Product guide · Water treatment

RAS Biofilters — Moving-Bed, Fixed-Bed and Sand Filters Compared

The biofilter converts toxic ammonia from fish and shrimp waste into nitrate. It is the slowest part of a RAS to start and the hardest to fix later, so it deserves the most careful specification.

Short answer: A RAS biofilter grows nitrifying bacteria on media to turn ammonia into nitrate. Moving-bed filters keep plastic media moving with air; fixed beds also trap fine particles. Compare quotes on the stated surface-area basis and the design ammonia load, not media volume alone.

What ras biofilters do

  • A reactor filled with media on which nitrifying bacteria grow; they oxidise ammonia (from feed) to nitrite and then nitrate.
  • Moving-bed biofilm reactors (MBBR) keep buoyant plastic carriers circulating with aeration, which also scours old biofilm.
  • Fixed-bed filters hold media still; besides nitrification they can retain fine particles smaller than the drum filter removes.
  • Sand-based and trickling filters are older or niche options; sand moving-bed reactors were piloted again in seawater RAS in 2026.

Where it applies

  • All RAS for fish and shrimp
  • Fresh, brackish and seawater (design differs)
  • Biofloc ponds use in-pond bacteria instead

Technology maturity: MBBR and fixed bed: established. Sand moving-bed in seawater RAS: pilot (2026).

Variants compared

RAS biofilters variants and best fit
VariantBest fit
Moving-bed (MBBR)Aerated buoyant media, self-cleaning, widely used in grow-out.
Fixed bedStatic media; also retains fine particles.
Sand / fluidisedCompact; sand moving-bed piloted in seawater RAS in 2026.
Trickling filterSimple and degasses CO₂; larger footprint.

Typical specifications

Biofilter specification points and published ranges
ParameterTypical rangeWhat it means for you
Media specific surface area≈500–5,500 m²/m³ (manufacturer-stated)Suppliers quote total, protected or active area — these are not interchangeable. Ask which one.
Moving-bed fill ratio≈15–70% of reactor volume (manufacturer-stated)Higher fill means more area but less movement; confirm the design fill.
Upstream solids removalDrum filter ≈40–60 µm ahead of the biofilterSolids reaching the biofilter consume oxygen and clog fixed beds.
Start-up timeWeeks; a 2026 seawater sand-MBBR pilot needed 53 daysPlan biofilter maturation before stocking — it cannot be rushed.
Nitrification rateNo independent like-for-like figureManufacturer loading claims depend on temperature, salinity, oxygen and organic load; ask for the design basis.

Advantages

  • Removes toxic ammonia
  • Modular — add chambers to expand
  • MBBR media are self-cleaning

Limitations

  • Weeks to mature
  • Consumes oxygen and needs degassing
  • Performance depends on temperature and salinity

Maintenance

  • Check media movement and screens
  • Monitor ammonia and nitrite trends
  • Inspect aeration grids and diffusers

Risks to manage

  • Biofilter crash from chemicals or medication
  • Clogging when solids removal fails
  • Nitrite spikes during start-up

Compliance points to check

  • Check medicines and disinfectants are compatible with the biofilter
  • Nitrate and sludge discharge under local permits

Compliance points are prompts for your own review. Producers, suppliers and buyers remain responsible for the rules that apply to them; FishMatch does not certify equipment or guarantee compliance.

Sizing guidance

Size the biofilter from the daily feed load (ammonia production), water temperature, salinity and the ammonia limit for your species — not from tank volume.

Sizing guidance by project scale
Project scaleTypical biofilter approachDesign notes
Hatchery / quarantineSmall MBBR or fixed bed per systemSeparate systems per biosecurity zone; easy media cleaning matters.
Grow-out RASMBBR, often in parallel chambersParallel units allow cleaning or repair without stopping production.
Marine / fine-particle sensitiveFixed bed or MBBR + fine filtrationDiscuss degassing and fine solids control together with the biofilter.

Ask suppliers to state the design daily feed, ammonia removal capacity at your temperature and salinity, oxygen demand of the biofilter, surface-area basis and the start-up plan.

How to choose

  • Design basis in writing

    Daily feed (kg/day), water temperature, salinity and target ammonia concentration — the same inputs for every supplier.

  • Surface-area definition

    Total, protected and active area differ; comparing different definitions gives misleading results.

  • Oxygen and degassing

    Nitrification consumes oxygen and produces CO₂; confirm aeration, oxygen supply and CO₂ stripping are sized with the filter.

  • Redundancy

    Split the biofilter into chambers so one can be maintained while others keep working.

What drives the price

  • Media volume and type

    High-area media cost more per m³ but may need less volume.

  • Reactor construction

    Tank material, screens to retain media, aeration grid and access hatches.

  • Integration

    Degassing, pumping, controls and connection to the rest of the loop.

No sourced price benchmark is published for this product type. Quotations depend on capacity, materials, controls, redundancy, installation scope and delivery terms — FishMatch requests comparable quotations against your written specification instead of quoting a list price.

Common specification mistakes

  • Comparing media by volume or headline surface area without the definition.
  • Stocking before the biofilter has matured.
  • No upstream solids removal, so the biofilter clogs or loses capacity.
  • One single biofilter with no way to isolate part of it for maintenance.

RAS biofilters — buyer questions

Neither is universally better. Moving-bed filters are self-cleaning and widely used in grow-out; fixed beds can also retain fine particles. The choice depends on solids control, maintenance capacity and species.

Typically weeks. A 2026 pilot of a seawater sand moving-bed reactor reported stable nitrification after 53 days. Build maturation time into the project schedule.

Only if suppliers use the same definition. Published media figures range from about 500 to 5,500 m²/m³ but mix total, protected and active area.

Get quotes for ras biofilters

Send your duty, site conditions and target capacity once. We turn it into a comparable specification, send a confidential RFQ to producers and suppliers that may fit the project, and coordinate their replies on the same scope. Free for buyers; qualifying projects start at USD 250,000. FishMatch does not manufacture equipment, and buyers do not contact suppliers directly.

Related pages

FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As buyer or importer, you remain responsible for your own import permissions, local requirements and due diligence. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities
Step 1 of 5Equipment

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Privacy: We use these details to review and answer this request. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

Sources and review

Ranges marked "manufacturer-stated" come from public manufacturer documentation reviewed by FishMatch; they are examples, not guarantees, and supplier names are not shown. Last reviewed 2026-10-24.

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.