← All countries

Aquaculture equipment suppliers in United Kingdom.

Looking to buy fish farming equipment in United Kingdom? FishMatch sources RAS, cage, pond, shrimp, hatchery, feeding, aeration, water treatment and complete turnkey equipment from project-matched manufacturers and distributors serving Europe.

1 req
Multiple suppliers
0%
Buyer fees
1 day
First human response
Europe
Regional coverage

Short answer

Where do you find aquaculture equipment suppliers in United Kingdom?

Buyers in United Kingdom normally source through three routes: direct manufacturers, regional distributors and turnkey EPC contractors. FishMatch Group runs all three in one confidential RFQ — you send a single brief, we approach project-matched suppliers serving United Kingdom and the wider Europe region, and you receive comparable quotations on identical scope once suppliers respond. Supplier identities remain confidential throughout the process, and buyers pay no platform fee.

The service suits commercial and industrial projects — new farms, expansions, hatcheries, processing lines and equipment replacement. It is not a retail catalogue and we do not publish supplier contact details.

Coverage:
United Kingdom and the wider Europe region
Categories:
RAS, cage, pond, shrimp, hatchery, feed, aeration, water treatment, processing, turnkey
Typical timing:
Response times vary; comparable quotes as suppliers respond
Cost to buyer:
Free — suppliers cover the sourcing fee
Price factors:
Scope, capacity, certification, freight and installation terms
Limitations:
Commercial projects only; indicative budgets are not engineered quotes

United Kingdom aquaculture production: evidence for your project brief

FAO FishStat, release 2025.1.0; reporting year 2023. National historical production is context, not supplier availability, site suitability, project yield or a cost estimate.

The published explorer records approximately 183,109 tonnes for United Kingdom of Great Britain and Northern Ireland in 2023, across reported aquaculture groups, including aquatic plants where recorded.

Five-year comparison: 189,921 tonnes in 2018 versus 183,109 tonnes in 2023. These are exact reporting-year endpoints; missing years are not interpolated.

Largest reported groups in United Kingdom, 2023
FAO species groupRounded tonnesSource flags
Salmons, trouts, smelts164,707No flag
Mussels14,091No flag
Oysters2,579No flag
Clams, cockles, arkshells1,483No flag

Flags from FAO: E = FAO estimate, I = imputed, N = not significant (<0.5 t), B = series break. No flag = official value. Totals sum the explorer’s rounded group quantities; small rounding differences from the underlying FAO file are possible.

What this changes in a United Kingdom RFQ

Confirm your actual species and life stage rather than using a national group as a design target. Salmons, trouts, smelts is the largest reported group here, but this does not establish that your species, system or equipment is locally available. Supply water analysis, peak biomass and feed load, power reliability, site survey and written installation responsibilities for project-specific review.

FAO. Fishery and Aquaculture Statistics. Global aquaculture production (release 2025.1.0). FishStat. Rome. Licence: CC BY 4.0. Source file dated 2025-03-27; retrieved 2026-10-17 13:31 UTC.

United Kingdom market focus

Aquaculture in United Kingdom: what buyers are sourcing.

Salmon (Scotland) and shellfish industry.

Top farmed species in United Kingdom include salmon, shellfish. FishMatch Group runs a private, anonymized sourcing process for RAS systems, cages, ponds, hatcheries, feed & aeration equipment and full turnkey projects serving United Kingdom and the wider Northern Europe region.

salmonshellfish

The United Kingdom is Europe's second-largest Atlantic salmon producer, with the industry concentrated on the Scottish west coast and islands, alongside a substantial shellfish sector and a growing land-based RAS pipeline in England and Wales. Post-Brexit, procurement now carries a customs and conformity layer that did not exist before: UKCA/CE marking, GB import formalities and rules-of-origin evidence all belong in the RFQ rather than in a late email exchange.

Species focus and the systems buyers specify

SpeciesSystemsSourcing notes
Atlantic salmon — sea grow-outCircular HDPE cages, heavy grid moorings, feed barges, monitoringScottish west-coast and island sites are increasingly exposed, pushing larger collars, deeper nets and higher mooring load classes, with sea-lice management driving skirts, sensors and freshwater treatment.
Salmon smolt & post-smoltLand-based freshwater RASProducers are extending the freshwater stage on land to shorten sea time. Buyers specify drum filters, MBBR biofilters, CO₂ stripping, oxygenation and full redundancy with documented emergency oxygen response.
Shellfish — mussels, oysters, scallopsLonglines, trestles, bags, grading and purificationScotland, Wales and the south and east coasts of England. Purification (depuration) systems and classified-water compliance shape the equipment list.
Trout and emerging land-based speciesFlow-through raceways and RASInland trout farming across England and Scotland, plus land-based warm-water projects using waste-heat and shrimp or tilapia RAS.

What is driving equipment demand

  • More exposed Scottish sites raise required exposure classes for collars, nets and mooring grids.
  • Sea-lice and fish-welfare scrutiny drives investment in monitoring, freshwater treatment and gentler handling systems.
  • Post-smolt strategy is expanding land-based RAS capacity ahead of sea-cage capacity.
  • Energy price volatility makes pump, blower and heat-recovery efficiency a decisive selection criterion.
  • Shellfish purification and traceability requirements sustain steady demand for depuration and grading equipment.

Permits, standards and documentation for United Kingdom: United Kingdom aquaculture compliance guide.

Regulatory requirements

Which permissions and standards buyers check in United Kingdom

  • UKCA marking applies to most machinery placed on the GB market; CE remains relevant for Northern Ireland and for EU-sourced supply — state the required route in the RFQ.
  • SEPA (Scotland) and the Environment Agency / NRW set biomass and discharge limits that cap equipment sizing.
  • Marine licences and Crown Estate leases determine permitted structures and mooring footprint.
  • Fish-health and welfare rules govern handling, mortality removal and stunning equipment specification.
  • Shellfish harvesting-area classification determines whether purification equipment is mandatory.
Startup sequence

How to start a fish or shrimp farm in United Kingdom

  1. 1. Confirm licence and consent

    Marine sites need a marine licence plus a SEPA (Scotland) or Environment Agency/NRW (England/Wales) authorisation; land-based sites need abstraction and discharge consents. These define permitted biomass and effluent limits.

  2. 2. Commission measured site data

    Current, significant wave height, depth and seabed type for marine sites; water chemistry, temperature and available power for land-based.

  3. 3. Fix the production plan

    Species, size at transfer and target biomass set cage count, net volume, biofilter area and oxygen demand.

  4. 4. Specify to UK conformity rules

    UKCA and/or CE marking depending on route to market, plus BS 7671 electrical installation requirements.

  5. 5. Issue one comparable RFQ

    Combine consents, site data and production plan so UK, EU and international suppliers quote identical scope landed to site.

  6. 6. Book installation windows

    Mooring vessels, divers and cranes on west-coast and island sites are the real schedule constraint — reserve them alongside the order.

Regulatory requirements change — confirm current scope with the relevant authorities or a local agent before fixing your schedule.

Ports & logistics

Getting equipment into United Kingdom

Equipment arrives through Felixstowe, Southampton and London Gateway for containerised cargo, or by road and ferry from the EU for European-built systems. Since Brexit, EU road freight requires full customs formalities, so build clearance time into the plan. The last leg to Scottish west-coast and island sites — ferry, workboat and crane — usually governs the schedule.

Felixstowe / London Gateway

Main container gateways

Widest global connectivity for Asian-built equipment; onward road distribution nationwide.

Southampton

Southern container port

Alternative gateway with good project-cargo handling.

Grangemouth / Greenock

Scottish gateways

Shorter onward road transfer to the west-coast salmon cluster.

Aberdeen / Peterhead

North-east marine service base

Vessel, mooring and offshore-service capability relevant to cage installation.

Island ferry network

Final leg

Cages, moorings and barges move by ferry or workboat to the Hebrides, Orkney and Shetland; plan knock-down packing and confirm crane capacity.

Regional clusters

Where aquaculture equipment is needed in United Kingdom

Scottish west coast & Argyll

Salmon farming core

Highest density of sites and the main service, net-washing and mooring contractor base.

Hebrides, Orkney & Shetland

Exposed island sites

Higher exposure class, longer service response and demanding transport logistics.

England & Wales inland

RAS and trout cluster

Land-based projects near power and water infrastructure, plus established trout farms.

South & east coasts

Shellfish cluster

Oyster trestles, mussel longlines and purification plants serving domestic and EU markets.

Lead times

Indicative delivery lead times

HDPE cages, nets and moorings8–18 weeks
Exposure-class engineering review adds time on open west-coast sites.
Mooring installation4–12 weeks after delivery
Vessel and diver availability plus weather standby usually set the date.
RAS process trains18–36 weeks
Plus 4–8 weeks biofilter maturation before stocking.
Purification and grading systems10–20 weeks
Food-contact and classification documentation should ship with the equipment.
Customs clearance (EU road freight)3–10 days
Post-Brexit formalities apply even to intra-European supply.

Planning benchmarks only — confirm against supplier quotations for your scope.

Documentation & compliance

What buyers in United Kingdom must document

UKCA / CE conformity
Declaration of conformity plus technical file; agree the marking route in the contract.
Electrical standard
230 V single-phase and 400 V three-phase at 50 Hz, installed to BS 7671.
Import documentation
Commercial invoice, packing list, bill of lading and proof of origin under the UK–EU Trade and Cooperation Agreement where applicable.
Mooring analysis
Site-specific analysis against measured current and wave data, signed by the supplier's engineer.
Discharge design data
Solids and nutrient performance figures adequate for the SEPA or Environment Agency permit.
Landed-cost drivers

What moves the delivered cost in United Kingdom

  • Quote landed to site, not to the port: island ferry, crane hire and diver services move total cost materially.
  • Post-Brexit customs brokerage and origin evidence are a real cost line on EU-sourced equipment — price them explicitly.
  • Energy is the dominant RAS operating cost; compare kWh per kilogram produced rather than purchase price alone.
  • Mooring installation and weather standby are the most commonly under-budgeted items on marine projects.
  • UK-held spares and a contracted response time usually pay for themselves on remote west-coast sites.

Sourcing equipment in United Kingdom — how it works.

  1. 01

    Local + global match

    Suppliers serving United Kingdom and regional manufacturers shortlisted.

  2. 02

    Qualification

    Scope, warranty and after-sales terms reviewed on available information; project references requested. Qualification is not certification or a performance guarantee.

  3. 03

    Logistics

    Shipping into United Kingdom, customs and duties handled by the supplier or logistics partner where included in the quote; import clearance remains the buyer's responsibility.

  4. 04

    Installation

    Installation, commissioning, operator training and after-sales support are performed by the supplier or its EPC partner where included in the quote.

Equipment we source in United Kingdom

Financing in United Kingdom

Need financing for your project in United Kingdom?

Qualified projects in United Kingdom may be introduced to independent third-party equipment, turnkey or expansion financing providers. Approval and terms are set solely by the provider.

Check financing
Buyer guide

Fish Farming Suppliers in United Kingdom: Aquaculture Procurement

Local and international suppliers can both serve projects in United Kingdom. Before comparing them, put every quote on the same basis.

  1. 1.Write one specification first

    Species, target tonnes per year, system type, site, water source and budget. Quotes built on the same brief can be compared line by line; quotes built on different assumptions cannot.

  2. 2.Ask for the same delivery terms

    Request every price on the same Incoterms® 2020 rule (for example FOB or CIF, named port). Mixed terms hide freight, insurance and duty differences (ICC).

  3. 3.Separate equipment from design and installation

    Ask suppliers to price equipment, engineering, installation supervision, commissioning and training as separate lines, so missing scope is visible.

  4. 4.Check the technical basis

    For RAS, ask how flow, oxygen and biofilter capacity were sized from the feed load — the method in Timmons & Ebeling is a common reference.

  5. 5.Confirm certification needs early

    If your buyers require ASC or BAP, tell suppliers before design and check the applicable standard. FAO's certification guidelines provide a broader reference for environmental, social, food-safety and animal-health criteria; they do not certify a supplier or a project.

  6. 6.Compare total cost, not unit price

    Include spares, warranty terms, currency, payment milestones and lead time. The lowest equipment price is not always the lowest project cost.

How FishMatch Group handles aquaculture procurement

A specialist reviews your brief, asks for anything missing, then contacts relevant suppliers privately. Available proposals are organised in one comparison, line by line, with differences and exclusions identified. FishMatch Group is supplier-neutral: it does not manufacture equipment, build or operate farms, or lend. Supplier names, websites and contact details stay confidential. We do not guarantee a number of proposals, the lowest price or financing approval.

Open the RFQ form →

Planning a shrimp farm? Get a free cost estimate from your pond size, stocking density and harvest goals

Sources

Structured intake

Full RFQ intake for your aquaculture project

Human-reviewed infrastructure RFQs start at USD 250,000. Buyers pay nothing; sourcing is supplier-funded. Define species, capacity, system, measured water conditions, equipment scope, standards, destination, timing and budget. Supplier identities remain confidential. Smaller requests are saved separately and directed to free planning tools.

Your details are never published and never shared with a supplier under your name without approval.

FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As buyer or importer, you remain responsible for your own import permissions, local requirements and due diligence. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

Step 1 of 5

1. Contact

1. Contact

Your contact details stay private and let our team clarify the project before any supplier outreach.

Privacy: We use these details to review and answer this request. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

FAQ — Aquaculture equipment in United Kingdom

Exposure-rated sea cages, nets and mooring grids for the Scottish west coast; land-based smolt and post-smolt RAS; feeding, biomass and sea-lice monitoring systems; freshwater treatment for lice management; and shellfish longline, grading and purification equipment.

Felixstowe, London Gateway and Southampton handle most containerised imports; Grangemouth and Greenock shorten the road leg to Scotland; and Aberdeen and Peterhead provide marine service capability. EU-built equipment often arrives by road and ferry, which is faster but now requires full customs formalities.

Most machinery placed on the Great Britain market needs UKCA marking, while CE remains relevant for Northern Ireland and for equipment supplied from the EU. State which route applies in the RFQ and make the declaration of conformity and technical file a delivery requirement.

Indicatively: cages, nets and moorings 8–18 weeks; mooring installation a further 4–12 weeks subject to vessels and weather; RAS process trains 18–36 weeks plus biofilter maturation; purification and grading systems 10–20 weeks. Island transfer adds one to three weeks.

The environmental authorisation (SEPA in Scotland, the Environment Agency or NRW elsewhere) and the marine licence set permitted biomass and discharge. Specify cage volume, feeding capacity and monitoring against that ceiling rather than against a growth ambition.

Yes — mainly as smolt and post-smolt capacity that shortens sea time, plus a smaller pipeline of full-cycle projects. Electricity price and abstraction/discharge consents decide viability more than equipment choice does.

Buyers increasingly specify lice counting and biomass cameras, shielding skirts, freshwater or thermal treatment systems and gentler handling gear. Welfare evidence and treatment records are now part of the purchase specification.

230 V single-phase and 400 V three-phase at 50 Hz, with the installation designed to BS 7671. Confirm motor, drive and control-gear compatibility and IP ratings for exposed marine environments in the quotation.

UK and Nordic suppliers bring proven cold-water and exposed-site experience with fast service response; international suppliers are often competitive on RAS components and general machinery. We run both routes in one RFQ so the comparison is on identical scope and landed cost.

No. FishMatch Group is an independent sourcing platform. We prepare your specification, run a confidential RFQ to project-matched suppliers serving the UK, and return comparable quotations landed to your site. Buyers pay nothing, and supplier identities stay confidential until you choose to engage.

Distributors and dealers active in United Kingdom are usually regional agents for international manufacturers of aeration, pumping, feeding, filtration and monitoring equipment. FishMatch Group researches those companies from public information, then approaches the ones whose product range and service coverage match your project. We are not a distributor ourselves and do not sell equipment.

Commercial buyers in United Kingdom normally buy directly from manufacturers or from their regional distributors rather than from retail outlets. You send one brief describing species, capacity and site conditions; we prepare a technical RFQ and run a confidential round with manufacturers, exporters and distributors that already ship to Europe.

Yes. Requests are put to manufacturers, wholesalers, exporters and turnkey contractors, selected by capability for your system type rather than by any commercial relationship. Quotes come back in a comparable format with scope, lead time and delivered cost to United Kingdom stated the same way.

Submit one sourcing brief with your species, system and capacity. FishMatch Group matches it against manufacturers, exporters and distributors already serving United Kingdom and Europe, then returns comparable quotes — you never have to contact suppliers one by one.

Cost depends on system type and scale rather than location: small pond or cage setups typically start in the tens of thousands of USD, while commercial RAS and turnkey farms run from several hundred thousand to multi-million USD. Landed cost in United Kingdom also includes freight, duties, installation and commissioning — all of which are itemised in the quotes you receive.

Stock items and small equipment usually ship in 2–6 weeks. Engineered RAS, hatchery and processing lines are typically 8–20 weeks from order confirmation, plus 3–6 weeks of sea freight and customs clearance into United Kingdom.

Yes. The manufacturers we work with export regularly to Europe and quote door-to-door where required, covering sea or air freight, customs documentation, on-site installation, commissioning and operator training in United Kingdom.

We check company registration, export history into Europe, reference projects of comparable scale, certifications and after-sales capability before a supplier is matched to a United Kingdom project. Supplier identities stay confidential until you decide to proceed.

There is no fixed minimum, but sourcing works best for projects above roughly USD 25,000. Smaller orders are usually matched with regional distributors serving United Kingdom rather than factory-direct manufacturers.

Qualified projects in United Kingdom may be eligible for equipment leasing, export credit, working capital or structured project finance from USD 250,000 upwards through our international financing partners. Financing is reviewed confidentially alongside your equipment quotes.

We prioritise suppliers with regional service coverage or a distributor presence in Europe, and spare-parts availability, warranty terms and remote support are compared as part of every quote package for United Kingdom.

Nothing. Buyers in United Kingdom pay no fee for sourcing, quote comparison or financing introductions — suppliers cover the fee only when a qualified opportunity is delivered.

Most complete briefs receive 2–3 matched supplier quotes once suppliers respond. Complex turnkey or RAS projects in United Kingdom take longer because they require engineered scopes and layout drawings; timing depends on supplier response.

RAS and post-smolt systems, sea and lake cages, lined and earthen ponds, biofloc and shrimp systems, hatchery and nursery lines, feed handling, aeration and oxygenation, water treatment, cold chain and processing equipment are all sourced for projects in United Kingdom and across Europe.

No. You submit a single brief and we run the outreach, technical clarification and price negotiation with matched manufacturers on your behalf. Supplier identities stay confidential until you decide which quote to progress for your United Kingdom project.

Yes. Turnkey scopes covering process design, civil interface, equipment supply, installation, commissioning and operator training are quoted by EPC partners with delivery experience in Europe, so the United Kingdom package arrives as one comparable price rather than a dozen separate line items.

Species, target annual tonnage, site water source and quality, available land or sea area, power availability and a target start date are enough to begin. Site drawings, permits and water analyses for United Kingdom sharpen the engineered scope but are not required for the first round of quotes.

We match suppliers whose equipment, certification and documentation meet the standards enforced in United Kingdom and Europe, and quotes include the technical files, CE or equivalent conformity documents and effluent or biosecurity specifications your permitting process is likely to request.

Every quote is returned in a comparable format: equipment scope, capacity assumptions, energy and labour requirements, Incoterm and freight to United Kingdom, installation, warranty, spare parts and payment terms — so you compare total delivered cost of ownership instead of headline equipment price.

Go deeper on sourcing in United Kingdom

Category-specific pages for this market — each one returns matched quotes from qualified suppliers without revealing supplier identities.

Explore aquaculture and RAS suppliers here for research and market discovery, or start with your project requirements so FishMatch can help structure the RFQ and identify relevant system providers for that specific production plan.

Directory — research

Browse categories, countries and technology types to understand the market and which system types exist. Nothing is requested and no supplier is contacted.

Project sourcing — RFQ

Define species, system, production target and site conditions, size the requirement with the planning tools, and build one structured RFQ. Manufacturer research follows the requirement.

  • FishMatch helps prepare aquaculture RFQs and source relevant suppliers.
  • Supplier and manufacturer listings are provided for independent research, transparency and reference. Listing does not constitute certification, endorsement, qualification for a specific project or automatic introduction.
  • Buyer follow-up and supplier selection are handled by FishMatch.

There is no instant or automated supplier match. Manufacturer research happens after the project requirement is clear and is reviewed by the FishMatch team before any supplier is approached.

Manufacturers can register in the free directory and keep their company details up to date. Being listed is a research and visibility surface — it does not create an automatic connection to buyers, and it does not replace the human sourcing process.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

Commercial project route

Is your project in United Kingdom a fit?

FishMatch Group handles commercial B2B projects with a total budget of USD 250,000 or more — new farms, hatcheries, RAS, cages, processing or expansions. The buyer sends one brief; our team reviews and structures the RFQ, then approaches suitable suppliers on the buyer's behalf. Buyers are not put in direct contact with manufacturers at this stage. Smaller or idea-stage projects can start with the calculators below and send the RFQ once scope and budget are clearer.

Which inputs change the estimate and the RFQ?

Calculator results and supplier quotes both depend on: species and life stage, production target (tonnes per year or PL per cycle), water source and quality (temperature, salinity, flow), system design (pond, cage, RAS, hatchery, processing), site and access, energy supply and price, permits, and timeline.

Calculator figures are planning estimates based on stated assumptions — not engineering designs or supplier quotes. Growth, survival and output depend on project-specific biology and operating conditions and are never guaranteed. Formulas, assumptions and sources: calculator methodology.

2. Equipment & project sourcing

Send a structured RFQ. A person checks scope and budget before any supplier is approached.

Start the project RFQ

3. Financing (separate)

Financing is a separate track. FishMatch Group does not lend or guarantee financing.

Aquaculture financing

More on United Kingdom

Each page answers a different stage of the same project — market, suppliers, feasibility and equipment.

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.