For projects from USD 250,000
Choosing aquaculture equipment, feed and farm design as one project
Short answer: start from species, site and target tonnes; choose the production system; then size water treatment, oxygen, feeding, monitoring and biosecurity; then pick feed by growth stage and compare it on cost per kg of fish. Cost the whole farm (CAPEX and OPEX) before asking for prices, and send one combined request so quotes can be compared on the same scope.
Five connected commercial aquaculture paths
For farm operators and project buyers, not pet-health advice, ornamental ponds or DIY builds. Compare species, life stage, capacity, measured water, equipment scope and project stage before prices.
Equipment checklist
Compare itemised duties, interfaces and installed scope; enter dated equipment quotes, not catalog capacity or an assumed saving.
Farm business planning
Compare the same saleable harvest, quote boundaries and operating period; leave unpriced costs unresolved rather than treating them as zero.
Commercial shrimp systems
Name the shrimp species and life stage. Compare pond, biofloc and RAS proposals against measured site water and a separately documented feed-load basis.
Pond design
Separate surveyed geometry from stocking and aeration design. Include intake, drainage, soil, lining, power and discharge evidence before quoting.
Commercial RAS
Compare the same species, peak biomass, feed, hydraulic duty and treatment boundary. Recirculation flow does not establish make-up water demand.
Category pages describe equipment types, not named suppliers or available inventory. Model inputs and outputs are not verified site performance; use dated scope-matched quotes and qualified design review.
1. Equipment by species, system and scale
Which production system fits my species, site and target tonnes?
- Production system: RAS, flow-through, pond, biofloc or sea cage — set by water availability, site exposure, climate and market.
- Water treatment: mechanical filtration, biofilter sized to feed load, CO₂ stripping, UV/ozone disinfection.
- Oxygenation: aeration vs pure oxygen (on-site generation or liquid oxygen) and backup supply.
- Feeding and monitoring: feeders, sensors (O₂, temperature, pH, ammonia), alarms and data access.
- Biosecurity: quarantine, separated units, disinfection points, mortality handling.
Go deeper: RAS vs pond vs sea-cage comparison · Aquaculture equipment guide · RAS system design · On-site vs liquid oxygen · Water treatment projects · Offshore sea-cage farms · Oyster aquaculture equipment
2. Feed by species and growth stage
Which feed, at which stage, at what landed cost per kg of fish?
- Species and stage: starter, grower and finisher diets differ in pellet size, protein and fat.
- Feed conversion (FCR): the biggest OPEX driver — compare quotes on cost per kg of fish produced, not price per tonne of feed.
- Ingredients: protein sources, fishmeal/fish-oil share and certification requirements of your buyers.
- Landed cost: ex-works price + freight + duties + storage losses, delivered to your farm.
- Feeding system fit: pellet size and sinking/floating behaviour must match feeders and tanks or cages.
Go deeper: Feed guide by species · Feeding rates and prices · Feed cost optimizer · Feeding systems RFQ · Biofloc sizing, feed and FCR
3. Hatchery and farm planning, CAPEX/OPEX and financing
What will it cost to build and run, and can it be financed?
- Hatchery vs bought-in juveniles: supply security against extra CAPEX and skills.
- CAPEX: buildings, tanks or cages, water treatment, oxygen, power backup, installation and commissioning.
- OPEX: feed, juveniles, energy, oxygen, labour, mortality and maintenance.
- Energy and water: pumping head, heating/cooling, make-up water and discharge permits.
- Financing: lenders look for a costed scope, conservative production assumptions and a responsible contractor per package.
Go deeper: Project CAPEX guide · OPEX guide · Hatchery equipment · Project financing · Calculator assumptions and methods
Three ways buyers source a project — compared
Company descriptions below summarise each company's own public website; they are not endorsements and we have no affiliation with them.
Technology or system manufacturer
Some companies supply technology and services for sea-based and land-based aquaculture, including cage farming equipment and land-based recirculation systems, as one package around their own products.
Fits: Buyers who already chose one supplier's technology and want it delivered as a package.
Check: Scope of feed, juveniles, civil works and permits that sit outside the supplier's package.
Fish and shrimp feed company
Aquafeed producers offer species-specific feeds for fish and shrimp, often with technical feeding support for their own feed programmes.
Fits: Operating farms choosing a feed programme for a known species and system.
Check: Feed is one input; it does not cover the tanks, water treatment or construction the feed will be used in.
Independent managed RFQ (FishMatch)
You submit one project request; our team reviews and normalizes it, contacts suitable suppliers for you and presents comparable responses through FishMatch.
Fits: New or expanding projects from USD 250,000 that need equipment, feed and design compared together.
Check: We do not manufacture equipment or feed, and we do not guarantee prices, yields or supplier response times.
Source: /rfq-process
More on this choice: EPC vs independent procurement · turnkey projects.
Calculator assumptions you should check
Our calculators show estimates from the inputs you enter. Replace these with your own data before relying on any result:
| Input | What to know |
|---|---|
| Feed price | Entered per tonne delivered. Use your landed cost, not a list price. |
| FCR | Default values are planning inputs; real FCR depends on species, stage, temperature, feed and management. |
| Mortality / survival | Calculators apply a fixed survival rate across the cycle; set it from your own or your hatchery's records. |
| Growth | Harvest weight and cycle length are inputs, not predictions. No calculator guarantees yield. |
| Energy | Power use and tariff are inputs; pumping head and heating are the main swing factors. |
| Water | Make-up water rate depends on the system (RAS vs flow-through) and must match your permit. |
| Financing | Interest rates are indicative ranges; the lender's term sheet decides the real cost. |
Full formulas and sources: calculator methodology · all calculators.
One RFQ for the full project
Include these in a single request so equipment, feed and design responses match each other:
- Species, target tonnes per year, harvest size and market
- Site: location, water source and quality data, power, climate, land or sea area
- Production system preference (or ask us to compare options)
- Equipment packages: water treatment, oxygen, feeding, monitoring, biosecurity
- Feed needs by growth stage and expected annual volume
- Hatchery or juvenile supply plan
- Budget range (from USD 250,000), timeline and financing status
- Who you need for installation, commissioning, training and after-sales
Use the RFQ checklist and read how we review responses.
CAPEX, yield, energy and water: short answers and checklists
Reviewed 13 October 2026. Planning estimates only, not guarantees.
How do I estimate CAPEX for a commercial fish or shrimp farm?
Build it bottom-up from your design, not from a single per-tonne figure. CAPEX is the sum of site works, buildings or ponds/cages, production equipment, water treatment, power and backup, installation, freight, duties and contingency. Published per-tonne ranges vary widely by species, system, country and scope, so treat any range as a screening check and replace it with priced quotes for the same scope.
Checklist
- Fix target output (tonnes/year), species, harvest size and system type before pricing.
- List what is in and out of scope: civil works, building shell, electrical, commissioning, training.
- Add landed costs: freight, import duties, local taxes and installation labour.
- Hold a separate contingency line instead of hiding it in unit prices.
- Compare quotes only on the same scope and the same output assumption.
Assumptions
- No built-in price per tonne is used here; calculator CAPEX figures are indicative and must be replaced with quotes.
- Projects must be at least USD 250,000 in scope to be reviewed by FishMatch.
Sources: FishMatch calculator methodology
How do I estimate realistic harvest yield?
Harvest = number stocked × survival to harvest × average harvest weight. Use survival, growth time and harvest weight that match your species, system and site temperature, and test a lower-survival case. Yield is never guaranteed: disease, water quality, feed and management change the result.
Checklist
- Use species references (growth, temperature range) as a starting point, then local farm data.
- Run at least two survival cases, for example a base case and a lower case.
- Check that annual feed equals output × FCR you can realistically achieve.
- Confirm stocking density is within the supplier's design limits for the system.
Assumptions
- Survival, growth time and harvest weight are buyer inputs; no default is presented as a promised outcome.
Sources: FAO Cultured Aquatic Species fact sheets · FAO SOFIA 2024 — aquaculture production
How do I estimate energy use for RAS and intensive systems?
Start from feed: fish respiration needs about 0.25 kg oxygen per kg of feed, and nitrification needs about 4.18 g oxygen per g of ammonia-nitrogen removed. Oxygen supply, pumping (flow × head), aeration, temperature control and backup power then set kWh. Multiply by your local tariff and test a higher-tariff case.
Checklist
- Calculate daily feed at peak biomass, then oxygen demand from it.
- Ask suppliers for pump flow, total head and motor efficiency, not only kW rating.
- Include heating/chilling and building ventilation where relevant.
- Size backup power for oxygen and critical pumps, and state the switch-over time.
- Model your real tariff and a higher-tariff scenario.
Assumptions
- 0.25 kg O2/kg feed and 4.18 g O2/g TAN are planning coefficients; actual demand depends on species, temperature and feed.
- Electricity price is a buyer input.
Sources: Timmons & Ebeling, Recirculating Aquaculture Systems (NRAC 01-002) · Ebeling et al. 2006, Aquaculture 257
How do I estimate water quality loads and water needs?
Ammonia load follows feed: TAN ≈ feed × protein fraction × 0.092. Nitrifying that ammonia consumes about 7.05 g alkalinity (as CaCO3) per g TAN, and CO2 rises with oxygen use. These loads size the biofilter, degassing and alkalinity dosing; daily make-up water depends on the system's water reuse level and must come from the supplier's design.
Checklist
- Test source water (temperature, salinity, hardness, pathogens) before choosing a system.
- Size the biofilter from peak feed and feed protein, not from tank volume alone.
- Ask for the design make-up water rate and discharge treatment plan.
- Check local water abstraction and discharge permits early.
Assumptions
- 0.092 and 7.05 are published planning coefficients; feed protein and peak feed are buyer inputs.
Sources: Ebeling et al. 2006, Aquaculture 257 · Timmons & Ebeling (NRAC 01-002)
Questions
Should I choose equipment or feed first?
Neither on its own. The species and production system set the equipment, and the equipment (feeders, tanks or cages, temperature) affects which feed works. Plan them together and send one combined request.
Is RAS better than sea cages?
Not in general. RAS gives control over water and location but costs more to build and uses more energy; sea cages need suitable sheltered or offshore sites and permits. The right answer depends on species, site and market.
How should I compare feed quotes?
On cost per kg of fish produced: landed feed price multiplied by the FCR you can realistically achieve, plus the effect on survival and growth time.
Does FishMatch connect me directly with suppliers?
No. You submit your project to FishMatch; our team reviews it, contacts suitable suppliers for you and presents the responses through FishMatch.
Is there a minimum project size?
Yes. We review procurement requests for projects from USD 250,000. Smaller projects can still use the free calculators and guides.
Send your project for review
For projects from USD 250,000. Our team reviews your request, contacts suitable suppliers for you and presents comparable responses through FishMatch.
Start a project request