← All countries

Aquaculture machines & fish farming equipment in Greece.

Looking to buy fish farming equipment in Greece? FishMatch sources RAS, cage, pond, shrimp, hatchery, feeding, aeration, water treatment and complete turnkey equipment from project-matched manufacturers and distributors serving Europe.

1 req
Multiple suppliers
0%
Buyer fees
1 day
First human response
Europe
Regional coverage

Short answer

Where do you find aquaculture equipment suppliers in Greece?

Buyers in Greece normally source through three routes: direct manufacturers, regional distributors and turnkey EPC contractors. FishMatch Group runs all three in one confidential RFQ — you send a single brief, we approach project-matched suppliers serving Greece and the wider Europe region, and you receive comparable quotations on identical scope once suppliers respond. Supplier identities remain confidential throughout the process, and buyers pay no platform fee.

The service suits commercial and industrial projects — new farms, expansions, hatcheries, processing lines and equipment replacement. It is not a retail catalogue and we do not publish supplier contact details.

Coverage:
Greece and the wider Europe region
Categories:
RAS, cage, pond, shrimp, hatchery, feed, aeration, water treatment, processing, turnkey
Typical timing:
Response times vary; comparable quotes as suppliers respond
Cost to buyer:
Free — suppliers cover the sourcing fee
Price factors:
Scope, capacity, certification, freight and installation terms
Limitations:
Commercial projects only; indicative budgets are not engineered quotes

Greece aquaculture production: evidence for your project brief

FAO FishStat, release 2025.1.0; reporting year 2023. National historical production is context, not supplier availability, site suitability, project yield or a cost estimate.

The published explorer records approximately 141,933 tonnes for Greece in 2023, across reported aquaculture groups, including aquatic plants where recorded.

Five-year comparison: 132,365 tonnes in 2018 versus 141,933 tonnes in 2023. These are exact reporting-year endpoints; missing years are not interpolated.

Largest reported groups in Greece, 2023
FAO species groupRounded tonnesSource flags
Miscellaneous coastal fishes120,794I
Mussels18,008No flag
Salmons, trouts, smelts2,104No flag
River eels604I

Flags from FAO: E = FAO estimate, I = imputed, N = not significant (<0.5 t), B = series break. No flag = official value. Totals sum the explorer’s rounded group quantities; small rounding differences from the underlying FAO file are possible.

What this changes in a Greece RFQ

Confirm your actual species and life stage rather than using a national group as a design target. Miscellaneous coastal fishes is the largest reported group here, but this does not establish that your species, system or equipment is locally available. Supply water analysis, peak biomass and feed load, power reliability, site survey and written installation responsibilities for project-specific review.

FAO. Fishery and Aquaculture Statistics. Global aquaculture production (release 2025.1.0). FishStat. Rome. Licence: CC BY 4.0. Source file dated 2025-03-27; retrieved 2026-10-17 13:31 UTC.

Greece market focus

Aquaculture in Greece: what buyers are sourcing.

Mediterranean cage hub for bass & bream.

Top farmed species in Greece include sea-bass, sea-bream. FishMatch Group runs a private, anonymized sourcing process for RAS systems, cages, ponds, hatcheries, feed & aeration equipment and full turnkey projects serving Greece and the wider Mediterranean region.

sea basssea bream

Greece is the Mediterranean's largest producer of European seabass and gilthead seabream, farmed in marine cages across the Aegean, Ionian and Evia coastlines and supported by one of the world's strongest marine hatchery clusters. The industry has consolidated into a small number of large, professional groups, so purchasing is specification-driven: buyers ask for measured site data, certification, documented service response and spare-parts logistics before price is even discussed.

Species focus and the systems buyers specify

SpeciesSystemsSourcing notes
European seabass (Dicentrarchus labrax)Circular HDPE marine cages, mooring grids, feed bargesThe volume species alongside seabream. Cage circumference is typically 50–90 m with net depths of 8–20 m depending on exposure. Buyers specify collar and mooring class against measured current and significant wave height, plus predator nets, anti-fouling treatment and in-situ net cleaning.
Gilthead seabream (Sparus aurata)Marine cages, shared site infrastructureFarmed on the same sites and largely the same equipment as seabass, with different grading and harvest profiles. Size-grading equipment, biomass estimation and feeding control carry most of the incremental spend.
Meagre, dentex and other emerging marine speciesMarine cages, nursery tanksDiversification species used to spread market risk. Nursery tank systems, weaning units and adapted cage nets are the usual equipment additions rather than a whole new farm build.
Marine hatchery & nursery productionLand-based flow-through and RAS hatcheriesGreece exports juveniles across the Mediterranean. Equipment demand covers broodstock and larval tanks, rotifer and artemia live-feed units, RAS skids, protein skimmers, UV and ozone disinfection, heat exchangers and precise temperature control.
Mussels (Mytilus galloprovincialis)Longline and raft cultureConcentrated in the northern Aegean gulfs. Lower ticket per unit but continuous demand for longline hardware, floats, seeding and de-clumping machines, grading and depuration systems.

What is driving equipment demand

  • Sector consolidation into large groups means fleet-wide cage and mooring replacement is procured in structured tenders rather than one cage at a time.
  • Movement of sites to more exposed Aegean locations raises the required exposure class for collars, nets and mooring grids.
  • Feed is the dominant operating cost, so camera-assisted feeding control and biomass estimation systems have the clearest payback case.
  • Daily chilled export to EU markets keeps ice, grading, packing and chill-room equipment on a continuous replacement cycle.
  • Hatchery capacity serving the whole Mediterranean drives steady investment in larval systems, live-feed units and water treatment.
  • EU environmental and animal-welfare rules push investment in mortality removal, monitoring, and documented escape prevention.
Regulatory requirements

Which permissions and standards buyers check in Greece

  • Aquaculture leases and licences are issued under Greek marine spatial planning rules (POAY zones); site coordinates, permitted biomass and permitted structures determine the cage and mooring layout that can legally be installed.
  • Environmental approval defines the maximum permitted biomass and monitoring obligations for the site — specify equipment against that ceiling, not against ambition.
  • EU machinery and low-voltage directives apply: equipment must carry CE marking with a declaration of conformity and technical file.
  • EU animal-welfare and traceability rules govern handling, harvest and mortality management, which shapes mortality-removal, stunning and record-keeping equipment.
  • Food-contact and hygiene requirements (EU 852/853) apply to grading, ice, packing and chill-room equipment at the packing station.
  • Escape prevention and reporting obligations make certified nets, documented mooring analyses and inspection records part of the purchase, not an afterthought.
Startup sequence

How to start a fish or shrimp farm in Greece

  1. 1. Confirm the licensed site envelope

    Obtain the lease coordinates, permitted biomass and permitted structures for the site. These three numbers cap cage count, net volume and feed-barge capacity before any supplier is contacted.

  2. 2. Commission measured site data

    Current profile, significant wave height, depth and seabed type determine the exposure class. Suppliers cannot responsibly quote a mooring grid without this data, and buyers who skip it usually pay twice.

  3. 3. Fix species mix and production plan

    Seabass and seabream at different size targets change grading, harvest and feeding requirements even on identical cages.

  4. 4. Decide juvenile supply

    Buy juveniles from a Greek hatchery or build hatchery/nursery capacity. This single decision is usually the largest fork in the capital plan.

  5. 5. Build the RFQ package

    Combine site data, biomass ceiling and production plan into one specification covering cages, nets, moorings, feeding, monitoring, handling and harvest equipment so quotations are directly comparable.

  6. 6. Plan installation and service

    Book mooring installation vessels and divers against realistic weather windows, and put service response time, spares stock and Greek-language support in the contract rather than the sales conversation.

Regulatory requirements change — confirm current scope with the relevant authorities or a local agent before fixing your schedule.

Ports & logistics

Getting equipment into Greece

Most equipment reaches Greece either as containers through Piraeus and Thessaloniki, or as road freight from Italy and central Europe via the Adriatic ferry routes. Intra-EU road freight is often faster and simpler than sea freight for European-built cages, feeding systems and processing lines, while Asian-built components arrive containerised. The real schedule risk is the last leg — island transfer, crane and vessel availability and weather windows for mooring work.

Piraeus

Primary container gateway

Best global connectivity and the widest choice of customs brokers; onward road distribution to Evia, the Peloponnese and ferry links to the islands.

Thessaloniki

Northern gateway

Serves the northern Aegean mussel and finfish cluster and Balkan overland routes.

Patras / Igoumenitsa

Adriatic ro-ro gateways

Standard entry for road freight from Italy — the fastest route for European-built equipment.

Astakos

Industrial port near western farms

Useful for oversized items destined for the Ionian and western grow-out cluster.

Island ferry network

Final leg to Aegean sites

Cage collars, moorings and barges move by ferry or workboat; plan knock-down packing and confirm crane availability at the receiving island.

Regional clusters

Where aquaculture equipment is needed in Greece

Central Greece & Evia

Largest farming cluster

Dense concentration of seabass and seabream sites with established service, net-washing and mooring contractors; short road links to Athens for imported equipment.

Western Greece & the Ionian (Astakos, Preveza, Argolida)

Grow-out and packing hub

Sheltered gulfs with large grow-out sites and packing stations feeding chilled export trucks to Italy and central Europe.

Aegean islands (Chios, Leros, Kalymnos)

Exposed-site farming

Higher exposure class requirements, longer service response and more demanding logistics; knock-down packing and local assembly matter here.

Northern Greece (Thessaloniki, Chalkidiki, Thermaic Gulf)

Mussel and logistics cluster

Main mussel-farming area and a container gateway with road access to the Balkans.

Attica / Piraeus

Import gateway and engineering base

Primary container entry, customs brokerage, and where most engineering, procurement and group head-office decisions are made.

Lead times

Indicative delivery lead times

HDPE cage collars and nets8–16 weeks
European manufacture; add time when exposure class requires a site-specific engineering review.
Mooring grids, chain and anchors10–20 weeks
Driven by the mooring analysis and anchor supply; installation vessel booking is often the binding constraint.
Feed barges and feeding systems16–32 weeks
Barge hull plus feeding, sensor and control fit-out; commissioning support should be a separate quoted line.
Hatchery and water-treatment systems14–28 weeks
Engineered scope with tanks, live-feed units, UV/ozone and heat exchangers.
Ice, grading and packing lines10–22 weeks
Food-contact compliance documentation should be delivered with the equipment, not after.
Customs clearance and island transfer1–4 weeks
Intra-EU shipments clear quickly; the island leg and weather windows dominate the tail of the schedule.

Planning benchmarks only — confirm against supplier quotations for your scope.

Documentation & compliance

What buyers in Greece must document

CE marking and declaration of conformity
Required for machinery and electrical equipment placed on the EU market, with the technical file available on request.
Mooring analysis and certification
A site-specific mooring and cage analysis against measured current and wave data, signed by the supplier's engineer.
Net certification and traceability
Material specification, breaking-strength documentation and batch traceability for nets and predator protection.
Food-contact conformity
For ice, grading, packing and chill equipment — material declarations under EU food-contact regulations.
Electrical standard
400 V three-phase / 230 V single-phase at 50 Hz. Confirm motor, drive and control compatibility in the quotation.
Service and spares commitment
Named service partner in Greece or the Mediterranean, response time in writing, and a stocked critical-spares list.
Landed-cost drivers

What moves the delivered cost in Greece

  • Quote to the site, not to Piraeus: island ferry transfer, crane hire and diver services can move total landed cost materially.
  • Mooring installation is frequently under-budgeted — vessel day rates and weather standby should be priced explicitly.
  • Intra-EU purchases avoid import duty; VAT treatment and any reverse-charge mechanism should be confirmed with your accountant before ordering.
  • Feeding-control and biomass systems generally show the fastest payback because feed dominates operating cost.
  • Anti-fouling strategy (net coating versus in-situ washing) is a long-run operating decision, so compare it across the full cycle rather than on purchase price.
What buyers in Greece look for

Aquaculture machines for Greek sea bass and sea bream farms

Greek searches are about aquaculture machines and commercial fish farming equipment for Mediterranean sea bass and sea bream: sea cages and moorings, net changing and washing machines, feed blowers and barges, graders, fish pumps and harvest equipment, plus hatchery systems for fry. Buyers replacing worn machines usually want parts and service in Greece, not only the lowest price.

  • Cage-farm machines: net washers, feed blowers, graders, fish pumps
  • Hatchery and nursery systems for bass and bream fry
  • Check local service and spare parts before choosing a supplier

Greece market facts

Production
127,495 t worth €689 m in 2024 (down 10% in volume from 2023) · source
Main farmed species
Sea bream (57,920 t), sea bass (48,043 t), mussels (12,577 t) · source
Import duty from outside the EU (HS 8436.80)
1.7% EU common tariff · source
VAT
24% · source
Main import ports
Piraeus, Thessaloniki
Market trend
Sector plans to double marine fish output by 2030 · source

Typical equipment prices for Greece projects

EquipmentPublic price rangeSource
HDPE floating fish cage (small to mid)Common in GreeceUSD 2,000 – 10,000 per cageManufacturer price listings
Automatic pond feeder (40–120 kg hopper)Common in GreeceUSD 85 – 900 per unitManufacturer price listings
PSA oxygen generator for fish farmsCommon in GreeceUSD 5,000 – 40,000 by capacityManufacturer price listings
Paddlewheel aerator, 2 HPUSD 300 – 1,250 per unitFactory listing (USD 299) to US retail (USD 1,250)
Drum filter, 30–100 m³/hUSD 1,250 – 3,540Public drum filter price list
Commercial RAS, equipment + installationUSD 9,000 – 25,000 per tonne of yearly capacityRAStech capital cost study

Planning estimate only: public list prices, before shipping to Greece, import duty, installation and local taxes. Your quote depends on capacity and scope.

Sourcing equipment in Greece — how it works.

  1. 01

    Local + global match

    Suppliers serving Greece and regional manufacturers shortlisted.

  2. 02

    Qualification

    Scope, warranty and after-sales terms reviewed on available information; project references requested. Qualification is not certification or a performance guarantee.

  3. 03

    Logistics

    Shipping into Greece, customs and duties handled by the supplier or logistics partner where included in the quote; import clearance remains the buyer's responsibility.

  4. 04

    Installation

    Installation, commissioning, operator training and after-sales support are performed by the supplier or its EPC partner where included in the quote.

Equipment we source in Greece

Financing in Greece

Need financing for your project in Greece?

Qualified projects in Greece may be introduced to independent third-party equipment, turnkey or expansion financing providers. Approval and terms are set solely by the provider.

Check financing
Buyer guide

Fish Farming Suppliers in Greece: Aquaculture Procurement

Local and international suppliers can both serve projects in Greece. Before comparing them, put every quote on the same basis.

  1. 1.Write one specification first

    Species, target tonnes per year, system type, site, water source and budget. Quotes built on the same brief can be compared line by line; quotes built on different assumptions cannot.

  2. 2.Ask for the same delivery terms

    Request every price on the same Incoterms® 2020 rule (for example FOB or CIF, named port). Mixed terms hide freight, insurance and duty differences (ICC).

  3. 3.Separate equipment from design and installation

    Ask suppliers to price equipment, engineering, installation supervision, commissioning and training as separate lines, so missing scope is visible.

  4. 4.Check the technical basis

    For RAS, ask how flow, oxygen and biofilter capacity were sized from the feed load — the method in Timmons & Ebeling is a common reference.

  5. 5.Confirm certification needs early

    If your buyers require ASC or BAP, tell suppliers before design and check the applicable standard. FAO's certification guidelines provide a broader reference for environmental, social, food-safety and animal-health criteria; they do not certify a supplier or a project.

  6. 6.Compare total cost, not unit price

    Include spares, warranty terms, currency, payment milestones and lead time. The lowest equipment price is not always the lowest project cost.

How FishMatch Group handles aquaculture procurement

A specialist reviews your brief, asks for anything missing, then contacts relevant suppliers privately. Available proposals are organised in one comparison, line by line, with differences and exclusions identified. FishMatch Group is supplier-neutral: it does not manufacture equipment, build or operate farms, or lend. Supplier names, websites and contact details stay confidential. We do not guarantee a number of proposals, the lowest price or financing approval.

Open the RFQ form →

Planning a shrimp farm? Get a free cost estimate from your pond size, stocking density and harvest goals

Sources

Structured intake

Full RFQ intake for your aquaculture project

Human-reviewed infrastructure RFQs start at USD 250,000. Buyers pay nothing; sourcing is supplier-funded. Define species, capacity, system, measured water conditions, equipment scope, standards, destination, timing and budget. Supplier identities remain confidential. Smaller requests are saved separately and directed to free planning tools.

Your details are never published and never shared with a supplier under your name without approval.

FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As buyer or importer, you remain responsible for your own import permissions, local requirements and due diligence. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

Step 1 of 5

1. Contact

1. Contact

Your contact details stay private and let our team clarify the project before any supplier outreach.

Privacy: We use these details to review and answer this request. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

FAQ — Aquaculture equipment in Greece

A cage set and mooring grid engineered to the site's measured current and wave exposure, nets with predator and anti-fouling protection, net cleaning and handling equipment, a feed barge or shore-based blower system with feeding control, oxygen and temperature monitoring, mortality removal, work boats, and harvest handling with ice slurry feeding a grading and packing line.

By exposure class derived from measured significant wave height and current. Those measurements set collar dimensions, net depth and material, mooring line and anchor design, and the certification required. A cage suitable for a sheltered gulf will fail on an exposed island site, and the mooring analysis is the item buyers most often under-specify.

Piraeus for containerised equipment with the widest broker choice, Thessaloniki for northern Aegean projects, and Patras or Igoumenitsa for road freight arriving by ferry from Italy. Astakos is useful for oversized items serving the western Ionian cluster. Choose the gateway closest to the farming region to avoid double handling.

400 V three-phase and 230 V single-phase at 50 Hz, in line with EU practice. Equipment built for 60 Hz markets needs motor, drive and control confirmation before order; retrofitting on site is expensive and slow.

Indicatively: cages and nets 8–16 weeks, mooring systems 10–20 weeks, feed barges 16–32 weeks, hatchery and water treatment 14–28 weeks, and ice, grading and packing lines 10–22 weeks. Add one to four weeks for clearance and island transfer, plus weather-window allowance for mooring installation.

Yes, for machinery and electrical equipment placed on the EU market. Ask for the declaration of conformity and confirmation that the technical file is available. For ice, grading and packing equipment, also ask for food-contact material declarations under EU hygiene regulations.

Yes. Greek and Mediterranean hatchery projects are quoted as engineered packages: broodstock and larval tanks, rotifer and artemia live-feed units, recirculation skids, protein skimmers, UV and ozone disinfection, heat exchangers and control systems. Juvenile output target and water source determine the scope more than floor area does.

Ordering cages and moorings without measured site data. The second is pricing equipment to the port instead of to the site — ferry transfer, crane hire, diver services and installation weather standby are real budget lines on island projects.

No. FishMatch Group is an independent sourcing platform. We prepare your specification, run a confidential RFQ to project-matched suppliers serving Greece, and return comparable quotations landed to your site. Buyers pay nothing, and supplier identities stay confidential until you choose to engage.

Yes. Quotes are returned in one comparable format covering equipment scope, capacity assumptions, energy and labour requirements, Incoterm and freight to the site, installation, warranty, spare parts and payment terms, so a Greek supplier and an imported package can be judged on delivered cost of ownership rather than headline price.

Distributors and dealers active in Greece are usually regional agents for international manufacturers of aeration, pumping, feeding, filtration and monitoring equipment. FishMatch Group researches those companies from public information, then approaches the ones whose product range and service coverage match your project. We are not a distributor ourselves and do not sell equipment.

Commercial buyers in Greece normally buy directly from manufacturers or from their regional distributors rather than from retail outlets. You send one brief describing species, capacity and site conditions; we prepare a technical RFQ and run a confidential round with manufacturers, exporters and distributors that already ship to Europe.

Yes. Requests are put to manufacturers, wholesalers, exporters and turnkey contractors, selected by capability for your system type rather than by any commercial relationship. Quotes come back in a comparable format with scope, lead time and delivered cost to Greece stated the same way.

Submit one sourcing brief with your species, system and capacity. FishMatch Group matches it against manufacturers, exporters and distributors already serving Greece and Europe, then returns comparable quotes — you never have to contact suppliers one by one.

Cost depends on system type and scale rather than location: small pond or cage setups typically start in the tens of thousands of USD, while commercial RAS and turnkey farms run from several hundred thousand to multi-million USD. Landed cost in Greece also includes freight, duties, installation and commissioning — all of which are itemised in the quotes you receive.

Stock items and small equipment usually ship in 2–6 weeks. Engineered RAS, hatchery and processing lines are typically 8–20 weeks from order confirmation, plus 3–6 weeks of sea freight and customs clearance into Greece.

Yes. The manufacturers we work with export regularly to Europe and quote door-to-door where required, covering sea or air freight, customs documentation, on-site installation, commissioning and operator training in Greece.

We check company registration, export history into Europe, reference projects of comparable scale, certifications and after-sales capability before a supplier is matched to a Greece project. Supplier identities stay confidential until you decide to proceed.

There is no fixed minimum, but sourcing works best for projects above roughly USD 25,000. Smaller orders are usually matched with regional distributors serving Greece rather than factory-direct manufacturers.

Qualified projects in Greece may be eligible for equipment leasing, export credit, working capital or structured project finance from USD 250,000 upwards through our international financing partners. Financing is reviewed confidentially alongside your equipment quotes.

We prioritise suppliers with regional service coverage or a distributor presence in Europe, and spare-parts availability, warranty terms and remote support are compared as part of every quote package for Greece.

Nothing. Buyers in Greece pay no fee for sourcing, quote comparison or financing introductions — suppliers cover the fee only when a qualified opportunity is delivered.

Most complete briefs receive 2–3 matched supplier quotes once suppliers respond. Complex turnkey or RAS projects in Greece take longer because they require engineered scopes and layout drawings; timing depends on supplier response.

RAS and post-smolt systems, sea and lake cages, lined and earthen ponds, biofloc and shrimp systems, hatchery and nursery lines, feed handling, aeration and oxygenation, water treatment, cold chain and processing equipment are all sourced for projects in Greece and across Europe.

No. You submit a single brief and we run the outreach, technical clarification and price negotiation with matched manufacturers on your behalf. Supplier identities stay confidential until you decide which quote to progress for your Greece project.

Yes. Turnkey scopes covering process design, civil interface, equipment supply, installation, commissioning and operator training are quoted by EPC partners with delivery experience in Europe, so the Greece package arrives as one comparable price rather than a dozen separate line items.

Species, target annual tonnage, site water source and quality, available land or sea area, power availability and a target start date are enough to begin. Site drawings, permits and water analyses for Greece sharpen the engineered scope but are not required for the first round of quotes.

We match suppliers whose equipment, certification and documentation meet the standards enforced in Greece and Europe, and quotes include the technical files, CE or equivalent conformity documents and effluent or biosecurity specifications your permitting process is likely to request.

Every quote is returned in a comparable format: equipment scope, capacity assumptions, energy and labour requirements, Incoterm and freight to Greece, installation, warranty, spare parts and payment terms — so you compare total delivered cost of ownership instead of headline equipment price.

Explore aquaculture and RAS suppliers here for research and market discovery, or start with your project requirements so FishMatch can help structure the RFQ and identify relevant system providers for that specific production plan.

Directory — research

Browse categories, countries and technology types to understand the market and which system types exist. Nothing is requested and no supplier is contacted.

Project sourcing — RFQ

Define species, system, production target and site conditions, size the requirement with the planning tools, and build one structured RFQ. Manufacturer research follows the requirement.

  • FishMatch helps prepare aquaculture RFQs and source relevant suppliers.
  • Supplier and manufacturer listings are provided for independent research, transparency and reference. Listing does not constitute certification, endorsement, qualification for a specific project or automatic introduction.
  • Buyer follow-up and supplier selection are handled by FishMatch.

There is no instant or automated supplier match. Manufacturer research happens after the project requirement is clear and is reviewed by the FishMatch team before any supplier is approached.

Manufacturers can register in the free directory and keep their company details up to date. Being listed is a research and visibility surface — it does not create an automatic connection to buyers, and it does not replace the human sourcing process.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

Commercial project route

Is your project in Greece a fit?

FishMatch Group handles commercial B2B projects with a total budget of USD 250,000 or more — new farms, hatcheries, RAS, cages, processing or expansions. The buyer sends one brief; our team reviews and structures the RFQ, then approaches suitable suppliers on the buyer's behalf. Buyers are not put in direct contact with manufacturers at this stage. Smaller or idea-stage projects can start with the calculators below and send the RFQ once scope and budget are clearer.

Which inputs change the estimate and the RFQ?

Calculator results and supplier quotes both depend on: species and life stage, production target (tonnes per year or PL per cycle), water source and quality (temperature, salinity, flow), system design (pond, cage, RAS, hatchery, processing), site and access, energy supply and price, permits, and timeline.

Calculator figures are planning estimates based on stated assumptions — not engineering designs or supplier quotes. Growth, survival and output depend on project-specific biology and operating conditions and are never guaranteed. Formulas, assumptions and sources: calculator methodology.

2. Equipment & project sourcing

Send a structured RFQ. A person checks scope and budget before any supplier is approached.

Start the project RFQ

3. Financing (separate)

Financing is a separate track. FishMatch Group does not lend or guarantee financing.

Aquaculture financing

More on Greece

Each page answers a different stage of the same project — market, suppliers, feasibility and equipment.

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.