Farm operations → procurement

Aquaculture farm management systems: requirements to set before you buy equipment

Farm management software, sensors and the equipment that feeds them data are bought together, whether you plan it or not. This page turns the operational needs of shrimp farms, fish farms, hatcheries and RAS into requirements you can put in a project brief and RFQ. FishMatch Group does not sell farm software: it helps commercial projects from USD 250,000 compare equipment and system quotes on the same scope.

Quick answer

What is an aquaculture farm management system?

An aquaculture farm management system is software, usually with mobile data entry and sensor connections, that keeps one production record for every tank, pond or cage: stocking, transfers, feeding, losses, growth samples, water quality, treatments and harvest, plus planning and cost reports. For a new farm the procurement question is not only which software to use, but whether the feeders, sensors, controls and power you buy can supply that data reliably.

No. FishMatch Group is a sourcing and RFQ service for commercial aquaculture projects from USD 250,000. It helps you write farm-management and monitoring requirements into the project brief so equipment and software quotes can be compared on the same scope. It does not sell, host or integrate farm software and has no partnership with any software vendor.

Per pond: post-larvae stocked and their source, daily feed (and feeding-tray checks where used), dissolved oxygen and temperature including night-time lows, aerator running hours, salinity, pH and alkalinity, sampled weight, mortality and health observations, and harvest weight. The hardware side follows from that list: oxygen probes per pond or on a rotation, aerator controls that log run time, and standby power for aeration and alarms.

Broodstock and spawning records, egg or larval counts per tank, survival at each stage, live-feed production, nursery transfers and the delivery plan to grow-out. Fix the number of tanks and batches with the hatchery planning and capacity calculators first; software then tracks the plan against what actually happens.

Typically dissolved oxygen, temperature and other water-quality sensors, feed delivered by automatic feeders, flow and energy meters in RAS, and alarm events. Ask every equipment supplier to state in writing which data their equipment outputs, in which format or protocol, and whether that has been tested with the software you plan to use. Do not assume an integration that is not documented.

Add priced lines for sensor count and placement, data loggers and export, alarm escalation by SMS or call, standby power for monitoring, site connectivity, a unit-naming plan shared by all suppliers, and training. Without these lines, two quotes for the same tanks or ponds are not comparable.

Only after your request has been reviewed and the FishMatch sourcing team approves an introduction. No supplier is contacted automatically, and supplier identities stay private until then.

What a farm management system records — and what that means for procurement

These areas reflect capabilities that commercial farm-management platforms document publicly (checked 31 October 2026). They show what operators need; FishMatch has no partnership with, and does not endorse, any software vendor.

  • Unit-level production record

    Operational need: Every stocking, transfer, split, grading and harvest is recorded against the tank, pond or cage it happened in, so biomass and counts stay right through the cycle.

    In the RFQ: Agree one unit-naming plan (tank, pond, cage IDs) with every equipment supplier before drawings are final.

  • Feeding plan vs feed delivered

    Operational need: A daily ration by species, weight band and phase, with what was actually fed confirmed by staff or by the feeder.

    In the RFQ: Ask feeder suppliers whether their controllers log dispensed feed per unit and how that log is exported.

  • Water quality bound to the unit

    Operational need: Oxygen, temperature and other readings tied to the batch in that unit, so a loss can be traced against the conditions before it.

    In the RFQ: Specify sensor count, placement, calibration routine and data logger per unit or per rotation — not just “monitoring system”.

  • Alarms that work without the office

    Operational need: Low oxygen, power or flow failures reach a person day and night.

    In the RFQ: Price alarm escalation (SMS/call), standby power for sensors and aeration, and a test method at handover.

  • Health, treatments and biosecurity

    Operational need: Mortality counts, observations, treatments and withdrawal periods recorded per batch.

    In the RFQ: Include quarantine, disinfection points and staff flow in the site layout the suppliers quote against.

  • Production planning and forecasting

    Operational need: Stocking and harvest plans from hatchery or nursery through grow-out, checked against capacity and budget.

    In the RFQ: Fix capacity with calculators first; the plan sets tank numbers, batches per year and delivery schedules in the RFQ.

  • Feed cost and conversion

    Operational need: Feed conversion reported per unit and as cost per kilogram gained, with inventory and costing linked.

    In the RFQ: Ask for energy, feed and labour assumptions in each quote so running costs can be compared, not only the equipment price.

  • Traceability and reporting

    Operational need: Batch history from egg or post-larva to harvest, exportable for buyers, lenders and regulators.

    In the RFQ: Require data export (for example spreadsheet or PDF) and written confirmation of who owns the farm data.

System requirements by farm type

Shrimp farm (ponds or lined ponds)

Records to keep: Post-larvae stocked per pond, daily feed and tray checks, night-time oxygen lows, salinity, pH and alkalinity, sampled weight, losses, harvest per pond.

Hardware that supplies the data: Oxygen probes per pond or on rotation, aerator controls with run logs, standby power, feeding equipment.

Fish farm (ponds or cages)

Records to keep: Stocking and grading per pond or cage, feed by unit, growth samples, mortalities, oxygen and temperature, net or pond maintenance, harvest.

Hardware that supplies the data: Feeders or feed barges with dispense logs, oxygen and temperature sensors, cameras or sampling gear where used.

RAS (recirculating) farm

Records to keep: Biomass and feed per tank, oxygen and CO₂, TAN and nitrite, flow and pump status, energy use, alarms, harvest.

Hardware that supplies the data: Online oxygen and temperature probes, flow and level sensors, energy metering, PLC or controls with alarm export, standby generation.

Production planning: from hatchery to grow-out

Production planning software tracks a plan; it does not create the capacity. Size the chain first, then buy the equipment and the system that records it.

  1. 1. Harvest target. Tonnes per year and harvest size set standing biomass — biomass calculator.
  2. 2. Growth and cycle length. Days from stocking to harvest set batches per year — fish growth calculator.
  3. 3. Grow-out volume. Density limits give tank, pond or cage volume — stocking density calculator.
  4. 4. Juvenile demand. Survival at each stage gives the hatchery and nursery output needed — hatchery planning calculator and hatchery capacity calculator.
  5. 5. Oxygen and water. Feed load sets oxygen demand and treatment — dissolved oxygen calculator, water quality systems and oxygen systems.

Growing an existing farm? Start from farm capacity and the expansion guide.

Buyer checklist: farm management software and monitoring

  • Data ownership and export: who owns the farm data, and in which formats it can be exported
  • Documented connection to each sensor, feeder or controller you buy — confirmed in writing, not assumed
  • Records per tank, pond or cage, including transfers, splits and grading
  • Mobile or offline data entry for sites with weak connectivity
  • Alarm escalation that still works if the internet or office PC is down
  • User roles for owners, managers, technicians and auditors
  • Languages, units and currency used on site
  • Where data is hosted and how personal data of staff is handled
  • Support hours, response times and training in the quote
  • Total cost as separate lines: licences, sensors, loggers, connectivity, installation and training

Monitoring hardware scope: monitoring and IoT systems. Software sourced as part of a project: aquaculture software sourcing.

Costs, financing and the quote request

Managed, human-reviewed sourcing starts at a total project budget of USD 250,000. A person reviews every request; no supplier is contacted or introduced until the FishMatch sourcing team approves it, and supplier identities stay private until then.

Send a project request

Short answer

How do you prepare a reviewed RFQ for Aquaculture Farm Management?

Submit a private request for Aquaculture Farm Management with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer