Aquaculture market guide
Guatemala fish farm cost calculator
Estimate capex, feed and energy costs for a fish or shrimp farm in Guatemala, using local electricity and feed prices. Results are shown in local currency and USD.
Exchange rate used: 1 USD ≈ 7.7 GTQ
Indicative results
- Equipment & installation capex
- GTQ 2,772,000 · $360,000 – GTQ 6,160,000 · $800,000
- Feed needed
- 400 t/year
- Feed cost
- GTQ 4,004,000 · $520,000/year
- Energy cost
- GTQ 436,590 · $56,700/year
- VAT / GST on equipment (12%)
- GTQ 332,640 · $43,200 – GTQ 739,200 · $96,000
Indicative planning estimates based on 2026 regional ranges and approximate exchange rates. Not a quote; site works, land, buildings and taxes vary.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Guatemala?
An indicative 250-tonne-per-year RAS in Guatemala costs roughly GTQ 13.9M (≈ $1.8M) – GTQ 21.6M (≈ $2.8M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Guatemala?
Commercial projects in Guatemala mainly focus on tilapia, shrimp.
This page in other languages
Before you request quotes
Costs & budgeting
How much does a commercial fish farm cost to build?
Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.
What drives the price differences between aquaculture equipment quotes?
Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.
What operating costs should a business plan include?
Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.