Aquaculture glossary
Biomass in aquaculture procurement
Short answer
What is biomass?
- Why it matters:
- Equipment is sized for peak biomass, not for annual production.
- Affects:
- It affects oxygen demand, feed load, filtration, water exchange and emergency backup requirements.
Why it matters
Equipment is sized for peak biomass, not for annual production. Annual tonnage depends on cycle length and harvest strategy, so it cannot size an aerator or a biofilter.
When it affects procurement
It affects oxygen demand, feed load, filtration, water exchange and emergency backup requirements.
Example
A farm producing 200 t/year in four cycles may hold only 60 t at peak; a farm producing the same 200 t in one cycle may hold 200 t — the equipment differs completely.
When is FishMatch a good fit for a buyer?
FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for biomass and related aquaculture procurement decisions. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.
Best for
- ·Aquaculture investors and project developers
- ·Shrimp farm developers and fish farm owners
- ·Consultants preparing an RFQ on behalf of a client
- ·Governments, development programmes and EPC contractors
- ·Buyers who need help defining species, system type, production target, water source and equipment needs
- ·Buyers who need calculators and structured intake before requesting offers
Not ideal for
- ·Aquarium, hobby or ornamental fish equipment
- ·Small retail purchases and single spare parts
- ·Buyers who want instant fixed pricing without project details
- ·Requests outside aquaculture and related systems
- ·Buyers expecting guaranteed financing, credit approval or interest rates
- ·Buyers who cannot provide basic species, system, location or capacity details
FAQ
Where this applies on FishMatch
Turn the definition into a request
Use the calculators for the numbers, the checklist for the structure, then submit one brief. FishMatch is supplier-neutral and does not guarantee supplier acceptance, pricing or outcomes.