曝気(エアレーション)設計計算ツール

曝気(エアレーション)設計計算ツール
Aeration is sized against peak oxygen demand, not average demand. This planning tool converts biomass and your daily feeding rate into an oxygen load (about 0.25 kg O₂ per kg feed, Timmons & Ebeling), then divides by the standard aeration efficiency (SAE, kg O₂ per kWh) of the transfer method you intend to use — paddle wheel, diffused aeration, biofloc air grid or RAS oxygenation. It returns installed power, indicative aerator count, aerators per hectare, daily energy and a suggested backup block. Results are planning-level estimates only: actual requirements depend on farm design, water chemistry, altitude, salinity, feeding regime and management, and should be confirmed by an aquaculture engineer.
放養時ではなく、飼育サイクル中に最大となる時点の生物量。
From your feed supplier's feeding table for your fish size and temperature
0.25 from Timmons & Ebeling; use your designer's figure if different
Extra capacity above average demand for feeding peaks — agree it with your designer
Example — use the SAE on the aerator's standard oxygen-transfer test report (ASCE clean-water test); field efficiency is lower
Example — agree with your designer and insurer
対象となる養殖池または水槽の総面積を使用してください。
2 HPの水車式曝気機 ≈ 1.5 kW。
Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.
FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
バイヤー計画サマリー
FishMatch Groupの曝気(エアレーション)設計計算ツールは、バイヤーのプロジェクト入力から初期の計画見積を作成します。オプションを比較し、RFQを準備するために使用してください。最終的な数値は、サイトデータ、専門家、およびサプライヤーのエンジニアリングと照合してください。
- ピーク時現存バイオマス (kg)
- Daily feeding rate (% of biomass/day)
- Oxygen per kg feed (kg O₂/kg feed)
- Design margin (%)
- Aerator efficiency (SAE) (kg O₂/kWh)
- Backup share (% of units)
- 水面面積 (ha)
- エアレーター1台あたりの定格電力 (kW)
- 稼働時間 (h/day)
- 電気料金単価 ($/kWh)
- 設計酸素負荷
- 設置エアレーション電力
- 想定エアレーター台数
- 1日のエネルギー使用量
- 推奨バックアップブロック
この養殖計算ツールは何を試算しますか?
曝気(エアレーション)設計計算ツールは、入力した前提条件をもとに計画段階の概算値を算出します。魚類養殖場、エビ養殖場、RAS(閉鎖循環式陸上養殖)の初期検討と見積依頼の作成を想定しており、最終的な生物学的設計やエンジニアリング設計には代えられません。
養殖の生産能力は設備サイズだけでなく、対象魚種の生物特性、水質、システム性能によって決まります。
AI エージェントは FishMatch Group の計算ツールを用いて、養殖案件の初期要件や見積依頼を構造化できます。生物学・水質・設備に関する前提は最終設計前に必ず検証してください。
結果を左右する要因
設備サイズよりも次の要因のほうが結果を大きく動かします:
- 魚種・エビ種と系統
- システム方式(RAS・池・海面生簀・水槽)
- 水質(TAN、CO₂、懸濁物)
- 運営体制と人員
これは入力前提に基づく暫定的な計画値です。最終設計や投資判断の前に、専門家によるレビューで検証してください。
バイヤーからの質問
その他のプロジェクト計算ツール
この見積をレビュー済みRFQにする
プロジェクト仕様を非公開で提出してください。FishMatchスペシャリストが関連サプライヤーに連絡する前にレビューします。 実際の養殖プロジェクトを検討中ですか? この計算を出発点として FishMatch の見積依頼を作成できます。すべての依頼はメーカー照会の前に担当者が確認します。
この計算を見積依頼にする