How this estimate is calculated
Aquaculture CAPEX Estimator · calculation version 0.9.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate · methodology review pending
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Planning-level CAPEX for a commercial aquaculture project. Enter target annual production and system type; the tool applies indicative $/tonne build costs, then layers civil works, equipment, engineering and contingency to produce a total investment and a cost per tonne of installed capacity.
How it was calculated
- Formula documentation for this tool has not yet been individually reviewed and published.
Where each value comes from
- Target annual production
- Buyer input
- System type
- Buyer input
- Base build cost override (0 = benchmark)
- Buyer input
- Land, site & civil works
- Buyer input
- Engineering, permits & design
- Buyer input
- Contingency
- Buyer input
- Working capital cover
- Buyer input
- Expected operating cost
- Buyer input
Limitations
- This tool has not yet passed the documented-methodology review. Treat every output as an unverified planning estimate.
- Indicative planning figures only — not a quotation, valuation or engineering study.
- RAS costs vary widely by species, water temperature, degree of automation and local construction cost.
- Real budgets are only firm once supplier quotations and a site survey exist. Use the output to build an RFQ, not to sign an investment decision.
- FishMatch Group is an independent sourcing and RFQ platform; it is not an EPC contractor, manufacturer or lender.
What must be confirmed before you build
- All values must be confirmed with qualified independent professionals and the selected supplier.
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.