Be considered for reviewed commercial aquaculture projects
If you design or supply RAS, water treatment, oxygenation, engineering, feeding systems or farm technology, submit a private capability profile. When a buyer’s reviewed brief fits your capability, our team contacts you and coordinates your response. Projects start at USD 250,000; there is no public directory, no buyer hand-off and no guarantee of leads.
Who this is for
RAS integrators and system builders
Complete recirculating systems: tanks, mechanical and biological filtration, degassing, pumping, controls.
Water treatment and oxygenation suppliers
Intake treatment, UV, ozone, oxygen generation or LOX supply, cones and diffusers, aeration.
Engineering and design firms
Feasibility, process design, civil and MEP design, owner's engineering and tender support.
Feed-system vendors
Automatic feeders, feed barges, pneumatic distribution and feeding software. Aquafeed itself is handled by FeedMatch Group.
Farm technology companies
Sensors, monitoring, alarms, biomass estimation, farm-management and energy-management systems.
Not covered: aquarium, ornamental and hobby equipment; second-hand equipment sales; aquafeed (see FeedMatch Group); cold chain (see ColdMatch Group); poultry hatcheries (see HatchMatch Group).
What a useful capability profile contains
| Profile item | Why it matters for matching |
|---|---|
| Capability and scope boundaries | What you design, supply, install and commission — and what you exclude. |
| Species and system expertise | Species and systems you have delivered (e.g. RAS salmon post-smolt, shrimp ponds, oyster longlines), with scale. |
| Capacity range | Smallest and largest project you take on, in tonnes per year, flow (m³/h) or contract value. |
| Regions served | Where you can deliver, install and provide service, and where you rely on partners. |
| Technical documentation | Datasheets, typical P&IDs or process descriptions, performance test methods, certifications (e.g. CE, ISO 9001) — shared under confidentiality. |
| References | Completed projects that can be verified on request. They are never published. |
| Commercial terms | Typical lead times, warranty, spare parts and after-sales structure. |
How being considered works
- 1Submit a capability profile below. It is stored privately and is not published as a directory listing.
- 2Our team reviews it and may ask for documentation or a short technical call.
- 3When a buyer project matches your stated capability, region and capacity, our team contacts you with a structured brief.
- 4You respond through FishMatch. Our team normalises responses so the buyer compares like with like.
- 5The buyer decides next steps. There is no fee to be considered and no guarantee of projects or volume.
Your profile, documents and references stay private. Buyer identities and contact details are not shared with providers, and provider details are not shown to buyers. All communication runs through FishMatch.
What buyers will ask you to quote against: see the aquaculture project scoping guide. How buyer requests are reviewed: RFQ process. More on supplier qualification: for suppliers.
Project guides: what buyers need to define
Use these guides to understand the data behind a reviewed brief and the evidence buyers compare. Early scoping is welcome; managed procurement is for commercial projects from USD 250,000, with budget allowed to remain unknown during scoping.
RAS system design
One design basis, treatment packages and scope boundaries.
Indoor fish farming
Site suitability, building services and operating scenarios.
Oyster farm systems
Lease conditions, nursery, grow-out gear and handling.
Shrimp farm systems
Pond choices, water control, aeration and seed requirements.
Water treatment
Separate intake, recirculation and discharge treatment duties.
Oxygenation
Peak demand, transfer performance and independent backup.
Biosecurity
Risk pathways, zoning, stock movements and commissioning.
Feed planning
Species and stage, pellet compatibility, FCR and landed cost.
Energy planning
Load schedules, pumping duty, tariffs and outage scenarios.
Questions providers ask
Submit your capability profile
Reviewed privately by our team. Submitting does not create buyer contact or a commitment to quote.
Short answer
What is the fastest way to get quotes for Aquaculture Solution Providers?
Submit one structured request for Aquaculture Solution Providers. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer
What is the fastest way to get quotes for Aquaculture Solution Providers?
Submit one structured request for Aquaculture Solution Providers. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
How does FishMatch Group source suppliers for this requirement?
You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.
Do buyers see supplier names during the sourcing process?
No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.