Find an aquaculture consultant by country and species
Pick your species and country. You get the disciplines a project of that type needs, in the order they are normally engaged, and what to prepare before the first conversation.
Short answer
Which aquaculture consultant does my project need?
It depends on the species and the stage, not the country. A shrimp pond project needs a shrimp farming advisor and a water treatment specialist; a land-based salmon project needs RAS engineering first. The country changes permitting, energy cost, duties and in-region service — not the discipline.
Species covered:
8 groups, from vannamei to marine finfish
Disciplines:
8 advisory fields
Names published:
None — network is confidential
Cost to search:
Free; no account needed
Search
Vannamei shrimp
Typical systems: Earthen or lined ponds, biofloc, shrimp RAS. Aeration energy and survival assumptions drive both the equipment list and the cost per kilogram.
Disciplines this project usually needs, in order
Step 1
Shrimp farm consultants
Pond and lined-pond vannamei production, intensification, aeration strategy, biofloc or clear-water operation and the equipment budget that supports the stocking plan.
Scope
Stocking density, aeration demand and water exchange plan
Fish and shrimp hatchery planning: broodstock, maturation, larval tanks, live feed, water treatment and the biosecurity regime the equipment has to support.
Scope
Tank plan against target fry or post-larvae output
FishMatch Group does not publish the names, websites or contact details of the consultants and suppliers in its network, and does not certify, license or rank consultants. This directory describes the disciplines a commercial fish or shrimp project normally needs and what to prepare before engaging one. Sourcing support is arranged through a human review, not an automatic match.
Next step
Tell us the project and we arrange the right people
Send the project once. A person reads it, tells you which disciplines it genuinely needs, and arranges introductions only where both sides agree. Nothing is auto-matched and your details are not shared with suppliers without your consent.
Questions
How do I find an aquaculture consultant for my country and species?
Start from the project, not the person. Choose the species and the country above and the page shows which disciplines a project of that type normally needs, in what order, and what to prepare for each. You can then send the project for human review and we arrange the introduction that fits.
Can I see consultant names and contact details here?
No. FishMatch Group keeps its consultant and supplier network confidential — no names, websites, emails or phone numbers are published. Introductions are arranged case by case, with both sides' agreement.
Do I need a consultant before submitting an RFQ?
Not always, but you do need a design basis. If your production target, water source, oxygen demand and treatment level are already written down, you can go straight to the RFQ. If not, a sizing specialist first will save a round of unusable quotes.
Does the country change which consultant I need?
It changes the constraints more than the discipline. Permitting, water cost, energy tariffs, import duties and in-region service availability differ sharply by country, and they shape both the specification and who can realistically support the site.