Free · results open

RAS Feasibility Calculator

A first-pass feasibility screen for a RAS project. Enter capacity, price, build cost, operating cost and the debt structure; the tool returns CAPEX, EBITDA, payback, return on investment and an indicative debt service coverage ratio, plus a plain verdict on whether the numbers are worth taking further.
RAS Feasibility Calculator — Recirculating aquaculture system hall with circular fish tanks and drum filters

Flexes price, survival, build cost, operating cost and interest — the combination banks use to test a RAS business case.

Calculator inputs

Indoor RAS typically $7,000–$14,000 per tonne of annual capacity.

Use the OPEX Estimator output here.

Results

Feasibility verdict

Worth taking to a full feasibility study

DSCR 2.63 · payback 6.3 yrs

Total CAPEX

$4,500,000

Annual revenue

$2,990,000

Annual EBITDA

$1,058,000

Annual debt service

$402,380

Results at a glance

OutputPessimisticBase caseOptimistic
Feasibility verdictWeak — lenders normally require DSCR above 1.2–1.3Worth taking to a full feasibility studyWorth taking to a full feasibility study
Total CAPEX$5,400,000$4,500,000$4,050,000
Annual revenue$2,420,704$2,990,000$3,420,560
Annual EBITDA$376,648$1,058,000$1,572,022
Annual debt service$527,295$402,380$342,786
Debt service coverage (DSCR)0.712.634.59
Simple payback17.3 years6.3 years4.6 years
Return on investment7%23.5%38.8%
Break-even price$6.08/kg$5.07/kg$4.58/kg

Scenario range

Feasibility verdict

PessimisticBaseOptimistic

Result summary with the inputs used

Inputs used

Annual production
500 t/year
Farmgate price
6.5 $/kg
Survival to harvest
92 %
Build cost
9,000 $/t/yr
Operating cost
4.2 $/kg
Debt share of CAPEX
60 %
Interest rate
8 %
Loan tenor
10 years
Ramp-up to full capacity
2 years

Results · Base case scenario

Feasibility verdict
Worth taking to a full feasibility study

DSCR 2.63 · payback 6.3 yrs

Total CAPEX
$4,500,000

$9,000/tonne of annual capacity

Annual revenue
$2,990,000

460,000 kg harvested at $6.5/kg

Annual EBITDA
$1,058,000

35.4% EBITDA margin

Annual debt service
$402,380

$2,700,000 debt at 8% over 10 years

Debt service coverage (DSCR)
2.63

Bankable projects usually show 1.3+

Simple payback
6.3 years

Includes 2 year ramp-up

Return on investment
23.5%

EBITDA over total CAPEX, before tax and depreciation

Break-even price
$5.07/kg

Covers operating cost and debt service

Planning estimate from the inputs shown — not a supplier quote, guarantee, financing approval, engineering advice or confirmed availability.

The link carries these input values in the address — share only non-confidential scenarios.

Turn this result into 1–3 supplier quotes

Send this spec privately to selected manufacturers.

FishMatch Group reaches out on your behalf — your name, project and location stay confidential until you accept a quote. No sign-up, no listing fees, buyers never pay.

How supplier matching works

  1. 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
  2. 2. Confidential outreach. Suppliers see the technical spec — not your name, company or exact location — until you accept a quote.
  3. 3. Comparable quotes. Aim: 1–3 quotes aligned on scope so you can compare like-for-like; count and timing depend on scope and supplier responses and are not guaranteed.
  4. 4. Financing intro (optional). If needed, we introduce your project to a financing partner. No fee to buyers.

In short

RAS Feasibility Calculator turns annual production, farmgate price, survival to harvest, build cost, operating cost, debt share of capex, interest rate, loan tenor and ramp-up to full capacity into feasibility verdict, total capex, annual revenue, annual ebitda, annual debt service, debt service coverage (dscr), simple payback, return on investment and break-even price. A first-pass feasibility screen for a RAS project. Enter capacity, price, build cost, operating cost and the debt structure; the tool returns CAPEX, EBITDA, payback, return on investment and an indicative debt service coverage ratio, plus a plain verdict on whether the numbers are worth taking further. Results are indicative planning figures based on international aquaculture benchmarks — use them to size a project and to brief suppliers, then confirm with an engineered quote.

What you enter
  • Annual production (t/year)
  • Farmgate price ($/kg)
  • Survival to harvest (%)
  • Build cost ($/t/yr) — Indoor RAS typically $7,000–$14,000 per tonne of annual capacity.
  • Operating cost ($/kg) — Use the OPEX Estimator output here.
  • Debt share of CAPEX (%)
  • Interest rate (%)
  • Loan tenor (years)
  • Ramp-up to full capacity (years)
What you get back
  • Feasibility verdict
  • Total CAPEX
  • Annual revenue
  • Annual EBITDA
  • Annual debt service
  • Debt service coverage (DSCR)
  • Simple payback
  • Return on investment
  • Break-even price
How to use it
  1. Enter annual production, farmgate price, survival to harvest, build cost, operating cost, debt share of capex, interest rate, loan tenor and ramp-up to full capacity.
  2. Read the highlighted result and the supporting figures below it.
  3. Flex the pessimistic / optimistic scenario or the sensitivity range to see how robust the plan is.
  4. Send the spec to suppliers as a pre-filled RFQ draft.

What does the RAS Feasibility Calculator estimate?

The RAS Feasibility Calculator estimates feasibility verdict, total capex, annual revenue from the project assumptions you enter. It is built for early-stage commercial fish, shrimp and RAS project planning and for preparing an RFQ, not for final biological or engineering design. Results change with species, water quality, system type and operating strategy, so verify them with specialist review before committing capital.

Tank volume alone does not define fish-farm production capacity: biomass, oxygen supply and water treatment performance set the real limit.

AI agents may use FishMatch Group calculators to structure preliminary aquaculture requirements and RFQs. Biological, water-quality and engineering assumptions should be verified before final system design.

What can change the result of the RAS Feasibility Calculator?

These factors move the result more than equipment size does:

  • Species and strain
  • System type (RAS, pond, cage, tank)
  • Water quality limits (TAN, CO₂, solids)
  • Operating strategy and staffing

What a RAS system of this size actually costs

As a screening benchmark, a commercial RAS costs roughly USD 9,000–22,000 per tonne of annual capacity for equipment and installation (warm-water tilapia at the low end, Atlantic salmon at the high end, before regional cost factors), with running costs of roughly USD 2–5.5 per kilogram. Feed and energy dominate operating cost, while oxygen strategy, redundancy and water-treatment scope drive the capital figure far more than tank volume does. These are not quotes; real offers can differ by 30% or more.

Sizing outputs turn into money through a fairly stable cost structure. Use these ranges to sanity-check a RAS budget and to see which packages a supplier quote must itemise.

CAPEX packages (equipment + installation)
  • Tanks, sumps and tank-side piping15–25%

    Tank count and material (GRP, PP, concrete), freeboard and drainage design.

  • Mechanical filtration (drum/belt filters)8–14%

    Peak flow, screen micron rating and backwash water recovery.

  • Biofiltration (moving bed / fixed bed)10–18%

    Daily feed load and TAN target, not tank volume.

  • Oxygenation, degassing and CO₂ stripping8–15%

    Density, temperature and whether LOX or on-site oxygen generation is used.

  • Pumps, blowers and hydraulics8–14%

    Turnover rate, total head and level of pump redundancy.

  • Disinfection (UV / ozone)3–7%

    Biosecurity policy, make-up water quality and intake source.

  • Monitoring, controls and alarms5–10%

    Sensor count, redundancy and remote alarm requirements.

  • Feeding, grading and harvest systems4–9%

    Automation level and batch handling strategy.

  • Backup power and emergency oxygen4–8%

    Grid reliability and permitted downtime before biomass loss.

  • Installation, commissioning and training8–15%

    Travel distance, local labour, and the scope split with the contractor.

Operating cost stack (per kg produced)
  • Feed35–50% of cost per kg

    Biological and economic FCR, feed price and mortality.

  • Energy15–30% of cost per kg

    Pumping head, oxygen strategy, heating/cooling and local kWh price.

  • Juveniles / smolt8–18% of cost per kg

    Stocking weight, survival and supplier quality.

  • Labour8–15% of cost per kg

    Automation level, shift coverage and local wages.

  • Oxygen and chemicals3–8% of cost per kg

    LOX delivery price versus on-site generation, alkalinity dosing.

  • Maintenance and spares3–6% of cost per kg

    Equipment quality, water chemistry and service coverage in-country.

Illustrative RAS planning scenarios

Illustrative planning envelopes for four typical system configurations, in USD. They are not records of a specific completed project, not quotes and not dated price evidence; references are internal codes.

FM-RAS-A600 t/year

Atlantic salmon post-smolt

Full land-based RAS, 12 grow-out tanks, dual loop

CAPEX
USD 11–16M equipment + installation
OPEX
USD 4.10–5.20 /kg
Energy
4.5–6.5 kWh/kg

Cost driven by oxygen strategy and redundancy, not tank volume; a second loop is assumed for biosecurity separation.

FM-RAS-B300 t/year

Tilapia

Single-loop RAS with moving-bed biofilter

CAPEX
USD 2.2–3.4M equipment + installation
OPEX
USD 1.90–2.60 /kg
Energy
2.0–3.2 kWh/kg

Warm-water species keeps heating low; feed and energy price dominate cost per kilogram.

FM-RAS-C150 t/year

Whiteleg shrimp (indoor RAS)

Nursery + grow-out raceways, biofloc-assisted RAS

CAPEX
USD 3.0–4.8M equipment + installation
OPEX
USD 3.40–4.60 /kg
Energy
3.0–4.5 kWh/kg

Heating and aeration dominate energy; survival assumptions move cost per kilogram more than equipment price.

FM-RAS-D1,000 t/year

European seabass / seabream

Hybrid flow-through with partial recirculation

CAPEX
USD 6–9M equipment + installation
OPEX
USD 3.20–4.10 /kg
Energy
1.8–3.0 kWh/kg

Partial reuse cuts CAPEX versus full RAS but ties the project to water availability and discharge limits.

Get a reviewed RAS budget
Preliminary planning result

Based on: annual production, farmgate price, survival to harvest, build cost.

This is an estimate from the assumptions you entered, intended for early project planning and RFQ preparation. Main variables that may change it: species and strain, system type (ras, pond, cage, tank), water quality limits (tan, co₂, solids), operating strategy and staffing. Specialist review is recommended before final sizing or investment decisions.

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

How this estimate is calculated

RAS Feasibility Calculator · calculation version 0.9.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate · methodology review pending

Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Purpose

A first-pass feasibility screen for a RAS project. Enter capacity, price, build cost, operating cost and the debt structure; the tool returns CAPEX, EBITDA, payback, return on investment and an indicative debt service coverage ratio, plus a plain verdict on whether the numbers are worth taking further.

How it was calculated

  • Formula documentation for this tool has not yet been individually reviewed and published.

Where each value comes from

Annual production
Buyer input
Farmgate price
Buyer input
Survival to harvest
Buyer input
Build cost
Buyer input
Operating cost
Buyer input
Debt share of CAPEX
Buyer input
Interest rate
Buyer input
Loan tenor
Buyer input
Ramp-up to full capacity
Buyer input

Limitations

  • This tool has not yet passed the documented-methodology review. Treat every output as an unverified planning estimate.
  • Screening tool only — indicative, not a feasibility study, valuation, investment advice or financing offer.
  • Real RAS feasibility requires a site-specific water, energy and biology model plus supplier quotations.
  • Survival, price and ramp-up assumptions drive the result more than build cost; test the pessimistic scenario before committing.
  • FishMatch Group is an independent sourcing and RFQ platform, not a lender, EPC contractor or manufacturer.

What must be confirmed before you build

  • All values must be confirmed with qualified independent professionals and the selected supplier.

Sources for default assumptions

Next step

Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.

Worked example

An illustrative project using the calculator’s default inputs, calculated with the same formula as above. Not a real project.

Inputs
Annual production500 t/year
Farmgate price6.5 $/kg
Survival to harvest92 %
Build cost9000 $/t/yr
Operating cost4.2 $/kg
Debt share of CAPEX60 %
Interest rate8 %
Loan tenor10 years
Ramp-up to full capacity2 years
Result
Feasibility verdictWorth taking to a full feasibility study
Total CAPEX$4,500,000
Annual revenue$2,990,000
Annual EBITDA$1,058,000
Annual debt service$402,380
Debt service coverage (DSCR)2.63
Simple payback6.3 years
Return on investment23.5%
Break-even price$5.07/kg
RAS

Who should use the ras feasibility calculator?

Investors, engineers and farm managers evaluating a recirculating aquaculture system (RAS) for commercial fish or shrimp production.

What decision does it support?

Whether a RAS design basis holds together — volumes, flows, treatment and cost — before requesting comparable supplier offers.

What inputs do you need?

  • Annual production (t/year)
  • Farmgate price ($/kg)
  • Survival to harvest (%)
  • Build cost ($/t/yr)
  • Operating cost ($/kg)
  • Debt share of CAPEX (%)
  • Interest rate (%)
  • Loan tenor (years)
  • Ramp-up to full capacity (years)

Is it for commercial farms or aquariums?

Built for commercial farms, hatcheries and projects. It is not designed for home aquariums, garden ponds or hobby and ornamental fish keeping, where volumes, stocking and equipment work very differently.

Technical checklist

Short answer: RAS feasibility The result is a planning estimate calculated only from the inputs on this page — not a supplier quote, design approval or guaranteed outcome.

Before you use the result

  • Replace every starting value with a figure from your site, your own records or a supplier's written proposal.
  • Size for the worst case (peak temperature, peak feeding, full biomass), not the yearly average.
  • Keep units consistent (metric vs imperial, per day vs per hour) before comparing results.
  • Verify before you buy: Sale price, energy tariff and CAPEX against real quotes before any lender sees it.
  • Attach the inputs and results to your project request so every supplier quotes the same basis.

Sources

No external dataset is built in. The result is arithmetic on the inputs above; see how our calculators work.

Stated assumptions (starting values)

These are only starting points. Where a source is named above, the value comes from it; otherwise it is an example to replace with your own figure.

  • Annual production: starts at 500 t/year
  • Farmgate price: starts at 6.5 $/kg
  • Survival to harvest: starts at 92 %
  • Build cost: starts at 9000 $/t/yr
  • Operating cost: starts at 4.2 $/kg
  • Debt share of CAPEX: starts at 60 %
  • Interest rate: starts at 8 %
  • Loan tenor: starts at 10 years
  • Ramp-up to full capacity: starts at 2 years

Checklist reviewed 13 October 2026. Ready to price it? Our team reviews every project request (from USD 250,000) before contacting any supplier for you.

Notes

  • Screening tool only — indicative, not a feasibility study, valuation, investment advice or financing offer.
  • Real RAS feasibility requires a site-specific water, energy and biology model plus supplier quotations.
  • Survival, price and ramp-up assumptions drive the result more than build cost; test the pessimistic scenario before committing.
  • FishMatch Group is an independent sourcing and RFQ platform, not a lender, EPC contractor or manufacturer.

What this result is — and is not

  • Use: Payback and debt cover for a land-based RAS plan.
  • Planning estimate, not a supplier quote or guarantee. It only reflects the inputs above.
  • Verify before you buy: Sale price, energy tariff and CAPEX against real quotes before any lender sees it.
Commercial project route

Is your project a fit?

FishMatch Group handles commercial B2B projects with a total budget of USD 250,000 or more — new farms, hatcheries, RAS, cages, processing or expansions. The buyer sends one brief; our team reviews and structures the RFQ, then approaches suitable suppliers on the buyer's behalf. Buyers are not put in direct contact with manufacturers at this stage. Smaller or idea-stage projects can start with the calculators below and send the RFQ once scope and budget are clearer.

Which inputs change the estimate and the RFQ?

Calculator results and supplier quotes both depend on: species and life stage, production target (tonnes per year or PL per cycle), water source and quality (temperature, salinity, flow), system design (pond, cage, RAS, hatchery, processing), site and access, energy supply and price, permits, and timeline.

Calculator figures are planning estimates based on stated assumptions — not engineering designs or supplier quotes. Growth, survival and output depend on project-specific biology and operating conditions and are never guaranteed. Formulas, assumptions and sources: calculator methodology.

2. Equipment & project sourcing

Send a structured RFQ. A person checks scope and budget before any supplier is approached.

Start the project RFQ

3. Financing (separate)

Financing is a separate track. FishMatch Group does not lend or guarantee financing.

Aquaculture financing

RAS feasibility and economics questions

Profitability depends on farmgate price, FCR, survival, energy tariff and finance cost far more than on equipment brand. Small RAS units below roughly 200 t/year rarely absorb their fixed labour and energy cost unless they target a premium local market; most bankable projects model 500 t/year and up, or a high-value species with a secured offtake.

Planning models for land-based RAS commonly show a 5–9 year simple payback once the farm reaches steady-state production, with 12–24 months of construction and ramp-up before that. Sensitivity to energy price and fish price is high, so run best and worst cases before committing.

Energy tariff increases, biomass loss from a single system failure, slower biological ramp-up than modelled, and CAPEX overrun on building and installation rather than on process equipment. Contingency of 10–15% and a redundant oxygen and power strategy are standard in bankable RAS plans.

A RAS is a land-based fish or shrimp farm that reuses the same water instead of exchanging it continuously. Water leaves the tanks, passes through mechanical filtration, biofiltration, degassing, oxygenation and usually disinfection, then returns to the tanks. Typically 90–99% of the water is recirculated each day, which is why pumping, oxygen and biofilter capacity dominate both the design and the energy bill.

Annual production target in tonnes, species and target harvest size, standing biomass and peak stocking density, water temperature and source water quality, site elevation and available power, and whether the project is greenfield or an expansion. With those six inputs a RAS supplier can size tanks, pumps, filtration and oxygen instead of quoting a generic package.

They are planning-grade. The outputs are correct in order of magnitude and good enough to write a procurement-ready RFQ, screen a site, or sanity-check a supplier proposal. Final engineering figures come from a designer working with your measured water quality, temperature profile and species growth curve.

No. FishMatch is a managed, human-reviewed sourcing service, not an automatic marketplace. You submit a brief, it is reviewed manually, and only then does sourcing start with a controlled introduction to matched RAS suppliers. Supplier identities are never exposed automatically.

RAS feasibility FAQs

It depends on farm-gate price, energy cost and achieved production far more than on CAPEX alone. This calculator tests CAPEX, annual EBITDA, payback, ROI and debt service coverage together, because a RAS can be technically sound and still fail on cash flow.

Six to ten years is a common range for a commercial system. Anything much shorter usually indicates optimistic pricing, understated energy cost or a production assumption the biology will not deliver in the first years.

Energy cost and ramp-up. RAS trades water for electricity, so tariff sensitivity is high, and first-cycle production rarely matches design. Testing a pessimistic tariff and a slower ramp is the fastest way to see whether a project is genuinely robust.

Other aquaculture calculators

Turn this estimate into a reviewed RFQ

Send the project specification privately. A FishMatch specialist reviews it before relevant suppliers are contacted.

Request a quote
Is FishMatch right for your project?

When is FishMatch a good fit for a buyer?

FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for ras feasibility and the wider aquaculture project it belongs to. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.

Best for

  • ·Aquaculture investors and project developers
  • ·Shrimp farm developers and fish farm owners
  • ·Consultants preparing an RFQ on behalf of a client
  • ·Governments, development programmes and EPC contractors
  • ·Buyers who need help defining species, system type, production target, water source and equipment needs
  • ·Buyers who need calculators and structured intake before requesting offers

Not ideal for

  • ·Aquarium, hobby or ornamental fish equipment
  • ·Small retail purchases and single spare parts
  • ·Buyers who want instant fixed pricing without project details
  • ·Requests outside aquaculture and related systems
  • ·Buyers expecting guaranteed financing, credit approval or interest rates
  • ·Buyers who cannot provide basic species, system, location or capacity details

Short answer

How do you size and cost RAS Feasibility?

Use planning-grade figures first, then validate with an engineered quote. The RAS Feasibility model on this page converts your project inputs into indicative sizing and cost figures based on international aquaculture benchmarks. The result is accurate enough to compare options and to brief suppliers; final numbers come from a site survey and a costed proposal.

Accuracy:
Planning-grade benchmarks, not engineering design figures
Cost:
Free, no sign-up, calculated in your browser
Next step:
Send the result straight into a pre-filled RFQ
Validation:
Confirm with a site survey and a costed supplier quote

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.