Aquaculture & fisheries equipment suppliers in Iceland.
Looking to buy fish farming equipment in Iceland? FishMatch sources RAS, cage, pond, shrimp, hatchery, feeding, aeration, water treatment and complete turnkey equipment from project-matched manufacturers and distributors serving Europe.
- 1 req
- Multiple suppliers
- 0%
- Buyer fees
- 1 day
- First human response
- Europe
- Regional coverage
Short answer
Where do you find aquaculture equipment suppliers in Iceland?
Buyers in Iceland normally source through three routes: direct manufacturers, regional distributors and turnkey EPC contractors. FishMatch Group runs all three in one confidential RFQ — you send a single brief, we approach project-matched suppliers serving Iceland and the wider Europe region, and you receive comparable quotations on identical scope once suppliers respond. Supplier identities remain confidential throughout the process, and buyers pay no platform fee.
The service suits commercial and industrial projects — new farms, expansions, hatcheries, processing lines and equipment replacement. It is not a retail catalogue and we do not publish supplier contact details.
- Coverage:
- Iceland and the wider Europe region
- Categories:
- RAS, cage, pond, shrimp, hatchery, feed, aeration, water treatment, processing, turnkey
- Typical timing:
- Response times vary; comparable quotes as suppliers respond
- Cost to buyer:
- Free — suppliers cover the sourcing fee
- Price factors:
- Scope, capacity, certification, freight and installation terms
- Limitations:
- Commercial projects only; indicative budgets are not engineered quotes
Iceland aquaculture production: evidence for your project brief
FAO FishStat, release 2025.1.0; reporting year 2023. National historical production is context, not supplier availability, site suitability, project yield or a cost estimate.
The published explorer records approximately 49,602 tonnes for Iceland in 2023, across reported aquaculture groups, including aquatic plants where recorded.
Five-year comparison: 19,185 tonnes in 2018 versus 49,602 tonnes in 2023. These are exact reporting-year endpoints; missing years are not interpolated.
| FAO species group | Rounded tonnes | Source flags |
|---|---|---|
| Salmons, trouts, smelts | 49,212 | No flag |
| Flounders, halibuts, soles | 390 | No flag |
Flags from FAO: E = FAO estimate, I = imputed, N = not significant (<0.5 t), B = series break. No flag = official value. Totals sum the explorer’s rounded group quantities; small rounding differences from the underlying FAO file are possible.
What this changes in a Iceland RFQ
Confirm your actual species and life stage rather than using a national group as a design target. Salmons, trouts, smelts is the largest reported group here, but this does not establish that your species, system or equipment is locally available. Supply water analysis, peak biomass and feed load, power reliability, site survey and written installation responsibilities for project-specific review.
FAO. Fishery and Aquaculture Statistics. Global aquaculture production (release 2025.1.0). FishStat. Rome. Licence: CC BY 4.0. Source file dated 2025-03-27; retrieved 2026-10-17 13:31 UTC.
Aquaculture in Iceland: what buyers are sourcing.
RAS pioneer for salmon and arctic char.
Top farmed species in Iceland include salmon, arctic-char. FishMatch Group runs a private, anonymized sourcing process for RAS systems, cages, ponds, hatcheries, feed & aeration equipment and full turnkey projects serving Iceland and the wider Northern Europe region.
Aquaculture suppliers for Icelandic salmon and char farms
Icelandic buyers search for aquaculture suppliers and equipment wholesalers for land-based salmon and arctic char farms using geothermal water and seawater wells, plus sea cages in the fjords. Typical scope is flow-through and RAS tanks, pumps, oxygen, degassing, feeders and fish handling equipment.
- Land-based tanks, pumps, oxygen and degassing
- Sea-cage equipment for fjord sites
- Wholesale quotes compared on identical scope
Iceland market facts
- Production
- 54,800 t in 2024 (+10%), export value ISK 53.8 bn · source
- Main farmed species
- Atlantic salmon (~49,300 t), Arctic char (~4,800 t), small volumes of rainbow trout · source
- Market position
- Europe's 3rd-largest salmon farmer and the world's largest Arctic char producer · source
- Import duty
- Check the line in the Icelandic Customs Tariff · source
- VAT
- 24%
- Main import ports
- Reykjavík, plus east and west fjord ports near the farms
Typical equipment prices for Iceland projects
| Equipment | Public price range | Source |
|---|---|---|
| Commercial RAS, equipment + installationCommon in Iceland | USD 9,000 – 25,000 per tonne of yearly capacity | RAStech capital cost study |
| PSA oxygen generator for fish farmsCommon in Iceland | USD 5,000 – 40,000 by capacity | Manufacturer price listings |
| Drum filter, 30–100 m³/hCommon in Iceland | USD 1,250 – 3,540 | Public drum filter price list |
| Paddlewheel aerator, 2 HP | USD 300 – 1,250 per unit | Factory listing (USD 299) to US retail (USD 1,250) |
| Automatic pond feeder (40–120 kg hopper) | USD 85 – 900 per unit | Manufacturer price listings |
| HDPE floating fish cage (small to mid) | USD 2,000 – 10,000 per cage | Manufacturer price listings |
Planning estimate only: public list prices, before shipping to Iceland, import duty, installation and local taxes. Your quote depends on capacity and scope.
Planning calculators for a project in Iceland
Free planning-grade tools, calculated in your browser. Use them to size and cost the system before requesting quotations — then send the result into a structured RFQ so suppliers quote the same scope.
Pond or indoor shrimp CAPEX, stocking and production estimate.
Revenue, operating cost and payback for a commercial farm.
Flow, biofilter area, oxygen demand and system cost band.
Capital and lifetime running cost compared side by side.
Feed volume, FCR and annual feed budget for your cycle.
Build a CAPEX budget you can put straight into an RFQ.
Sourcing equipment in Iceland — how it works.
- 01
Local + global match
Suppliers serving Iceland and regional manufacturers shortlisted.
- 02
Qualification
Scope, warranty and after-sales terms reviewed on available information; project references requested. Qualification is not certification or a performance guarantee.
- 03
Logistics
Shipping into Iceland, customs and duties handled by the supplier or logistics partner where included in the quote; import clearance remains the buyer's responsibility.
- 04
Installation
Installation, commissioning, operator training and after-sales support are performed by the supplier or its EPC partner where included in the quote.
Equipment we source in Iceland
- Fish processing
- Cold chain
- Fish farming
- Aquaculture systems
- RAS
- Feeding systems
- Aeration
- Water treatment
- Filtration
- Monitoring & IoT
- Hatchery
- Cage farming
- Pond farming
- Shrimp farming
- Offshore aquaculture
- Turnkey farm
- Financing
Post-smolt & smolt RAS equipment sourcing
Filtration, degassing, oxygenation, water treatment and controls sized from daily feed load — specs, capacity bands, cost drivers and the RFQ fields suppliers need.
Need financing for your project in Iceland?
Qualified projects in Iceland may be introduced to independent third-party equipment, turnkey or expansion financing providers. Approval and terms are set solely by the provider.
Check financingFish Farming Suppliers in Iceland: Aquaculture Procurement
Local and international suppliers can both serve projects in Iceland. Before comparing them, put every quote on the same basis.
1.Write one specification first
Species, target tonnes per year, system type, site, water source and budget. Quotes built on the same brief can be compared line by line; quotes built on different assumptions cannot.
2.Ask for the same delivery terms
Request every price on the same Incoterms® 2020 rule (for example FOB or CIF, named port). Mixed terms hide freight, insurance and duty differences (ICC).
3.Separate equipment from design and installation
Ask suppliers to price equipment, engineering, installation supervision, commissioning and training as separate lines, so missing scope is visible.
4.Check the technical basis
For RAS, ask how flow, oxygen and biofilter capacity were sized from the feed load — the method in Timmons & Ebeling is a common reference.
5.Confirm certification needs early
If your buyers require ASC or BAP, tell suppliers before design and check the applicable standard. FAO's certification guidelines provide a broader reference for environmental, social, food-safety and animal-health criteria; they do not certify a supplier or a project.
6.Compare total cost, not unit price
Include spares, warranty terms, currency, payment milestones and lead time. The lowest equipment price is not always the lowest project cost.
How FishMatch Group handles aquaculture procurement
A specialist reviews your brief, asks for anything missing, then contacts relevant suppliers privately. Available proposals are organised in one comparison, line by line, with differences and exclusions identified. FishMatch Group is supplier-neutral: it does not manufacture equipment, build or operate farms, or lend. Supplier names, websites and contact details stay confidential. We do not guarantee a number of proposals, the lowest price or financing approval.
Open the RFQ form →Planning a shrimp farm? Get a free cost estimate from your pond size, stocking density and harvest goals
Structured intake
Full RFQ intake for your aquaculture project
Human-reviewed infrastructure RFQs start at USD 250,000. Buyers pay nothing; sourcing is supplier-funded. Define species, capacity, system, measured water conditions, equipment scope, standards, destination, timing and budget. Supplier identities remain confidential. Smaller requests are saved separately and directed to free planning tools.
Your details are never published and never shared with a supplier under your name without approval.
FAQ — Aquaculture equipment in Iceland
Go deeper on sourcing in Iceland
Category-specific pages for this market — each one returns matched quotes from qualified suppliers without revealing supplier identities.
Other countries in Europe
Equipment, RFQs and planning tools for Iceland
Equipment & services in Iceland
Request quotes
- RAS Systems RFQ — IcelandOne brief, matched supplier quotes
- Salmon RAS & Cage Systems RFQ — IcelandOne brief, matched supplier quotes
- Get quotes for IcelandFree for buyers — suppliers pay our fee
- Enterprise tender wizardStructured tender for larger builds
- Project & equipment financingLeasing, export credit, expansion loans
Plan before you buy
- RAS sizing calculatorTank volume, flow and biofilter load
- Commercial CAPEX calculatorBudget a full build before RFQ
- Shrimp farm & survival calculatorYield, survival and margin per cycle
- Project ROI calculatorPayback and return on invested capital
- Oxygen requirement calculatorSize aeration and oxygenation
- Feed budget calculatorAnnual feed cost by species and FCR
- All aquaculture calculators
Aquaculture equipment sourcing beyond Iceland
By equipment category
- RAS systems & recirculating aquaculture equipment
- Fish feeding systems & automatic feeders
- Aeration systems for shrimp ponds & fish farms
- Water treatment & filtration systems
- Fish hatchery equipment
- Shrimp farming equipment
- Monitoring & IoT systems for water quality
- Cage & offshore aquaculture systems
- Turnkey fish farms
Other supplier countries
- Aquaculture equipment suppliers in Spain
- Aquaculture equipment suppliers in Norway
- Aquaculture equipment suppliers in Thailand
- Aquaculture equipment suppliers in the Philippines
- Aquaculture equipment suppliers in Vietnam
- Aquaculture equipment suppliers in Malaysia
- Aquaculture equipment suppliers in Mexico
- Aquaculture equipment suppliers in Egypt
- Aquaculture equipment suppliers in Indonesia
- Aquaculture equipment suppliers in Ecuador
- Aquaculture equipment suppliers in India
- Aquaculture equipment suppliers in Chile
Financing for your project
Explore aquaculture and RAS suppliers here for research and market discovery, or start with your project requirements so FishMatch can help structure the RFQ and identify relevant system providers for that specific production plan.
Directory — research
Browse categories, countries and technology types to understand the market and which system types exist. Nothing is requested and no supplier is contacted.
Project sourcing — RFQ
Define species, system, production target and site conditions, size the requirement with the planning tools, and build one structured RFQ. Manufacturer research follows the requirement.
- FishMatch helps prepare aquaculture RFQs and source relevant suppliers.
- Supplier and manufacturer listings are provided for independent research, transparency and reference. Listing does not constitute certification, endorsement, qualification for a specific project or automatic introduction.
- Buyer follow-up and supplier selection are handled by FishMatch.
There is no instant or automated supplier match. Manufacturer research happens after the project requirement is clear and is reviewed by the FishMatch team before any supplier is approached.
Manufacturers can register in the free directory and keep their company details up to date. Being listed is a research and visibility surface — it does not create an automatic connection to buyers, and it does not replace the human sourcing process.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
Is your project in Iceland a fit?
FishMatch Group handles commercial B2B projects with a total budget of USD 250,000 or more — new farms, hatcheries, RAS, cages, processing or expansions. The buyer sends one brief; our team reviews and structures the RFQ, then approaches suitable suppliers on the buyer's behalf. Buyers are not put in direct contact with manufacturers at this stage. Smaller or idea-stage projects can start with the calculators below and send the RFQ once scope and budget are clearer.
Which inputs change the estimate and the RFQ?
Calculator results and supplier quotes both depend on: species and life stage, production target (tonnes per year or PL per cycle), water source and quality (temperature, salinity, flow), system design (pond, cage, RAS, hatchery, processing), site and access, energy supply and price, permits, and timeline.
Calculator figures are planning estimates based on stated assumptions — not engineering designs or supplier quotes. Growth, survival and output depend on project-specific biology and operating conditions and are never guaranteed. Formulas, assumptions and sources: calculator methodology.
2. Equipment & project sourcing
Send a structured RFQ. A person checks scope and budget before any supplier is approached.
Start the project RFQ3. Financing (separate)
Financing is a separate track. FishMatch Group does not lend or guarantee financing.
Aquaculture financingMore on Iceland
Each page answers a different stage of the same project — market, suppliers, feasibility and equipment.
Before you request quotes
Equipment scope
What equipment does a commercial aquaculture project actually need?
A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.
Which equipment should be specified before requesting quotes?
Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.
Can equipment be sourced in stages?
Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.
Supplier selection criteria
How should a buyer compare aquaculture suppliers?
Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.
What are the warning signs in a supplier quotation?
Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.
How does FishMatch handle supplier selection?
FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.