Aquaculture market guide
Cyprus fish farm cost calculator
Estimate capex, feed and energy costs for a fish or shrimp farm in Cyprus, using local electricity and feed prices. Results are shown in local currency and USD.
Exchange rate used: 1 USD ≈ 0.92 EUR
Indicative results
- Equipment & installation capex
- €661,250 · $718,750 – €1,454,750 · $1,581,250
- Feed needed
- 450 t/year
- Feed cost
- €703,800 · $765,000/year
- Energy cost
- €21,183 · $23,025/year
- VAT / GST on equipment (19%)
- €125,638 · $136,563 – €276,402 · $300,437
Indicative planning estimates based on 2026 regional ranges and approximate exchange rates. Not a quote; site works, land, buildings and taxes vary.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Country farm-cost scenarios: how it works
- CAPEX range (USD) = annual metric tonnes × system coefficients (USD/t annual capacity) × country cost factor. VAT illustration = CAPEX × profile VAT %.
- Annual feed tonnes = annual production × species FCR. Feed, energy and water costs multiply annual output or feed by the corresponding system and country coefficients. The local currency display multiplies USD by the stored profile FX.
- RAS volume proxy = annual production kg ÷ 120. This is not density sizing from peak standing biomass.
- Units
- Metric t/year, kg, kWh, m³, USD and displayed local currency.
- Assumptions
- Country values and FX are preset planning coefficients; the model clamps annual production to 1–20,000 t. Non-RAS water purchases are set to zero in the model; this does not mean no water is needed.
- Worked example (hypothetical)
- For 120 t/year of RAS production the volume proxy is 120,000 ÷ 120 = 1,000 m³. This illustrates the calculation only, not the volume a farm should build.
- Limitations
- Not a live tariff, construction estimate or full OPEX budget. Replace profile assumptions with dated site evidence and supplier quotes; verify actual VAT and water rights independently.
Frequently asked questions
How much does a fish farm cost in Cyprus?
An indicative 250-tonne-per-year RAS in Cyprus costs roughly €2.4M (≈ $2.6M) – €3.7M (≈ $4.0M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Cyprus?
Commercial projects in Cyprus mainly focus on seabass, seabream.
This page in other languages
Short answer
How do you prepare a reviewed RFQ for Cyprus?
Submit a private request for Cyprus with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer
Before you request quotes
Costs & budgeting
How much does a commercial fish farm cost to build?
Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.
What drives the price differences between aquaculture equipment quotes?
Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.
What operating costs should a business plan include?
Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.