Aquaculture market guide
Aquaculture in Saudi Arabia: suppliers, costs and project planning
FishMatch Group helps commercial buyers in Saudi Arabia source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are shrimp, barramundi, seabream, tilapia; typical water temperatures are 20–34 °C and industrial electricity costs about USD 0.07 per kWh.
Saudi Arabia targets a major expansion of aquaculture under Vision 2030, with Red Sea shrimp ponds, marine cages and freshwater RAS in the interior.
Key planning facts
- Main species
- shrimp, barramundi, seabream, tilapia
- Common systems
- Ponds, Cages, RAS (recirculating)
- Water temperature
- 20–34 °C
- Industrial electricity
- USD 0.07 / kWh
- Water cost
- ≈ USD 2.40 / m³
- Compound feed
- ≈ SAR 5 (≈ $1) / kg
- VAT / GST on equipment
- 15%
- Currency
- SAR (≈ 3.75 / USD)
- Licensing authority
- Ministry of Environment, Water and Agriculture (MEWA)
- Main import ports
- Jeddah, Dammam and King Abdullah Port
What to check before requesting quotes in Saudi Arabia
- Confirm your water source and year-round temperature (20–34 °C) for shrimp.
- Budget energy carefully: at about USD 0.07/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with Ministry of Environment, Water and Agriculture (MEWA).
- Plan equipment logistics and lead times through Jeddah, Dammam and King Abdullah Port.
- Check water rights or tariffs: municipal water costs about USD 2.40 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 15% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Saudi Arabia?
An indicative 250-tonne-per-year RAS in Saudi Arabia costs roughly SAR 8.9M (≈ $2.4M) – SAR 13.8M (≈ $3.7M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Saudi Arabia?
Commercial projects in Saudi Arabia mainly focus on shrimp, barramundi, seabream, tilapia.
Who licenses aquaculture in Saudi Arabia?
Licensing and environmental approval usually involve Ministry of Environment, Water and Agriculture (MEWA). Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We review your project, contact suitable suppliers on your behalf and present their responses only through FishMatch; buyers do not contact suppliers directly.
This page in other languages
Other aquaculture markets
- Mexico
- Brazil
- Chile
- Ecuador
- Peru
- Spain
- Greece
- Norway
- United Kingdom
- Türkiye
- Egypt
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Colombia
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Belgium
- Switzerland
- Cyprus
- Morocco
- United Arab Emirates
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Indonesia
- Thailand
- Philippines
- Malaysia
Short answer
How do you prepare a reviewed RFQ for Saudi Arabia?
Submit a private request for Saudi Arabia with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer