Aquaculture projects in Taiwan: registration, shrimp buyers and equipment
In Taiwan, fish-farm registration under the Fisheries Act is handled by local governments — Kaohsiung, for example, registers outdoor ponds and indoor facilities and requires lawful land use plus separate building and water compliance. Aquaculture drugs must be approved veterinary medicines used as labelled. Domestic whiteleg shrimp production (9,882 t in 2021) was well below imports (24,666 t), which is why protected and recirculating shrimp farms are being developed.
TWD · New Taiwan dollar
t/year · kg · ha · m³ · m³/h · °C · kW · kWh
Approvals: local registration, land, water and drugs
- Fish-farm registration is set by local rules under the Fisheries Act rather than one uniform national pond licence. Kaohsiung's ordinance, for example, requires registration with its Marine Bureau for outdoor ponds and indoor facilities, lawful land use and separate compliance with building and water legislation, and requires disease outbreaks or serious abnormalities to be reported and handled under animal-disease law. Check the rules of the city or county where your site is.
- Groundwater use is restricted in land-subsidence areas, and aquaculture production zones are designated by local governments; confirm the site's zoning and water source with the local authority before design. The national texts could not be opened for this guide, so they are not cited.
- The Animal and Plant Health Inspection Agency requires approved veterinary medicines, correct labelled use and withdrawal periods; unapproved drugs and direct use of bulk pharmaceutical ingredients are prohibited.
Shrimp supply and who buys it
- Fisheries Research Institute reporting gives 2021 whiteleg shrimp production of 9,882 t against imports of 24,666 t, and points to disease and climate as constraints and to protected, recirculating production as the response. These are 2021 figures, not current estimates.
- Taiwan's wider aquaculture includes milkfish, tilapia, grouper, clams, eel and oysters; current species tonnages and buyer channels by species could not be verified from the Fisheries Statistical Yearbook for this guide, so none are given.
Equipment for protected and recirculating shrimp farms
- Protected shrimp facilities rely on recirculation and water treatment; projects typically specify tanks or lined raceways, mechanical filtration, biofilters, aeration or oxygenation, heating or cooling and automated feeding and monitoring. Size them from the planned biomass and feed load.
- Specify typhoon and power-outage resilience, backup power, the quote currency and who handles installation and commissioning.
Taiwan project brief checklist
For the Taiwan site, include administrative area and coordinates, legal applicant and site rights, species and life stage, intended annual harvest and peak biomass, water-use and approval status, measured seasonal water data, intake and discharge layout, power and backup, delivery point, quote currency and budget. Attach the local fish-farm registration status, land-use and zoning confirmation, the water source and any groundwater restrictions, and the planned veterinary-medicine protocol. Mark every unconfirmed assumption. Separate studies and applications, civil works, equipment, installation and acceptance responsibilities. FishMatch reviews commercial projects of USD 250,000 or more by hand; smaller projects can still use the free planning tools.
Request private project reviewCalculate from your measured site inputs
Taiwan buyer questions
Which approval should I resolve first in Taiwan?
Confirm with the city or county government that the land can lawfully be used for aquaculture and that the water source is allowed, then register the fish farm under the local rules made under the Fisheries Act.
Is there demand for farmed shrimp in Taiwan?
Domestic whiteleg shrimp production was 9,882 t against 24,666 t of imports in 2021, according to the Fisheries Research Institute. That gap is the context for protected and recirculating shrimp farms; it is not a commitment from any buyer.
Will FishMatch expose supplier contacts or forward the brief automatically?
No. Project requests are private and human-reviewed; supplier identities and contacts remain confidential and there is no automatic supplier routing. Procurement assistance is for commercial projects of USD 250,000 or more; the planning tools remain free.
Institutional, legal and statistical references
- Kaohsiung City — Aquaculture registration ordinance
- Animal and Plant Health Inspection Agency — Aquaculture drug-use guidance
- Ministry of Agriculture knowledge base — Fisheries Research Institute report on whiteleg shrimp
Prepared 30 October 2026 from the linked institutional, legal and statistical references, each opened on that date. This is editorial planning guidance, not a legal opinion, local engineering design, approval or independent expert sign-off. Procedures and figures can change; confirm the current rules and site-specific applicability with the competent authority before committing capital. No local tariffs, project prices, production gains or buyer commitments are asserted; trade and production figures describe the country, not demand for a specific project.