Consultant case studies

Aquaculture consultant case studies — how the sourcing and RFQ work runs

Five project-style walkthroughs: a RAS grow-out tender, a shrimp hatchery split into lots, a pond aeration retrofit, a financing readiness pack and a processing and cold-chain line.

Short answer

What does a consultant get from the FishMatch sourcing and RFQ process?

One design basis fixed before suppliers are contacted, one RFQ text issued to every bidder, offers re-tabulated line by line on identical scope and incoterms, and a written scope-gap list per offer. The consultant presents the shortlist and keeps the client relationship.

Walkthroughs:
5 project types
Client or supplier names:
None published
Claimed savings:
None — process only
Decision:
Stays with the consultant and client
Project-style walkthroughs

What the sourcing and RFQ workflow looks like on a real project

Five common consultant situations, written up the way the work actually runs: what is fixed before suppliers are contacted, how the RFQ is issued, how offers are made comparable, and what the consultant receives at the end.

These are illustrative workflow walkthroughs, not client testimonials or case results. They describe how a project of this type moves through the sourcing and RFQ process. No client, supplier or price data is published, and no savings, delivery or performance outcome is claimed.

Workflow walkthrough 01

RAS grow-out tender — comparing four systems on one design basis

A consultant holds a client brief for an indoor recirculating grow-out unit but has quotes that cannot be compared: different biofilter sizing assumptions, different oxygen scope, different incoterms.

Project type
Indoor RAS grow-out
Consultant input
Target annual tonnage, species, water temperature, site power
Suppliers invited
4 (2 consultant-nominated, 2 added from the sourcing desk)
Client identity
Withheld from suppliers throughout
How it runs
  1. 1 · Design basis fixed first

    Feed load, TAN production, make-up water percentage, temperature band and oxygen delivery method are written down before any supplier is contacted, so every quote answers the same question.

  2. 2 · Private RFQ issued

    The same scope-of-supply, battery limits, incoterms and warranty text goes to every invited supplier. The consultant's own suppliers are added to the same package.

  3. 3 · Offers normalised

    Offers are re-tabulated line by line: biofilter media volume, degassing, oxygenation, drum filtration, controls, spares, commissioning days, freight and duties.

  4. 4 · Gaps sent back

    Missing lines — instrumentation, alarm redundancy, commissioning scope — go back to the supplier as written clarifications instead of being estimated.

What the consultant receives
  • One comparison table on identical scope and incoterms
  • Written scope-gap list per offer
  • Total evaluated cost including freight, duties and commissioning
  • Consultant-branded summary the client can read without supplier identities

The consultant presents the shortlist. Supplier selection stays with the consultant and the client.

Workflow walkthrough 02

Shrimp hatchery package — splitting one lump-sum quote into comparable lots

A hatchery expansion arrives as a single lump-sum offer with no line detail, making it impossible to advise the client or take it to a lender.

Project type
Shrimp hatchery expansion
Consultant input
Tank plan, target PL output, biosecurity requirements
RFQ structure
Split into 5 lots (tanks, water treatment, aeration, live feed, controls)
Suppliers invited
3 per lot
How it runs
  1. 1 · Lot breakdown

    The single package is decomposed into lots that suppliers can quote accurately, each with its own battery limits and interface points.

  2. 2 · Parallel RFQs

    Each lot goes out separately so specialised suppliers compete on their own strength rather than sub-contracting a scope they do not build.

  3. 3 · Interface check

    Lot boundaries are checked against each other so nothing is quoted twice and nothing falls between two suppliers.

  4. 4 · Reassembly

    Lots are recombined into one client-facing cost structure with the interface responsibilities written down.

What the consultant receives
  • Five lot-level comparison tables
  • Interface and battery-limit matrix
  • Consolidated project cost structure
  • Documented list of exclusions per lot

Lot splitting is a procurement method, not a guarantee of a lower price. Some projects are better served by a single integrator.

Workflow walkthrough 03

Pond farm aeration retrofit — sizing before shopping

A client asks for aerator prices. The consultant does not yet have a defensible oxygen demand figure, so any quote received would be arbitrary.

Project type
Earthen pond aeration retrofit
Consultant input
Pond surface area, stocking plan, temperature range, grid power
Tool used
Aeration sizing and stocking density calculators
Suppliers invited
3, after sizing is agreed
How it runs
  1. 1 · Oxygen demand first

    Standard oxygen transfer requirement is calculated from biomass, temperature and feed load using published aeration relationships, with the assumptions written into the RFQ.

  2. 2 · Equipment-neutral spec

    The RFQ asks for kg O₂/h delivered at site conditions and kWh per kg O₂ — not for a brand or a model number.

  3. 3 · Energy compared, not just price

    Offers are compared on installed cost plus modelled annual energy at the client's tariff, because aeration is an OPEX decision.

  4. 4 · Service reality check

    In-region spares and service capability are requested in writing before shortlisting.

What the consultant receives
  • Documented oxygen demand basis with assumptions
  • Performance-based specification the client can reuse
  • Cost plus modelled energy comparison
  • In-region service and spares confirmation per supplier

Calculator outputs are planning estimates for scoping and RFQ preparation, not engineering design or a guarantee of performance.

Workflow walkthrough 04

Financing readiness — turning a quote pile into a lender-readable pack

A client wants equipment financing. The documentation exists but is scattered across emails, currencies and incoterms, so lenders send it back for clarification.

Project type
Equipment package with external financing
Consultant input
Quotes, project plan, delivery timetable
Tool used
RFQ readiness score and financing eligibility estimator
Financing role
Introduction to independent providers only
How it runs
  1. 1 · Readiness scored

    Scope definition, quote comparability, timeline realism and documentation completeness are scored so the weakest item is fixed first.

  2. 2 · Currency and incoterms aligned

    All offers are restated in one currency and one incoterm so the financed amount is unambiguous.

  3. 3 · Missing documents listed

    Proforma invoices, delivery schedules, warranty terms and payment milestones are requested from suppliers in one round instead of five.

  4. 4 · Introduction, not approval

    The pack is handed to the consultant, who decides which independent financing providers to approach.

What the consultant receives
  • Readiness score with prioritised fix list
  • Single-currency, single-incoterm cost summary
  • Document checklist with status per item
  • Payment-milestone and delivery timetable draft

FishMatch Group is not a lender and makes no credit decision. Financing introductions are to independent providers, and approval, pricing and terms are theirs alone.

Workflow walkthrough 05

Cold chain and processing line — matching capacity to the harvest curve

A processing line is quoted at a throughput that does not match the client's actual harvest profile, which would leave the line idle for most of the year.

Project type
Primary processing and cold chain
Consultant input
Harvest calendar, product formats, target markets
Constraint
Export destination hygiene and traceability requirements
Suppliers invited
4 across line, chilling and cold store
How it runs
  1. 1 · Harvest curve, not peak day

    Required throughput is derived from the monthly harvest profile and shift pattern rather than from a single peak-day number.

  2. 2 · Destination requirements written in

    Hygienic design, materials and traceability requirements for the target export market are stated in the RFQ text so they are priced, not assumed.

  3. 3 · Utilities checked early

    Refrigeration load, water and power demand are requested from each supplier so the site's utility limits are checked before selection.

  4. 4 · Comparison on identical shift basis

    Every offer is compared at the same shifts per day and days per year so throughput claims are directly comparable.

What the consultant receives
  • Throughput basis tied to the harvest calendar
  • Requirements matrix for the target export market
  • Utility demand summary per offer
  • Like-for-like throughput and cost comparison

Compliance with destination-market requirements is verified by the client and the relevant authority; the RFQ only ensures those requirements are quoted against.

Questions

Are these real client case studies?

No. They are illustrative workflow walkthroughs that describe how a project of each type moves through sourcing and RFQ comparison. No client names, supplier names, prices or performance results are published.

Why are no savings or delivery results claimed?

Because outcomes depend on the project, the market and the client's own decisions. What is shown instead is the process: what is fixed before suppliers are contacted, how the RFQ is issued, and how offers are made comparable.

Who does the supplier selection?

The consultant and their client. FishMatch Group prepares the comparison and the scope-gap list; the decision stays with the consultant.

Working on behalf of a client?

Send us one fish, shrimp, hatchery or RAS project and we will help evaluate sourcing options — supplier shortlist, RFQ preparation and quotation comparison. Your client relationship stays with you.