Aquaculture tanks and water recirculation equipment
← Markets

Aquaculture projects in France: approvals and procurement

Start with species, annual capacity, site, water resource and production goals. FishMatch Group reviews projects of USD 250,000+, structures the RFQ, coordinates appropriate supplier outreach and compares responses without releasing supplier contacts.

EUR · euro (€)

t/year · kg · ha · m³ · m³/h · °C · kWh

Freshwater, marine and site-use approvals

  • For freshwater fish farming, confirm ICPE classification 2130 with the competent services: it covers capacity above 20 t/year, with the extensive-pond exclusion described in the classification. Below that threshold does not mean exemption from every obligation.
  • For seawater fish farming, classification 2130 requires authorisation above 20 t/year and declaration above 5 t/year up to and including 20 t/year. Confirm classification and site-specific requirements.
  • Review water abstraction and discharge under water rules (IOTA), planning permission and applicable animal-health requirements separately.
  • For marine farming, check maritime public-domain occupation rights and local procedures with the competent state services. Land-based facilities and sea cages need different site reviews.

EUR proposals and comparable units

  • Request EUR prices with net amounts, applicable taxes and payable totals separated. Confirm VAT and import treatment with a tax adviser.
  • Separate civil works, equipment, connections, effluent treatment, commissioning, training and maintenance. Compare consumption under the same operating conditions.
  • State harvest in t/year, peak biomass in kg, water volumes in m³ and flow in m³/h. Specify fresh or salt water and the design temperature.

French specification terminology

  • Pisciculture means finfish farming; conchyliculture means shellfish farming; cultures marines refers to marine farming. Do not apply finfish approvals automatically to shellfish scope.
  • Define circuit ouvert (flow-through), système aquacole recirculé (RAS), écloserie (hatchery), grossissement (grow-out), IC/FCR and dissolved oxygen in the specification.
  • For flow-through trout, compare available flow and discharge treatment; for RAS, thermal balance, oxygenation, biofiltration and backup power.

RFQ preparation

Attach municipality, species, stage, annual tonnage, site plan, water analyses, power, regulatory classification to confirm, budget, currency and timeline. Assign studies, applications and acceptance tests explicitly.

Request project review

Shrimp project? Use the France shrimp farm request page →

Shrimp project? Open the request form with shrimp preselected →

Planning tools

Buyer questions

Does RAS remove water-related obligations?

No. Water abstraction, discharge, sludge, buildings and animal-health requirements still need site-specific review.

Will I receive manufacturer contacts?

No. FishMatch coordinates outreach and comparable responses; supplier identities and contacts remain private.

Official references

Planning guidance, not legal advice or an approval. Confirm requirements with the competent services before committing capital.

Short answer

How do you prepare a reviewed RFQ for France?

Submit a private request for France with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer