Back to the Tunisia market guide

Aquaculture market guide

Tunisia fish farm cost calculator

Estimate capex, feed and energy costs for a fish or shrimp farm in Tunisia, using local electricity and feed prices. Results are shown in local currency and USD.

Exchange rate used: 1 USD ≈ 3 TND

Indicative results

Equipment & installation capex
TND 5,737,500 · $1,912,500 – TND 8,925,000 · $2,975,000
Feed needed
475 t/year
Feed cost
TND 1,995,000 · $665,000/year
Energy cost
TND 522,000 · $174,000/year
Water cost (RAS make-up)
TND 750,000 · $250,000/year
VAT / GST on equipment (19%)
TND 1,090,125 · $363,375 – TND 1,695,750 · $565,250
RAS water volume
2,083 m³

Indicative planning estimates based on 2026 regional ranges and approximate exchange rates. Not a quote; site works, land, buildings and taxes vary.

Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.

Frequently asked questions

How much does a fish farm cost in Tunisia?

An indicative 250-tonne-per-year RAS in Tunisia costs roughly TND 5.7M (≈ $1.9M) – TND 8.9M (≈ $3M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.

Which fish and shrimp are farmed in Tunisia?

Commercial projects in Tunisia mainly focus on seabream, seabass.

This page in other languages

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.

Start a reviewed RFQ