Equipment· Jun 2026·10 min read

Aquaculture equipment checklist: fish farm vs shrimp, item by item

Flat lay of essential fish and shrimp farm equipment items
Free RAS feasibility calculatorCheck CAPEX, payback and return for your project before you request quotes.Open the calculator

Setting up an aquaculture operation — whether you are growing tilapia, salmon, sea bass or shrimp — comes down to specifying the right equipment for each subsystem. Get this list wrong and you will pay for it for the next 10 years in FCR, mortality, oxygen bills and labour.

This checklist covers the equipment categories every modern fish farm, RAS facility or shrimp pond needs, with notes on what changes between finfish and shrimp systems. FishMatch Group sources every category below from project-matched manufacturers worldwide — use this as your scoping document before you request quotes.

1. Tanks, ponds and civil works

RAS: circular fibreglass or concrete tanks with dual-drain bottoms sized for target biomass density (typically 40–80 kg/m³). Shrimp: lined or earthen ponds 0.3–1.0 ha, with dedicated nursery raceways. Cages: HDPE circular pens for marine finfish, sized to current and depth.

2. Aeration and oxygenation

Shrimp ponds: paddlewheel aerators (2 HP per 400–600 kg of biomass) plus bottom diffusers. RAS: low-head oxygenators, oxygen cones or U-tubes fed by on-site PSA/VPSA oxygen generation. Never undersize — dissolved oxygen is the single biggest driver of survival and growth.

3. Water treatment and filtration

RAS non-negotiables: mechanical drum filter (60 µm), moving-bed biofilter sized to ammonia load, CO₂ degasser, UV or ozone disinfection, and a protein skimmer for marine systems. Match TAN removal capacity to peak feed load, not average.

4. Feeding systems

Finfish: automatic belt or pendulum feeders, or centralised air-blown feeding with per-cage doser (Akvasmart-style). Shrimp: acoustic (sound-triggered) auto-feeders significantly improve FCR versus broadcast feeding — a proven 10–15% feed saving.

5. Water quality monitoring

Continuous DO, temperature, pH, salinity and ORP probes tied to a SCADA with SMS/alarm dialler. Add TAN, nitrite and nitrate lab kits for weekly checks. For RAS, alkalinity monitoring is non-negotiable.

6. Temperature control

RAS: heat pumps or heat exchangers with plate-and-frame recovery on the discharge water. Tropical shrimp: greenhouse cover for winter operation in subtropical regions. Salmon smolt/post-smolt RAS: chillers sized for summer intake temperature.

7. Biosecurity and disinfection

Perimeter fencing, vehicle wheel dips, dedicated boots per zone, footbath at every doorway, UV or ozone barrier on incoming water, and a documented pond/tank sanitation protocol between cycles. In shrimp, the difference between EMS/AHPND outbreaks and clean cycles is biosecurity discipline.

8. Grading, harvest and post-harvest

Fish graders (bar or roller), fish pumps with counters, ice slurry harvest tanks, slaughter/stunning line for finfish. Shrimp: harvest pumps, chill kill tanks, size graders and IQF tunnels for processing.

9. Backup power and monitoring

Generator sized to run all aeration, oxygenation and pumping under full load, with automatic transfer switch, plus alarm dialler tied to DO, temperature, water level and power sensors. This is non-negotiable — a 4-hour power cut without aeration wipes an entire crop.

10. Nursery and hatchery kit (optional)

PL nursery raceways with biofloc, live-feed enrichment tanks (Artemia, rotifer), broodstock maturation tanks, algae culture units and larval rearing tanks with air-lift circulation.

What to do next

Send this checklist — with your species, target tonnage, country and system type — to the FishMatch Group sourcing team. A person replies within one business day and then requests project-matched supplier quotes for every line item, with no buyer fees; quotation timing depends on supplier response.

Key figures

Figures quoted in this guide. Indicative planning numbers — supplier quotes confirm final values.
FigureValueContext
Time / lead time10 yearsGet this list wrong and you will pay for it for the next 10 years in FCR, mortality, oxygen bills and labour.
Size / capacity40–80 kgRAS: circular fibreglass or concrete tanks with dual-drain bottoms sized for target biomass density (typically 40–80 kg/m³).
Size / capacity0 ha0 ha, with dedicated nursery raceways.
Size / capacity400–600 kgShrimp ponds: paddlewheel aerators (2 HP per 400–600 kg of biomass) plus bottom diffusers.
Performance10–15%Shrimp: acoustic (sound-triggered) auto-feeders significantly improve FCR versus broadcast feeding — a proven 10–15% feed saving.

Related articles

Where this fits in a real project

Every FishMatch project runs through the same five reviewed stages, from a first enquiry to comparable quotations. See the full buyer journey.

Planning a commercial aquaculture project?

Send your project brief. A FishMatch specialist reviews it before relevant suppliers are contacted privately.

Request a quote

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.

FishMatch Group email updates

Get the buyer intelligence briefing

Practical aquaculture intelligence for sourcing and project decisions: new buyer guides, dated official-source updates and free tools, for the topics you choose.

What you will receive

  • A short digest of newly published FishMatch Group articles and center updates for your topics
  • A summary, publication date and link to the full article for every item
  • No advertising, supplier promotions or sales calls; subscribing never creates a sourcing request

We first email you a confirmation link. Your subscription starts only after you confirm.

Digest sending is still being set up. Confirmed subscribers receive the first digest when it starts; nothing else is sent.

Topics
How often

Read our Privacy Policy. Subscribing is separate from any procurement request.