Seafood import readiness: health certificates, cold chain and traceability by country

Short answer: before a seafood order ships, confirm that the origin country and the named plant are eligible for the destination, that the right official certificate and pre-arrival notice are ready, that the cold chain is specified, and that every lot is traceable. The rules differ by market: EU, United States, Great Britain, Japan and China are summarised below with links to each authority.

Prepared by the FishMatch Group editorial team · official pages last checked 21 October 2026 · general orientation, not legal advice.

Five readiness checks

Each check separates the official requirement from FishMatch's commercial advice.

1. Eligibility: country and plant

Official requirement

  • EU: origin country authorised and establishment on the EU list.
  • China: producer registered with GACC.
  • US: no approved-plant list; importer verifies supplier HACCP compliance.

Commercial advice

  • Ask for the establishment or registration number in the first offer and check it against the official list yourself before paying a deposit.

2. Product definition and HS code

Official requirement

  • Classification decides which rules, certificates and duties apply — confirmed by customs, not by the seller.

Commercial advice

  • Write species (scientific name), farmed or wild-caught, form, count or size, glaze and additives on one specification sheet and attach it to the contract.

3. Certificates and documents

Official requirement

  • EU and Great Britain (medium/high risk): official health certificate signed by the exporting country's authority.
  • EU: catch certificate for wild-caught products only.
  • US: FDA Prior Notice before arrival; NOAA SIMP records for shrimp.
  • Japan: import notification by the importer.

Commercial advice

  • Match names, lot codes, establishment numbers and weights across invoice, packing list, certificate and carton labels — mismatches are a common reason for holds.

4. Cold chain

Official requirement

  • EU: frozen fishery products at not more than −18 °C in all parts; fresh products at the temperature of melting ice.

Commercial advice

  • Specify set-point and logger requirements in the contract, ask for loading photos and temperature records, and define who bears the risk at each handover (Incoterms).

5. Traceability

Official requirement

  • EU: one step back, one step forward.
  • US: shrimp in NOAA SIMP; crustaceans and finfish on FDA's Food Traceability List (enforcement not before 20 July 2028).
  • China: registration number on inner and outer packaging.

Commercial advice

  • Require lot-level records from farm or vessel to carton so a single lot can be isolated if a test fails.

Requirements by destination

European Union

Authority: European Commission (DG SANTE) and the border control post of the member state of entry · checked 21 October 2026

Eligibility
The exporting country must be authorised for fishery products, and the producing establishment (farm-to-plant chain, processing plant, freezer or factory vessel) must be on the EU list of authorised non-EU establishments.
Before arrival
Pre-notify the consignment at the EU border control post with a Common Health Entry Document (CHED-P) in TRACES; documentary, identity and physical checks follow.
Certificates
The official health certificate model for the product, signed by the exporting country's competent authority. A catch certificate under the IUU Regulation is needed for wild-caught fishery products; aquaculture products obtained from fry or larvae are outside its scope.
Traceability
Traceability one step back and one step forward for food business operators; establishment approval numbers must match across certificate, labels and documents.
Cold chain
Frozen fishery products must be kept at not more than −18 °C in all parts of the product; fresh products at a temperature approaching that of melting ice (Regulation 853/2004, Annex III, Section VIII, Chapter VII).

Official pages: EU entry conditions (European Commission) · Authorised non-EU establishments · TRACES · IUU Regulation FAQ (scope incl. aquaculture exclusion), May 2023 · Regulation (EC) 853/2004 — EUR-Lex

United States

Authority: US Food and Drug Administration (FDA); NOAA Fisheries for the Seafood Import Monitoring Program · checked 21 October 2026

Eligibility
There is no EU-style list of approved foreign plants. Foreign facilities that process food for US consumption must register with FDA, and processors must meet FDA seafood HACCP (21 CFR Part 123), and importers must take affirmative steps to verify that their suppliers comply.
Before arrival
FDA Prior Notice must be submitted and confirmed before arrival: at least 2 hours by road, 4 hours by rail or air, 8 hours by water (21 CFR 1.279).
Certificates
The rules linked here do not set one per-consignment health certificate for all seafood; ask your customs broker whether your product or buyer requires one.
Traceability
Shrimp is covered by NOAA's Seafood Import Monitoring Program (harvest-to-entry reporting and recordkeeping). Crustaceans and finfish are on FDA's Food Traceability List; Congress directed FDA not to enforce the Food Traceability Rule before 20 July 2028.

Official pages: 21 CFR Part 123 — Fish and fishery products (eCFR) · 21 CFR Part 1, Subpart H — Food facility registration (eCFR) · 21 CFR 1.279 — Prior Notice timing (eCFR) · NOAA Seafood Import Monitoring Program · FDA Food Traceability Rule (compliance date) · FDA Food Traceability List

Great Britain (England, Scotland, Wales)

Authority: Defra / Animal and Plant Health Agency, with Port Health Authorities · checked 21 October 2026

Eligibility
Imports are assigned a high, medium or low risk category under the Border Target Operating Model (BTOM); the category sets which sanitary rules and border checks apply.
Before arrival
Submit an import notification in IPAFFS before the goods arrive.
Certificates
A health certificate is uploaded to IPAFFS for medium- and high-risk products; low-risk products do not need one. IUU catch documentation is separate and applies regardless of risk category.
Traceability
IUU document details are entered in IPAFFS where applicable; follow the Food Standards Agency guidance on identification marking.

Official pages: Importing or moving fish to the UK (GOV.UK) · IPAFFS (GOV.UK) · Importing fishery products or bivalve molluscs (Food Standards Agency)

Japan

Authority: Ministry of Health, Labour and Welfare (MHLW) quarantine stations · checked 21 October 2026

Eligibility
Imported food must comply with the Food Sanitation Act; inspectors review documents and decide whether the consignment needs testing.
Before arrival
The importer submits an import notification (Food Sanitation Act, Article 27) to the quarantine station responsible for the port of clearance.
Certificates
Whether an official certificate is needed depends on the product and origin; confirm with the quarantine station before shipping.
Traceability
Keep lot-level records that match the notification; inspectors may sample for residues and additives.

Official pages: Import Procedure under Food Sanitation Act (MHLW) · Import notifications — Japan (FAO GLOBEFISH)

China

Authority: General Administration of Customs of China (GACC) · checked 21 October 2026

Eligibility
Overseas producers of aquatic products must be registered with GACC after recommendation by their own country's competent authority (GACC Decree 248, in force since 1 January 2022).
Before arrival
Confirm the registration number, product scope and labelling with your Chinese importer and customs broker before shipping.
Certificates
An official certificate agreed between the two countries' authorities may be required for the product; check the current bilateral requirement.
Traceability
Registered producers must mark the Chinese registration number, or the number approved by their own competent authority, on inner and outer packaging (Decree 248); keep lot records that match it.

Official pages: Regulations on Registration of Overseas Producers of Imported Food (Decree 248), gov.cn — Chinese

Questions buyers ask

What does "export approved" seafood mean?
It usually means the processing establishment appears on the destination's official list (for example the EU list of authorised non-EU establishments) or is registered with the destination authority (for example GACC in China). Approval is per destination and per plant, so ask for the establishment number and check the current official list for each order.
How much shrimp does the United States import?
In 2024 the US reported US$4.67 billion of frozen shrimp imports (HS 030613, about 584,000 t) plus US$1.66 billion of prepared or preserved shrimp (HS 160520), according to WITS/UN Comtrade. These are customs values, not current prices or demand.
Where is imported shrimp from?
For frozen shrimp in 2024, the largest exporters were Ecuador, India, Indonesia, Argentina and Thailand. India's largest destination was the United States; Ecuador's was China.
What does glazing shrimp mean?
Glazing is a thin layer of ice applied to frozen shrimp to protect it from drying and oxidation. Because the ice adds weight, contracts should state the glaze percentage and whether price, net weight and count are on a de-glazed basis.
Do farmed shrimp need an EU catch certificate?
No. The EU catch certificate scheme covers wild-caught fishery products; aquaculture products obtained from fry or larvae are outside its scope. Farmed shrimp still needs an EU-listed establishment, the official health certificate and pre-notification in TRACES.
Who issues the health certificate?
The competent authority of the exporting country signs the official certificate on the model the destination requires. A seller's own declaration is not a substitute.

Start with a complete specification

FishMatch reviews buyer requests of USD 250,000 or more per annual or seasonal program, free for buyers, and asks producers for the eligibility evidence above before offers are compared. FishMatch does not import, inspect or certify product.

Related: seafood market map · seafood trade data 2024 · seafood export documentation (exporter view) · glossary