FishMatch Group · Buyer guide

How to evaluate seafood, shrimp and aquaculture supplier offers

Compare offers only on the same specification, and label every line by its basis: what the supplier states, what has actually been checked (with the document and date), what is an estimate, and what is missing. An offer is shortlist-ready when the open checks are known — not when the supplier says it is certified, food-safe, sustainable or available.

Published · FishMatch Group procurement team. General guidance; confirm requirements for your product, site and destination.

What makes two supplier offers comparable?

Two offers are comparable only when they answer the same request: the same species and product form or the same design capacity, the same unit and currency, the same Incoterms rule and named place, and the same validity period. If one quote is FOB per kilogram of net weight and another is CFR per carton including glaze, the lower number tells you nothing yet.

Write the specification first, send it to every supplier unchanged, and convert answers to one basis before ranking them. Differences in scope are recorded as differences, not averaged away.

Supplier statement, completed check or estimate — why the label matters

A supplier statement is what the offer says. It is useful, but it is not proof. A completed check means someone looked at evidence — a certificate confirmed with its issuer, a laboratory report, production records, a site visit — and recorded what was seen and when. An estimate is a figure someone calculated, with its basis written down. Missing means the supplier has not answered.

Keeping these four labels separate stops a confident sentence in a quotation from being repeated as fact. It also shows the buyer exactly which checks remain before a decision.

Seafood and farmed fish offers: what to compare

Use the same rows for every offer. The evidence line shows what turns a supplier statement into a completed check.

Species and product form
Each offer must state: Common and scientific name; raw or cooked; whole, fillet, portion; chilled, frozen or live
Evidence: Product specification sheet; sample or inspection report
Grade and size
Each offer must state: Size band and its basis; uniformity; net weight
Evidence: Inspection or count report against the stated basis
Origin
Each offer must state: Country, production area, farmed or wild, processing country
Evidence: Origin documents for the actual lot
Volume and season
Each offer must state: Tonnes per shipment and per programme; harvest windows
Evidence: Harvest or production plan; past shipment records — a statement alone does not show availability
Processing and packaging
Each offer must state: Process steps, treatments, freezing method, inner pack, carton, labelling
Evidence: Plant documentation; packing specification; label proof
Cold chain
Each offer must state: Storage and transport temperatures, monitoring, hand-over points
Evidence: Temperature records and the logistics plan
Food-safety and import documents
Each offer must state: What the destination requires and what the supplier actually provides
Evidence: Certificates confirmed with the issuer; destination requirements confirmed with the competent authority
Quote, currency and Incoterms
Each offer must state: Price unit, currency, validity, Incoterms rule, version and named place
Evidence: Signed quotation on the agreed basis
Lead time
Each offer must state: Order to first shipment, and what it depends on
Evidence: Supplier confirmation tied to the season and capacity

Write the seafood specification first → · Import documents and cold-chain questions →

Shrimp offers: extra checks before a shortlist

  • State the count basis on every line — pieces per pound and pieces per kilogram are not interchangeable — and whether the count is before or after glaze.
  • Separate net weight from glaze. Ask for the glaze percentage and how net weight is declared on the carton.
  • Name the product form precisely: head-on, headless, shell-on, peeled and deveined, peeled undeveined, tail-on; raw or cooked; IQF or block frozen.
  • Use the scientific name. Different shrimp species are not substitutes in a specification.
  • Treat “antibiotic-free”, “residue-free” or “certified” as supplier claims until test reports or certificates for the relevant lot or site have been checked, and confirm which documents your destination actually requires.

Wholesale farmed fish and shrimp buyer checklist →

Aquaculture project and equipment offers: what to compare

Project offers differ most in what they assume. Record the assumption behind each figure, not just the figure.

Capacity
Each offer must state: Design output and its basis (t/yr, kg/m³, juveniles per cycle)
Evidence: Design calculation with stated assumptions
Species fit
Each offer must state: Species and life stages the design is for
Evidence: Documented installations for that species
Site and water assumptions
Each offer must state: Water source, quality, temperature, salinity, flow, site conditions
Evidence: Your own measured data compared with what the offer assumes
Equipment scope
Each offer must state: Included and excluded items, spares, installation, commissioning, training
Evidence: Line-item scope schedule
Operating inputs
Each offer must state: Power, oxygen, feed, water exchange and labour
Evidence: Supplier figures checked against your site and a planning calculator
Compliance documents
Each offer must state: Permits, standards, electrical and pressure certificates, warranties
Evidence: Documents confirmed with the issuer or your engineer
Reference evidence
Each offer must state: Comparable projects or results the supplier can document
Evidence: Reference call or visit notes with date

How to compare RAS quotations → · Supplier comparison evidence → · Total cost of ownership → · RFQ checklist →

Red flags to check before shortlisting

  • A price without a unit, currency, Incoterms rule or validity date.
  • Certificates mentioned but not supplied, or supplied for a different site, product or period.
  • Availability promised without a harvest plan or production record.
  • Capacity quoted without the stocking, water or survival assumptions behind it.
  • Scope that leaves out installation, commissioning, spares or cold storage without saying so.

How FishMatch builds an evidence-led shortlist

FishMatch Group is a buyer-first procurement platform. Buyers use it free; managed requests start at USD 250,000 — total project value for farms and equipment, or total annual or seasonal programme value for seafood.

Our team clarifies the specification, looks for suitable suppliers in different countries, compares their offers on one basis with these evidence labels, and coordinates the next steps. Supplier identities and contact details are shared only with approval.

We do not own farms, stock or factories, and we do not certify products. We do not guarantee availability, quality, food safety, certification, sustainability, price or delivery; buyers and suppliers verify and contract under their own responsibilities.

Supplier offer evaluation questions

How do I compare seafood quotes fairly?

Put every quote on the same specification, unit, currency and Incoterms rule before comparing price. Then compare grade, origin, season, processing, packaging, cold chain, documents and lead time line by line, and note which lines are only supplier statements.

Is a supplier's certificate enough proof?

Only once it has been checked: confirm with the issuer that it is valid for that site, product and period, and record the date you checked. Until then treat it as a supplier statement.

What should a shrimp RFQ include?

Scientific name, product form, count and its basis, glaze and net weight declaration, freezing method, packing, volume per shipment and per programme, delivery window, destination, required documents, Incoterms and currency.

How do I compare aquaculture equipment offers?

Compare the capacity basis, species fit, site and water assumptions, the full scope with exclusions, operating inputs such as power and oxygen, compliance documents and documented references — not only the total price.

What is a shortlist-ready offer?

One that answers the full specification on a comparable basis and whose remaining checks are listed. It does not mean the supplier is approved, the product is available or a deal is agreed.

Does FishMatch share supplier contacts with buyers?

Not directly. Our team handles contact with suppliers and shares identities only with approval. Buyers receive a lettered comparison with the evidence label on each line.