Consultant directory

Aquaculture consultant directory — by specialisation

Eight disciplines that commercial fish and shrimp projects actually hire for, what each one owns on a project, and what to have ready before the first call.

Short answer

How do you choose the right aquaculture consultant for a project?

Match the discipline to the decision. Sizing a recirculating system is RAS engineering; pond intensification is shrimp or grow-out advisory; a lender pack is feasibility and financing readiness. Most commercial projects use two or three disciplines in sequence, not one generalist.

Disciplines listed:
8 core aquaculture advisory fields
Names published:
None — the network is confidential
Certification:
FishMatch Group does not certify or rank consultants
Project focus:
Commercial projects from roughly USD $250K

FishMatch Group does not publish the names, websites or contact details of the consultants and suppliers in its network, and does not certify, license or rank consultants. This directory describes the disciplines a commercial fish or shrimp project normally needs and what to prepare before engaging one. Sourcing support is arranged through a human review, not an automatic match.

RAS consultants and system engineers

Also searched as: RAS consultant · recirculating aquaculture system engineer · RAS design consultant

Sizing and specifying a recirculating system: biofilter load, oxygen delivery, degassing, solids removal, flow and turnover, and the equipment scope that follows from it.

Scope this discipline owns
  • Design basis: feed load, TAN production, temperature band, make-up water
  • Tank, flow, biofilter and oxygen sizing before any supplier is priced
  • Equipment specification and battery limits between packages
  • Bid comparison on identical sizing assumptions
Prepare before the first call
  • Target annual tonnage and species
  • Site water source, quality and available power
  • Building or site footprint constraints

Shrimp farm consultants

Also searched as: shrimp farm consultant · vannamei farm consultant · biofloc consultant

Pond and lined-pond vannamei production, intensification, aeration strategy, biofloc or clear-water operation and the equipment budget that supports the stocking plan.

Scope this discipline owns
  • Stocking density, aeration demand and water exchange plan
  • Liner, aerator, pump and monitoring scope
  • Harvest and post-harvest handling flow
  • Survival and FCR assumptions written down as assumptions
Prepare before the first call
  • Pond count, surface area and depth
  • Target cycles per year and stocking density
  • Grid power or generator situation

Hatchery consultants

Also searched as: shrimp hatchery consultant · fish hatchery consultant · larval rearing specialist

Fish and shrimp hatchery planning: broodstock, maturation, larval tanks, live feed, water treatment and the biosecurity regime the equipment has to support.

Scope this discipline owns
  • Tank plan against target fry or post-larvae output
  • Live feed, water treatment and heating scope
  • Biosecurity zoning and disinfection requirements
  • Lot-by-lot RFQ split so specialists quote their own scope
Prepare before the first call
  • Target output per cycle and cycles per year
  • Species and source of broodstock
  • Water source and required treatment level

Pond, cage and grow-out advisors

Also searched as: fish farm consultant · tilapia farm consultant · cage farming consultant

Earthen pond, lined pond, cage and flow-through grow-out: carrying capacity, aeration, feeding regime and the civil and equipment split.

Scope this discipline owns
  • Carrying capacity and oxygen demand at peak biomass
  • Aeration or current-driven oxygen strategy
  • Cage, mooring and net specification where relevant
  • Feeding, grading and harvesting equipment scope
Prepare before the first call
  • Water body or pond area and depth
  • Species, target harvest weight and cycle length
  • Temperature range across the year

Water treatment and aeration specialists

Also searched as: aquaculture water treatment consultant · aeration specialist · water quality consultant

Intake, filtration, disinfection, effluent and aeration design — the part of a project most often under-scoped in a supplier quotation.

Scope this discipline owns
  • Raw water analysis and required treatment train
  • UV, ozone, filtration and degassing specification
  • Oxygen transfer requirement and energy per kg O₂
  • Effluent and discharge compliance scope
Prepare before the first call
  • Water analysis results if available
  • Discharge permit conditions
  • Electricity tariff for energy comparison

Processing and cold-chain consultants

Also searched as: seafood processing consultant · cold chain consultant · fish processing line design

Primary processing, chilling, freezing, ice supply and cold storage sized against the harvest calendar rather than a single peak day.

Scope this discipline owns
  • Throughput basis from the monthly harvest profile
  • Hygienic design and traceability for the destination market
  • Refrigeration load, water and power demand
  • Like-for-like comparison at identical shift patterns
Prepare before the first call
  • Harvest calendar by month
  • Product formats and target markets
  • Available utilities on site

Feasibility and financing-readiness advisors

Also searched as: aquaculture feasibility study consultant · aquaculture business plan consultant

Production and cost modelling, CAPEX and OPEX structure, and assembling documentation a lender or investor can actually read.

Scope this discipline owns
  • Production model, FCR and cost per kilogram assumptions
  • CAPEX build-up with exclusions written down
  • Single-currency, single-incoterm cost summary
  • Document checklist for independent financing providers
Prepare before the first call
  • Existing quotes, even if incomplete
  • Land, permit and offtake status
  • Equity available and financing amount sought

Procurement, EPC and turnkey advisors

Also searched as: aquaculture procurement consultant · turnkey aquaculture project advisor

Package splits, RFQ structure, interface management and vendor comparison for turnkey or multi-lot builds.

Scope this discipline owns
  • Lot structure and interface matrix
  • One RFQ text, one incoterm, one currency for every bidder
  • Scope-gap list per offer instead of estimated extras
  • Total evaluated cost including freight, duties and commissioning
Prepare before the first call
  • Design basis or specification, if it exists
  • Delivery deadline and site readiness date
  • Any suppliers you already want invited

Regional context

The discipline you need is usually the same everywhere; the constraints are not. These are the project patterns we see most often by region.

Latin America

Shrimp pond intensification, tilapia grow-out, hatchery and processing projects.

Europe

RAS grow-out, land-based salmon and trout, water reuse and permitting-heavy sites.

Middle East & North Africa

Desert RAS, seawater intake, shrimp and seabass projects with water-cost constraints.

Sub-Saharan Africa

Pond and cage tilapia, catfish, feed supply and cold-chain gaps.

South & Southeast Asia

Vannamei ponds, biofloc, hatcheries, processing and export compliance.

North America

Indoor RAS, retrofit and expansion projects with lender documentation needs.

Join the network

Apply as a consultant, or send a client project

One form for both. Tell us your discipline and, if you have a live project, its scope. A person reads every submission — no public profile is created and your client is not contacted unless you ask us to.

FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities

About you

About you

Questions

What kind of aquaculture consultant do I need?

It depends on the decision in front of you. Sizing a recirculating system needs a RAS engineer; a pond intensification plan needs a shrimp or grow-out advisor; a lender pack needs a feasibility and financing-readiness advisor. Each discipline below lists the scope it normally owns.

Does FishMatch Group publish consultant names and contact details?

No. The network is confidential: no names, websites, emails or phone numbers are published for consultants or suppliers. Introductions are arranged case by case after a human review, and only with the agreement of both sides.

Are the consultants certified or ranked by FishMatch Group?

No. FishMatch Group does not license, certify or rank consultants and is not a consultancy itself. The directory describes disciplines and scope so a buyer can brief the right specialist.

How can a consultant join the network?

Use the form on this page or the partner program page. Every application is read by a person; there is no automatic listing and no public profile is created.

What does an aquaculture consultant normally cost?

Fees are set by each consultant, not by FishMatch Group, and vary widely by discipline, country and scope. Work is usually quoted as a day rate, a fixed fee per deliverable such as a feasibility study or RAS sizing basis, or a retainer across a build. Define the deliverable before asking for a fee, otherwise proposals are not comparable.

Do I need a RAS consultant, or can the equipment supplier design the system?

A supplier will size a system around the equipment it sells, which can be perfectly sound but is not independent. An independent RAS engineer writes the design basis — biomass, feed load, TAN, oxygen, turnover and redundancy — before suppliers quote, so every offer answers the same brief and can be compared.

What should I prepare before speaking to an aquaculture consultant?

Species and target annual production, intended market and harvest weight, the site's water source and temperature profile, available power, land or lease status, permitting position, indicative budget and the decision you need help with. The RFQ readiness check and the buyer profile builder produce most of that in one pass.

Can a consultant work on projects outside their home country?

Most do. What matters is whether the discipline transfers: RAS engineering and water treatment travel well, while permitting, species licensing and local construction practice usually need someone in-country alongside the specialist. Many projects use both.