Farm operations

Fish feeding rates, feed prices and fingerling prices

How much to feed each day, how much feed a whole cycle needs, and what feed and juveniles cost when you plan a commercial fish or shrimp farm. Prices are the planning figures used in our farm planner, not supplier quotes. A person reviews every request. Supplier identities stay private.

Quick answer

How much feed does a fish or shrimp farm need, and what do feed and juveniles cost?

Young fish eat about 5–10% of their body weight a day; near harvest that drops to about 1–2% for fish and 2–3% for shrimp. Over a whole cycle, total feed is output times FCR: our farm planner uses FCR 1.6 for tilapia, 1.4 for vannamei shrimp, 1.2 for salmon and trout and 1.8 for sea bass and bream. Planner feed prices are about $0.60/kg for tilapia, $1.10 for shrimp, $1.40 for sea bass and $1.60 for salmon. Juveniles are about $0.08 per tilapia fingerling, $5 per 1,000 shrimp post-larvae, $0.25 per sea bass fry and $1.50 per salmon smolt.

Multiply the fish in the pond or tank by their average weight to get biomass, then multiply by the feeding rate for that size and water temperature. Example: 50,000 tilapia at 200 g is 10 t of fish; at 2.5% a day that is 250 kg of feed. Weigh a sample every 1–2 weeks and update the ration.

Multiply output by FCR. With the planner FCR of 1.6, 100 t of tilapia needs about 160 t of feed, about $96,000 at $0.60/kg. 100 t of vannamei at FCR 1.4 needs about 140 t of feed, about $154,000 at $1.10/kg.

Using planner prices, stocking 400,000 tilapia fingerlings costs about $32,000, and 1 million shrimp post-larvae about $5,000. Prices vary by country, size, genetics and health certification, so always ask for a quote with the health certificate and delivery included.

Fish oil supplies omega-3 fats (EPA and DHA) that marine fish and shrimp need to grow and stay healthy, and that consumers value in the fillet. It is one of the most expensive feed ingredients, so its share drives feed price; many feeds now replace part of it with plant or algae oils.

Yes. Send the species, monthly feed tonnage or number of juveniles, pellet or fry size and your country. A person reviews the request and replies within one business day. Supplier identities stay private, and buyers pay no fees.

Daily feeding rate by size (% of body weight per day)

StageFish (warm water)Shrimp
Fry / post-larvae8–10%10–15%
Fingerling / juvenile4–6%5–8%
Grow-out (mid cycle)2–3%3–4%
Near harvest1–2%2–3%

Lower the ration in cold water or when oxygen is low. Always follow the feed maker's table for your pellet.

Planning figures by species

SpeciesFCRFeed $/kgFeed per tonne outputJuvenile price
Tilapia1.6$0.601.6 t · $960$0.08 each
Shrimp (vannamei)1.4$1.101.4 t · $1,540$5 per 1,000
Salmon / trout1.2$1.601.2 t · $1,920$1.50 each
Sea bass / bream1.8$1.401.8 t · $2,520$0.25 each

What determines feed prices and fingerling prices

  • Protein level and fishmeal

    Feed price follows protein content. Shrimp and salmon feeds use more protein and fishmeal than tilapia feed, so they cost more per kg. Fishmeal and soybean meal prices move the whole market.

  • Pellet type and size

    Floating extruded pellets cost more than sinking pellets but waste less feed. Starter and fry feeds cost far more per kg than grower feeds, but are a small share of the total.

  • Import duty, freight and volume

    Imported feed adds freight and duty; local mills are usually cheaper per kg. Buying by the truckload or under a yearly contract lowers price.

  • Fingerling size and quality

    Larger juveniles cost more each but survive better and shorten the cycle. Sex-reversed tilapia, specific-pathogen-free (SPF) shrimp post-larvae and vaccinated smolts cost more, and usually pay back through survival.

  • Health certificate and transport

    Always compare prices including the health certificate, packing and transport to the farm. Long transport raises losses on arrival.

Request feed or fingerling quotes

Short answer

How do you prepare a reviewed RFQ for Fish Feeding Rates And Prices?

Submit a private request for Fish Feeding Rates And Prices with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.