economics & roi calculator?

Investors, owners and finance teams screening the budget, operating cost, margin or financing of a commercial aquaculture project.

What decision does it support?

Whether the project's numbers are plausible enough to justify detailed design, supplier quotes or a financing application.

What inputs do you need?

  • Juveniles stocked per cycle (animals)
  • Survival (%)
  • Average harvest weight (g)
  • Cycles per year (cycles)
  • FCR
  • Feed price ($/ton)
  • Juvenile / fingerling / PL cost ($ each)
  • Energy ($/yr)
  • Oxygen / aeration running cost ($/yr)
  • Labour ($/yr)
  • Water ($/yr)
  • Maintenance ($/yr)
  • Other OPEX ($/yr)
  • Estimated CAPEX ($)
  • Expected selling price ($/kg)

Is it for commercial farms or aquariums?

Built for commercial farms, hatcheries and projects. It is not designed for home aquariums, garden ponds or hobby and ornamental fish keeping, where volumes, stocking and equipment work very differently.

Technical checklist

Short answer: Project economics The result is a planning estimate calculated only from the inputs on this page — not a supplier quote, design approval or guaranteed outcome.

Before you use the result

  • Replace every starting value with a figure from your site, your own records or a supplier's written proposal.
  • Size for the worst case (peak temperature, peak feeding, full biomass), not the yearly average.
  • Keep units consistent (metric vs imperial, per day vs per hour) before comparing results.
  • Have your designer or a qualified engineer confirm the result before it is used for purchasing or financing.
  • Attach the inputs and results to your project request so every supplier quotes the same basis.

Sources

No external dataset is built in. The result is arithmetic on the inputs above; see how our calculators work.

Stated assumptions (starting values)

These are only starting points. Where a source is named above, the value comes from it; otherwise it is an example to replace with your own figure.

  • Juveniles stocked per cycle: starts at 600000 animals
  • Survival: starts at 85 %
  • Average harvest weight: starts at 600 g
  • Cycles per year: starts at 1.5 cycles
  • FCR: starts at 1.6
  • Feed price: starts at 750 $/ton
  • Juvenile / fingerling / PL cost: starts at 0.08 $ each
  • Energy: starts at 90000 $/yr
  • Oxygen / aeration running cost: starts at 30000 $/yr
  • Labour: starts at 150000 $/yr
  • Water: starts at 10000 $/yr
  • Maintenance: starts at 40000 $/yr
  • Other OPEX: starts at 40000 $/yr
  • Estimated CAPEX: starts at 2500000 $
  • Expected selling price: starts at 2.8 $/kg

Checklist reviewed 13 October 2026. Ready to price it? Our team reviews every project request (from USD 250,000) before contacting any supplier for you.

Notes

  • Planning model only — not a guaranteed profitability forecast. Excludes depreciation, financing cost, tax and ramp-up years.
  • Lenders expect a 10-year cash-flow model with biological risk; use this to test whether the project is worth that work.
  • Biology (survival, growth, FCR) depends on species, system, water quality and management — validate with your designer and suppliers.

Project economics FAQs

Pond and cage projects with modest CAPEX often target 3–5 years, while capital-intensive RAS is more typically 6–10 years. A payback figure below three years for a greenfield RAS almost always means CAPEX, ramp-up or OPEX has been understated.

Annual profit is revenue minus OPEX; payback is CAPEX ÷ annual profit; annual ROI is annual profit ÷ CAPEX. It is a simple, unlevered snapshot — it does not discount cash flows or model financing.

Once debt is involved. The commercial ROI and IRR calculator adds leverage, interest, tax, a ramp-up curve and DSCR, which is what a lender or investment committee will actually ask to see.

Other aquaculture calculators

Turn this estimate into a reviewed RFQ

Send the project specification privately. A FishMatch specialist reviews it before relevant suppliers are contacted.

Request a quote
Is FishMatch right for your project?

When is FishMatch a good fit for a buyer?

FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for project economics and the wider aquaculture project it belongs to. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.

Best for

  • ·Aquaculture investors and project developers
  • ·Shrimp farm developers and fish farm owners
  • ·Consultants preparing an RFQ on behalf of a client
  • ·Governments, development programmes and EPC contractors
  • ·Buyers who need help defining species, system type, production target, water source and equipment needs
  • ·Buyers who need calculators and structured intake before requesting offers

Not ideal for

  • ·Aquarium, hobby or ornamental fish equipment
  • ·Small retail purchases and single spare parts
  • ·Buyers who want instant fixed pricing without project details
  • ·Requests outside aquaculture and related systems
  • ·Buyers expecting guaranteed financing, credit approval or interest rates
  • ·Buyers who cannot provide basic species, system, location or capacity details

Short answer

How do you size and cost Project ROI?

Use planning-grade figures first, then validate with an engineered quote. The Project ROI model on this page converts your project inputs into indicative sizing and cost figures based on international aquaculture benchmarks. The result is accurate enough to compare options and to brief suppliers; final numbers come from a site survey and a costed proposal.

Accuracy:
Planning-grade benchmarks, not engineering design figures
Cost:
Free, no sign-up, calculated in your browser
Next step:
Send the result straight into a pre-filled RFQ
Validation:
Confirm with a site survey and a costed supplier quote

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.