Canada → Oman: new access for live and non-live fish and seafood

Sources read 25 October 2026 · CFIA announcement June 2026 · English

Oman has accepted two Canadian health certificates — CFIA/ACIA FA1059 for fish and crustaceans and FA1060 for bivalve molluscs, echinoderms, tunicates and marine gastropods — so live and non-live, wild and farmed Canadian fish and seafood for human consumption can now be exported to Oman (CFIA, June 2026). Genetically modified aquatic animals are excluded. This is country-level access: each supplier must be on CFIA's approved-for-export list, and FishMatch has not verified buyer demand for any Canadian product in Oman.

What is confirmed — and what is not

Confirmed access

Confirmed by CFIA

Oman accepted two Canadian health certificates covering live and non-live fish and seafood for human consumption.

Supplier eligibility

Check per supplier

The establishment must hold a Safe Food for Canadians licence for the activity, appear on CFIA's approved-for-export list and run an export control plan that shows Oman's requirements are met.

Buyer demand

Not verified

CFIA reports that Oman imported about $74 million of fish and seafood in 2025 (currency not stated; all origins). It is not a Canadian share and does not show demand for a product or buyer.

Eligible products (CFIA)

  • All live and non-live, wild and farmed fish and seafood for human consumption, including finfish, crustaceans, bivalve molluscs, echinoderms, tunicates and marine gastropods.

Not eligible or handled separately

  • Genetically modified aquatic animals.

[source] Eligibility depends on species, harvest area and form — confirm the exact product with CFIA before contracting.

Product-specific documents

Certificates by product for Canada to Oman
ProductCertificates listed by CFIA
Live and non-live fish and crustaceans (e.g. finfish, lobster, crab)Health certificate CFIA/ACIA FA1059
Live and non-live bivalve molluscs, echinoderms, tunicates and marine gastropods, including scallop adductor muscleHealth certificate CFIA/ACIA FA1060

Supplier eligibility checks

General guidance, not legal advice. Our team checks these documents for each supplier before any introduction.

  1. Check the supplier's establishment on CFIA's list of fish and seafood establishments approved for export, and its Safe Food for Canadians licence for the activity. [source]
  2. The exporter must know Oman's standards and keep an export control plan; customs may sample and test products. [source]
  3. Labelling: CFIA cites marking in line with Section I of Annex II to GSO 9/2013 (Labeling of Prepackaged Food Stuffs). Confirm packaging and labels with the importer before production. [source]
  4. The exporter is responsible for completing the certificate in a way Oman's Border Control Post will accept — agree the consignee and description fields with the importer. [source]

Temperature, handling and logistics checks

  1. Chilled product: Codex advises that fresh fish, fillets and shellfish to be chilled “should be held at a temperature as close as possible to 0 °C”. Put the target and the allowed deviation in the contract. [source]
  2. Frozen product: Codex treats quick freezing as complete only when the product reaches “–18 °C or colder” at the thermal centre, and transport of frozen product should maintain –18 °C or colder. Ask for freezing method (IQF or block), glaze percentage and net-weight basis. [source]
  3. Live bivalves: Codex advises that “in most cases, storage above 10 °C (50 °F) or below 2 °C (35 °F) should be avoided”, without direct contact with ice. For live lobster or crab, agree packing, survival standard and claim rules with the supplier. [source]
  4. Ask for continuous temperature records (reefer or data-logger download) from loading to delivery, and agree the receiving inspection and rejection criteria before the first shipment.

Logistics

  • Live and chilled product usually moves by air; frozen by reefer. State the arrival airport or port so offers are comparable.
  • Ask who completes customs and Border Control Post procedures in Oman and where product is cold-stored on arrival.
  • Confirm the certificate type (FA1059 or FA1060) for every line before booking — a mixed shipment may need both. [source]

No transit times or freight rates are given here; they depend on route and carrier and are quoted per request.

Reported market context

  • Oman imported about $74 million of fish and seafood in 2025, which CFIA describes as reflecting “strong consumer interest in imported fish and seafood” (currency not stated, all origins). [source]
  • FishMatch has no verified Omani buyer demand or price data for Canadian products. Treat demand as a hypothesis to test with real requests.

What to put in your request

Each of these is a field in the seafood request form, so offers from different suppliers can be compared line by line.

Species
Common and scientific name; farmed or wild.
Form
Live, chilled or frozen; whole, cooked, meat, fillet, adductor muscle; retail or food-service pack.
Size
Grade, count or weight per piece (e.g. lobster weight band).
Volume
Per shipment and frequency.
Origin
Canada, and the region if it matters.
Delivery window
First delivery and any seasonal peaks you plan for.
Destination
Oman, airport or port, and receiving cold store.
Documentation
FA1059 (fish, crustaceans) or FA1060 (bivalves, echinoderms, tunicates, gastropods); GSO 9/2013 labels.
Payment and finance
Payment terms preference (e.g. L/C, cash against documents) and any trade-finance need — optional, recorded for review only.

Trade lane readiness check: Canada → Oman

Tick what is already settled. Open items become notes in your request, so our team knows what still needs checking. Ticks stay in this browser.

Market access is official; exporter eligibility is checked per supplier and shipment; buyer demand exists only as a real request.

0 of 21 settled

Product, species, form and size
Health certificates
Establishment approval
Traceability
Packaging and labelling
Temperature and handling
Logistics
Quantity, timing and payment

The form opens with the origin, destination and your open items filled in. Nothing is sent until you submit.

How introductions work

  1. You send a buyer request (free).
  2. We qualify it: complete specification, destination access confirmed, programme of USD 250,000 or more.
  3. We check supplier eligibility documents for the exact product and lane.
  4. You receive a structured, anonymous comparison of eligible offers.
  5. Introductions happen only after qualification and with both sides' agreement. Contact details are never shown before that, and no deal is guaranteed.

Request a private sourcing review

Free for buyers, for annual or seasonal programmes of USD 250,000 or more. The form opens with Canada and Oman filled in; you add species, form, size, volume, delivery window and documents. You can also state payment terms and any payment or trade-finance need. Our team qualifies every request and checks supplier eligibility before any structured introduction; contact details stay private until then. No supply, price, eligibility or clearance guarantees.

Canadian producer or exporter? Apply as a producer — applications are reviewed privately and never listed publicly.

Questions buyers ask

Can Canadian seafood be exported to Oman?
Yes. CFIA reports that Oman accepted two Canadian health certificates, allowing live and non-live, wild and farmed fish and seafood for human consumption. Genetically modified aquatic animals are not eligible.
Which certificate is used for Canadian lobster or scallops to Oman?
CFIA lists FA1059 for live and non-live fish and crustaceans such as lobster, and FA1060 for bivalve molluscs, echinoderms, tunicates and marine gastropods, including the scallop adductor muscle.
Does the Canadian plant need approval to export to Oman?
CFIA requires a Safe Food for Canadians licence for the activity and a listing on CFIA's fish and seafood establishments approved for export. CFIA does not mention a separate Omani establishment list; confirm with the importer.
Which labelling rule applies in Oman?
CFIA points to Section I of Annex II to GSO 9/2013 on labelling prepackaged foods and advises confirming packaging, labelling and marking with the importer.
Does FishMatch guarantee Canadian supply or Omani clearance?
No. FishMatch does not guarantee supply, prices or clearance and never shares direct supplier contacts before review. FishMatch reviews programmes of USD 250,000 or more per year or season; the buyer service is free.

Sources

Rules change. Confirm current requirements with CFIA, the destination authority and your customs broker before each shipment.