Aquaculture market guide
Aquaculture in Egypt: suppliers, costs and project planning
FishMatch Group helps commercial buyers in Egypt source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are tilapia, carp, shrimp, seabass; typical water temperatures are 16–30 °C and industrial electricity costs about USD 0.04 per kWh.
Egypt is Africa's largest aquaculture producer, dominated by tilapia ponds in the Nile Delta; national mega-projects are adding intensive marine and shrimp capacity.
Key planning facts
- Main species
- tilapia, carp, shrimp, seabass
- Common systems
- Ponds, RAS (recirculating), Cages
- Water temperature
- 16–30 °C
- Industrial electricity
- USD 0.04 / kWh
- Water cost
- ≈ USD 0.40 / m³
- Compound feed
- ≈ EGP 49 (≈ $1) / kg
- VAT / GST on equipment
- 14%
- Currency
- EGP (≈ 49 / USD)
- Licensing authority
- General Authority for Fish Resources Development (GAFRD)
- Main import ports
- Alexandria, Damietta and Port Said
What to check before requesting quotes in Egypt
- Confirm your water source and year-round temperature (16–30 °C) for tilapia.
- Budget energy carefully: at about USD 0.04/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with General Authority for Fish Resources Development (GAFRD).
- Plan equipment logistics and lead times through Alexandria, Damietta and Port Said.
- Check water rights or tariffs: municipal water costs about USD 0.40 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 14% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Egypt?
An indicative 250-tonne-per-year RAS in Egypt costs roughly EGP 82.7M (≈ $1.7M) – EGP 128.6M (≈ $2.6M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Egypt?
Commercial projects in Egypt mainly focus on tilapia, carp, shrimp, seabass.
Who licenses aquaculture in Egypt?
Licensing and environmental approval usually involve General Authority for Fish Resources Development (GAFRD). Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We review your project, contact suitable suppliers on your behalf and present their responses only through FishMatch; buyers do not contact suppliers directly.
This page in other languages
Other aquaculture markets
- Mexico
- Brazil
- Chile
- Ecuador
- Peru
- Spain
- Greece
- Norway
- United Kingdom
- Türkiye
- Saudi Arabia
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Colombia
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Belgium
- Switzerland
- Cyprus
- Morocco
- United Arab Emirates
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Indonesia
- Thailand
- Philippines
- Malaysia
Short answer
How do you prepare a reviewed RFQ for Egypt?
Submit a private request for Egypt with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer