How this estimate is calculated
Expansion Readiness Assessment · calculation version 0.9.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate · methodology review pending
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Most commercial farms hit a capacity ceiling in the supporting systems long before they run out of land. Rate the current headroom on nine infrastructure areas and the tool returns a readiness score, a route recommendation (use existing infrastructure, upgrade selected systems, expand physically, or intensify instead) and the systems that should go into an engineering and supplier capacity review before any equipment is ordered.
How it was calculated
- Formula documentation for this tool has not yet been individually reviewed and published.
Where each value comes from
- Planned production increase
- Buyer input
- Water source & intake headroom
- Buyer input
- Pumping & water exchange capacity
- Buyer input
- Aeration / oxygenation headroom
- Buyer input
- Water treatment & effluent capacity
- Buyer input
- Grid capacity & backup generation
- Buyer input
- Feed storage, delivery & feeding system
- Buyer input
- Monitoring, alarms & automation
- Buyer input
- Hatchery / nursery supply capacity
- Buyer input
- Harvest, ice & cold-chain capacity
- Buyer input
- Additional land / water area available
- Buyer input
Limitations
- This tool has not yet passed the documented-methodology review. Treat every output as an unverified planning estimate.
- This is a preliminary planning screen based on your own reported headroom. It is not an engineering audit, a site survey or a capacity certification.
- Flagged systems are areas requiring engineering and supplier capacity review before expansion — not confirmed deficiencies.
- Oxygen, pumping and electrical capacity are the three areas that most often cap a production increase on an otherwise healthy farm.
- Monitoring and alarm coverage should be reviewed whenever standing biomass rises, because the consequence of an undetected event scales with biomass.
- Take the flagged systems into a structured RFQ so suppliers quote against the same scope.
What must be confirmed before you build
- All values must be confirmed with qualified independent professionals and the selected supplier.
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.