Biofloc fish farm guide

Biofloc Fish Farm Planning: Tank Sizing, Feed Rates and FCR

How do you plan a biofloc fish farm?

Size it from the tonnage you want to sell. Divide each cycle's harvest by a stocking density your aeration can support to get culture volume, set daily feed as a percentage of the fish's body weight, and multiply annual output by a conservative FCR to get the feed you must buy. Those three numbers drive tanks, blowers, backup power and feed budget.

Quick sizing, feed and FCR calculator

Indicative planning figures only — not engineering design.

Peak biomass per cycle
50,000 kg
Culture volume needed
2,000 m³
Tanks of 94.2 m³
22
Peak daily feed
1,000 kg/day
Annual feed
160 t/yr

Illustrative inputs, not recommended densities or feeding rates. Assumes equal harvest cycles, simultaneous peak biomass and vertical circular tanks at working water depth. Excludes nursery, spare units, freeboard, downtime, mortality and solids-treatment volume; this arithmetic cannot verify aeration or engineering capacity.

How do I size biofloc tanks or lined ponds?

Culture volume = harvest biomass per cycle ÷ stocking density at harvest. Illustrative arithmetic, not a farm recommendation: 100 t/yr in 2 cycles is 50,000 kg per cycle; at 25 kg/m³ that needs about 2,000 m³ — roughly 22 circular tanks of 10 m diameter and 1.2 m water depth.

  • Start from the tonnage you can sell, not from the tanks you can afford.
  • Pick a stocking density your aeration, backup power and team can sustain; higher density raises oxygen demand and solids load.
  • Add nursery volume and at least one spare unit for transfers, cleaning and emergencies.
  • For lined ponds, measure actual water volume with the pond volume calculator rather than nominal area.
  • Keep unit size within what one person can harvest and drain in a working day.

How much should biofloc fish be fed per day?

Daily feed = standing biomass × feed rate (% of body weight). The rate falls as fish grow; the table below summarises published Nile tilapia biofloc feeding-rate trials. They are small-tank research results for one species, so your feed supplier's table, water temperature and observed appetite still decide the daily ration.

Fish sizeResult in biofloc trials (% body weight/day)Source
Nursery, 3–30 g (trial start 3.1 g, 70 days)6.1% best growth; 4.3% best economic returnOliveira et al. 2021
Juvenile, from 12 g (4 weeks)6% best growth; 4% and 8% not significantly different; FCR worsened as feed roseVilles et al. 2024
Mid grow-out (about 30–150 g)No biofloc trial found — use your feed supplier's table—
Fattening stage1.4% performed best vs a 2.0% controlElnady et al. 2023
  • Feed small meals often for fingerlings; reduce frequency as fish grow.
  • Cut feed when dissolved oxygen is low, temperature drops or fish stop feeding.
  • Uneaten feed is doubly costly in biofloc: it raises ammonia and floc load and therefore aeration demand.
  • Log feed per tank daily; it is the basis for FCR and for carbon dosing.

What is FCR and why does it decide biofloc profit?

Feed conversion ratio (FCR) is kilograms of feed used per kilogram of fish produced. Feed is usually the largest operating cost, so a farm at FCR 1.8 buys 12.5% more feed than one at 1.6 for the same harvest.

  • Plan with a conservative FCR for your species, feed and site; treat better figures as upside.
  • Biofloc can improve conversion because fish graze on the floc, but this is not guaranteed.
  • Annual feed (t) = annual production (t) × FCR — budget storage and cash for it.
  • Ask every supplier which FCR their design and business case assume.

Planning checklist before requesting quotes

  • Annual tonnage, species, harvest weight and cycles per year written down
  • Stocking density chosen and justified by aeration and team experience
  • Culture volume and number and size of tanks or lined ponds
  • Peak daily feed and annual feed tonnage at a conservative FCR
  • Aeration and backup power sized for peak biomass, with automatic changeover
  • Solids removal and a permitted sludge discharge route

Sources

  1. Oliveira L.K. et al. (2021). Growth, nutritional efficiency, and profitability of juvenile GIFT Nile tilapia reared in biofloc on graded feeding rates. Aquaculture 541: 736830
  2. Villes V.S. et al. (2024). Feeding rates affect growth, metabolism and oxidative status of Nile tilapia rearing in a biofloc system. Tropical Animal Health and Production
  3. Elnady M.A. et al. (2023). Growth and feed performances of the Nile tilapia during the fattening stage under restricted feeding in biofloc culture. Egyptian Journal of Aquatic Biology & Fisheries 27(3): 69–85

FAQ

What can six 6 m diameter biofloc tanks tell me about shrimp-farm cost?
Geometry only: total working volume = 6 × π × (6 ÷ 2)² × water depth. At an illustrative 1.2 m depth this is 203.6 m³, excluding freeboard and sumps. It is not shrimp production capacity or a cost estimate. Request dated local quotes for tanks, aeration, backup power, solids treatment, post-larvae, feed, installation and permits; keep working capital separate. Tilapia feeding trials below must not be applied to shrimp.
How big should biofloc tanks or ponds be?
Work backwards from production. Divide the peak standing biomass you need by a realistic stocking density verified for your species, water, aeration and operator experience to get the culture volume, then split it into units you can manage and harvest. The calculator on this page does the arithmetic.
How much feed does a biofloc fish farm use per day?
Daily feed is the standing biomass multiplied by a feed rate expressed as a percentage of body weight. In Nile tilapia biofloc trials, 3–30 g fish grew best at about 6% of body weight a day (4.3% was most profitable), while fattening-stage fish did best at 1.4% against a 2.0% control, so feed demand falls through the cycle. Use the supplier feeding table for your feed and temperature.
What FCR should I plan for in biofloc?
Feed conversion ratio is kilograms of feed per kilogram of fish produced. Plan with a conservative figure from your species, feed and site — not a supplier's best-case claim — and test how a higher FCR changes feed cost before committing. Biofloc may improve conversion because fish graze on the floc, but this is not guaranteed.

Tools and related guides

Ready to get comparable quotes?

Send one project request for biofloc projects from about USD 250,000. Our team reviews it, contacts suitable suppliers for you and presents comparable responses through FishMatch.

Start a project request

Planning guidance only, not engineering design or financial advice. Densities and FCR shown in the calculator are illustrative inputs and feed rates come from small research trials, not guarantees; confirm them with your feed supplier and a qualified engineer.

Short answer

How do you prepare a reviewed RFQ for Biofloc Fish Farm Planning?

Submit a private request for Biofloc Fish Farm Planning with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer