Aquaculture projects in Paraguay: MADES licensing and farm planning

A Paraguayan project should start with the department, waterbody or site, target species (commonly pacu, tilapia or sorubim catfish) and whether it is a pond, tank or cage operation on a closed, semi-open or natural water body. Confirm the current Dirección de Pesca y Acuicultura requirements under Law No. 3,556/08 and any environmental licence that applies to the specific site before ordering infrastructure. Compare systems against measured site water and power data, not an assumed national production figure.

PYG · Paraguayan guaraní

t/year · kg · ha · m³ · m³/h · °C · kW · kWh

Fisheries law and the environmental licence route

  • Paraguay's Law No. 3,556/08 de Pesca y Acuicultura regulates fishing, aquaculture and related activities in public and private water bodies and tasks the State with setting responsible-practice standards and protecting fish biodiversity. The Dirección de Pesca y Acuicultura of the Ministerio del Ambiente y Desarrollo Sostenible (MADES) is the office that administers and regulates aquaculture production under this law; confirm the current application route and responsible regional office for the proposed site.
  • For the farming of non-native or exotic species in closed or semi-open water bodies, Law No. 7,618/2025 establishes a specific environmental-licence regime administered by MADES through an Environmental Impact Declaration. Confirm whether the species and system proposed fall under this regime and what study or declaration it currently requires before committing to a design.

Pond and cage evidence for Paraguayan species

  • For earthen-pond culture of pacu, tilapia or sorubim, provide dry-season water availability, intake/drainage elevation, soil data and species/stocking documentation; separate hatchery, nursery and grow-out scope rather than a single generic pond specification.
  • For cage or pen culture in a river, stream or reservoir, provide coordinates, depth, seasonal flow and water-quality measurements, access and mooring details, and confirm which water-use and environmental conditions the Dirección de Pesca y Acuicultura or MADES attaches to that specific water body; do not infer stocking density from cage volume alone.
  • Confirm biosecurity and animal-health requirements with SENACSA for any stock movement, and treat tilapia or other introduced species as requiring the exotic-species evidence described above rather than assuming blanket approval.

Equipment delivery to an inland Paraguayan farm

  • Paraguay is landlocked but served by river ports on the Paraguay and Paraná rivers; request delivery to the actual farm, including the agreed river or overland route, unloading, access and a spare-parts plan. A river-port price is not an installed-farm price.
  • Confirm import duties, customs procedure and any applicable transit obligations independently with a licensed customs broker; no tariff, price or production figure is asserted here. Compare aeration, pumping and feed-handling equipment as separate line items against the project's measured biomass and water parameters.

Paraguay project brief checklist

For the Paraguay site, include the department and coordinates, legal applicant and land/water-use rights, species and life stage, intended annual harvest and peak biomass, Dirección de Pesca y Acuicultura registration status, MADES environmental-licence status (including Law 7,618/2025 if an exotic species is proposed), measured seasonal water data, intake/discharge layout, power and backup, access/delivery route, quote currency and budget. Attach the country-specific documents described above and mark every unconfirmed assumption. Separate studies/applications, civil works, equipment, installation and acceptance responsibilities. FishMatch reviews commercial projects of USD 250,000 or more by hand; smaller projects can still use the free planning tools.

Request private project review

Calculate from your measured site inputs

Paraguay buyer questions

Which local issue should I resolve first in Paraguay?

Confirm the registration route with the Dirección de Pesca y Acuicultura of MADES under Law No. 3,556/08, and whether the proposed species and system require the environmental licence regime under Law No. 7,618/2025 for exotic species in closed or semi-open water bodies.

Does a recirculating system remove site and water requirements?

No. Confirm site use, water abstraction, discharge, animal health and the applicable environmental procedure separately. The designer must use the actual species, water resource and permit conditions.

Will FishMatch expose supplier contacts or forward the brief automatically?

No. Project requests are private and human-reviewed; supplier identities and contacts remain confidential and there is no automatic supplier routing. Procurement assistance is for commercial projects of USD 250,000 or more; the planning tools remain free.

Institutional and legal references

Prepared 16 October 2026 from the linked institutional and legal references. This is editorial planning guidance, not a legal opinion, local engineering design, approval or independent expert sign-off. Laws and administrative procedures can change; confirm the consolidated rules and site-specific applicability before committing capital. No verified local tariffs, project prices, production gains or market-demand measurements are asserted.

Short answer

What is the fastest way to get quotes for Paraguay?

Submit one structured request for Paraguay. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
What is the fastest way to get quotes for Paraguay?

Submit one structured request for Paraguay. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How does FishMatch Group source suppliers for this requirement?

You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.

Do buyers see supplier names during the sourcing process?

No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.