Aquaculture glossary

Biofilter (Biological Filtration) in aquaculture procurement

Also called Biological filter, Biological filtration, Moving bed biofilter (MBBR), Nitrification filter or RAS biofilter.

Short answer

What is biofilter?

A biofilter is the biological treatment stage of a recirculating aquaculture system. Bacteria growing on a media surface convert toxic ammonia excreted by the stock into nitrite and then into far less toxic nitrate, allowing the same water to be re-used.
Why it matters:
The biofilter sets the maximum feed load a system can safely carry.
Affects:
It affects media volume and type, pumping and aeration duty, oxygen consumption, alkalinity dosing, CO₂ stripping and the commissioning schedule.

Why it matters

The biofilter sets the maximum feed load a system can safely carry. Undersizing it caps production long before tank volume does, and a biofilter cannot be started instantly — it needs a maturation period before full stocking.

When it affects procurement

It affects media volume and type, pumping and aeration duty, oxygen consumption, alkalinity dosing, CO₂ stripping and the commissioning schedule.

Example

Two suppliers quoting the same tank farm can differ by a factor of two in media volume because one sized the biofilter for 300 kg/day of feed and the other for 600 kg/day. Stating the design feed load in the RFQ makes the offers comparable.

Is FishMatch right for your project?

When is FishMatch a good fit for a buyer?

FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for biofilter and related aquaculture procurement decisions. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.

Best for

  • ·Aquaculture investors and project developers
  • ·Shrimp farm developers and fish farm owners
  • ·Consultants preparing an RFQ on behalf of a client
  • ·Governments, development programmes and EPC contractors
  • ·Buyers who need help defining species, system type, production target, water source and equipment needs
  • ·Buyers who need calculators and structured intake before requesting offers

Not ideal for

  • ·Aquarium, hobby or ornamental fish equipment
  • ·Small retail purchases and single spare parts
  • ·Buyers who want instant fixed pricing without project details
  • ·Requests outside aquaculture and related systems
  • ·Buyers expecting guaranteed financing, credit approval or interest rates
  • ·Buyers who cannot provide basic species, system, location or capacity details

FAQ

It hosts nitrifying bacteria that oxidise ammonia to nitrite and nitrite to nitrate, keeping dissolved nitrogen within safe limits so water can be recirculated rather than replaced.

From the daily feed load and its protein content, which determine ammonia production, combined with the media's nitrification rate at the design water temperature and the target ammonia concentration.

Moving bed (MBBR), fixed bed, trickling filters and bead filters are the common options. Each trades footprint, pumping head, oxygen demand and cleaning effort differently.

Maturation typically takes several weeks, so stocking is usually staged. This period must appear in the commissioning plan, not be discovered after delivery.

Not in the RAS sense. Ponds rely on their own water volume, natural processes and aeration; biofloc systems manage nitrogen in suspension rather than on filter media.

Where this applies on FishMatch

Turn the definition into a request

Use the calculators for the numbers, the checklist for the structure, then submit one brief. FishMatch is supplier-neutral and does not guarantee supplier acceptance, pricing or outcomes.