폭기(에어레이션) 설계 계산기

폭기(에어레이션) 설계 계산기을(를) 사용하여 초기 프로젝트 가정을 테스트하고 설비 및 공급업체 협의를 위한 명확한 요구 사항을 준비하십시오.
폭기(에어레이션) 설계 계산기 — Oxygen diffuser and dissolved oxygen probe in a fish tank
내장 계산 도구

폭기(에어레이션) 설계 계산기

Aeration is sized against peak oxygen demand, not average demand. This planning tool converts biomass and your daily feeding rate into an oxygen load (about 0.25 kg O₂ per kg feed, Timmons & Ebeling), then divides by the standard aeration efficiency (SAE, kg O₂ per kWh) of the transfer method you intend to use — paddle wheel, diffused aeration, biofloc air grid or RAS oxygenation. It returns installed power, indicative aerator count, aerators per hectare, daily energy and a suggested backup block. Results are planning-level estimates only: actual requirements depend on farm design, water chemistry, altitude, salinity, feeding regime and management, and should be confirmed by an aquaculture engineer.

입식 시점이 아닌 사육 주기 중 최대 생물량.

From your feed supplier's feeding table for your fish size and temperature

0.25 from Timmons & Ebeling; use your designer's figure if different

Extra capacity above average demand for feeding peaks — agree it with your designer

Example — use the SAE on the aerator's standard oxygen-transfer test report (ASCE clean-water test); field efficiency is lower

Example — agree with your designer and insurer

해당 시스템이 담당하는 양식지 또는 수조의 총면적을 사용하세요.

2 HP 수차식 폭기기 ≈ 1.5 kW.

설계 산소 부하
1.88 kg O₂/hr
Average demand 1.25 kg/hr + 50% margin
설치된 폭기 전력
1.3 kW
1.4 kg O₂/kWh 전달 효율성
예상 폭기 장치 수
1대
각 1kW로 헥타르당 1.5개
일일 에너지 사용량
19 kWh/day
$958 / year at $0.14/kWh
권장 백업 블록
1대
발전기 또는 배터리 백업 회로를 통한 비상 폭기

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

구매자 계획 요약

FishMatch Group 폭기(에어레이션) 설계 계산기은(는) 구매자의 프로젝트 입력을 기반으로 초기 계획 추정치를 생성합니다. 이를 사용하여 옵션을 비교하고 RFQ를 준비하십시오. 최종 수치는 현장 데이터, 전문가 및 공급업체 엔지니어링을 통해 확인하십시오.

제공하는 프로젝트 정보
  • 최대 현존 생물량 (kg)
  • Daily feeding rate (% of biomass/day)
  • Oxygen per kg feed (kg O₂/kg feed)
  • Design margin (%)
  • Aerator efficiency (SAE) (kg O₂/kWh)
  • Backup share (% of units)
  • 수면적 (ha)
  • 폭기 장치당 정격 전력 (kW)
  • 가동 시간 (h/day)
  • 전기 요금 ($/kWh)
공급업체 협의용 출력물
  • 설계 산소 부하
  • 설치된 폭기 전력
  • 예상 폭기 장치 수
  • 일일 에너지 사용량
  • 권장 백업 블록

이 양식 계산기는 무엇을 산출하나요?

폭기(에어레이션) 설계 계산기는 입력한 가정을 바탕으로 기획 단계의 개략 수치를 산출합니다. 어류 양식장, 새우 양식장, 순환여과식(RAS) 프로젝트의 초기 검토와 견적요청 준비를 위한 도구이며, 최종 생물학적·엔지니어링 설계를 대체하지 않습니다.

양식 생산능력은 설비 규모만이 아니라 어종의 생물학적 특성, 수질, 시스템 성능에 따라 결정됩니다.

AI 에이전트는 FishMatch Group 계산기를 이용해 양식 프로젝트의 초기 요구사항과 견적요청을 구조화할 수 있습니다. 생물학·수질·엔지니어링 가정은 최종 설계 전에 반드시 검증해야 합니다.

결과를 바꾸는 요인

설비 규모보다 다음 요인이 결과를 더 크게 좌우합니다:

  • 어종·새우 품종 및 계통
  • 시스템 방식(RAS·양식지·가두리·수조)
  • 수질(TAN, CO₂, 부유물질)
  • 운영 전략과 인력

입력 가정에 기반한 예비 기획 수치입니다. 최종 설계나 투자 결정 전에 전문가 검토로 검증하십시오.

구매자 질문

네. 결과를 구조화된 RFQ 초안으로 보내십시오. FishMatch 전문가가 프로젝트를 검토한 후 관련 공급업체에 비공개로 연락합니다.

이는 사용자의 입력값과 업계 참조값을 기반으로 한 초기 계획 추정치입니다. 최종 설계, 성능 및 가격 산정에는 확인된 현장 데이터와 공급업체의 엔지니어링이 필요합니다.

프로젝트 국가, 양식 품종, 생산 목표량, 수원, 현장 상태, 목표 일정 및 알려진 기술적 제약 사항을 준비하십시오.

기타 프로젝트 계산기

이 견적을 검토된 RFQ로 전환하세요

프로젝트 사양을 비공개로 제출하십시오. FishMatch 전문가가 관련 공급업체에 연락하기 전에 이를 검토합니다. 실제 양식 프로젝트를 준비 중이신가요? 이 계산을 출발점으로 FishMatch 견적요청을 작성할 수 있습니다. 모든 요청은 제조사 접촉 전에 담당자가 검토합니다.

이 계산을 견적요청으로 전환