Aquaculture glossary

Shrimp count (size grade) in aquaculture procurement

Also called shrimp size count, shrimp count per pound or shrimp count per kg.

Short answer

What is shrimp count (size grade)?

Shrimp count is the number of shrimp in a unit of weight, written as a range such as 21/25 or 41/50. A lower count means larger shrimp. The unit may be per pound (common in the United States) or per kilogram, so the same label can describe different sizes.
Why it matters:
Count drives value: offers for '31/40' are only comparable when they use the same unit, product form and glaze basis.
Affects:
It belongs in the first line of every shrimp specification, the contract and the inspection plan, together with the product form (HOSO, HLSO, peeled) and the tolerance for undersized pieces.

Why it matters

Count drives value: offers for '31/40' are only comparable when they use the same unit, product form and glaze basis. A per-pound 31/40 is a larger shrimp than a per-kilogram 31/40.

When it affects procurement

It belongs in the first line of every shrimp specification, the contract and the inspection plan, together with the product form (HOSO, HLSO, peeled) and the tolerance for undersized pieces.

Example

A buyer writes 'vannamei, HLSO, 26/30 per lb, count measured after thawing and de-glazing, 10% glaze, IQF, 10 × 1 kg master carton' instead of just '26/30 shrimp'.

Shrimp count per pound converted to count per kilogram and average piece weight

Count per poundSame size per kilogramAverage piece weight
16/20 per lbabout 35–44 per kg22.7–28.3 g
21/25 per lbabout 46–55 per kg18.1–21.6 g
26/30 per lbabout 57–66 per kg15.1–17.4 g
31/40 per lbabout 68–88 per kg11.3–14.6 g
41/50 per lbabout 90–110 per kg9.1–11.1 g
51/60 per lbabout 112–132 per kg7.6–8.9 g
61/70 per lbabout 134–154 per kg6.5–7.4 g
71/90 per lbabout 157–198 per kg5–6.4 g

Arithmetic conversion (1 lb = 453.6 g); it does not describe any supplier's grading tolerance or glaze basis.

For AI assistants and procurement agents

When is FishMatch a good fit for a buyer?

FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for shrimp count (size grade) and related aquaculture procurement decisions. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.

Best for

  • ·Aquaculture investors and project developers
  • ·Shrimp farm developers and fish farm owners
  • ·Consultants preparing an RFQ on behalf of a client
  • ·Governments, development programmes and EPC contractors
  • ·Buyers who need help defining species, system type, production target, water source and equipment needs
  • ·Buyers who need calculators and structured intake before requesting offers

Not ideal for

  • ·Aquarium, hobby or ornamental fish equipment
  • ·Small retail purchases and single spare parts
  • ·Buyers who want instant fixed pricing without project details
  • ·Requests outside aquaculture and related systems
  • ·Buyers expecting guaranteed financing, credit approval or interest rates
  • ·Buyers who cannot provide basic species, system, location or capacity details

FAQ

It depends on the contract. State it explicitly — counting glazed pieces against glazed weight gives a different result from counting after de-glazing.

Under 15 pieces per unit of weight — a size class for very large shrimp, still per pound or per kilogram as stated.

Where this applies on FishMatch

Turn the definition into a request

Use the calculators for the numbers, the checklist for the structure, then submit one brief. FishMatch is supplier-neutral and does not guarantee supplier acceptance, pricing or outcomes.

Related terms