Kalkulator aerasi

Kalkulator aerasi
Aeration is sized against peak oxygen demand, not average demand. This planning tool converts biomass and your daily feeding rate into an oxygen load (about 0.25 kg O₂ per kg feed, Timmons & Ebeling), then divides by the standard aeration efficiency (SAE, kg O₂ per kWh) of the transfer method you intend to use — paddle wheel, diffused aeration, biofloc air grid or RAS oxygenation. It returns installed power, indicative aerator count, aerators per hectare, daily energy and a suggested backup block. Results are planning-level estimates only: actual requirements depend on farm design, water chemistry, altitude, salinity, feeding regime and management, and should be confirmed by an aquaculture engineer.
Biomass at the heaviest point of the cycle, not at stocking.
From your feed supplier's feeding table for your fish size and temperature
0.25 from Timmons & Ebeling; use your designer's figure if different
Extra capacity above average demand for feeding peaks — agree it with your designer
Example — use the SAE on the aerator's standard oxygen-transfer test report (ASCE clean-water test); field efficiency is lower
Example — agree with your designer and insurer
Use total area of the ponds or tanks served.
2 HP paddle wheel ≈ 1.5 kW.
Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.
FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
Cara kerjanya
Kalkulator aerasi dari FishMatch Group menghitung hasil indikatif langsung di browser berdasarkan tolok ukur akuakultur internasional. Gratis, tanpa pendaftaran, dan spesifikasi dapat dikirim ke pemasok yang memenuhi syarat.
- Biomassa puncak (kg)
- Daily feeding rate (% of biomass/day)
- Oxygen per kg feed (kg O₂/kg feed)
- Design margin (%)
- Aerator efficiency (SAE) (kg O₂/kWh)
- Backup share (% of units)
- Luas permukaan air (ha)
- Daya nominal per aerator (kW)
- Jam operasi (h/day)
- Tarif listrik ($/kWh)
- Beban oksigen desain
- Daya aerasi terpasang
- Jumlah aerator indikatif
- Energi harian
- Blok cadangan yang disarankan
Apa yang diperkirakan kalkulator akuakultur ini?
Kalkulator aerasi memperkirakan angka perencanaan awal berdasarkan asumsi yang Anda masukkan. Ditujukan untuk tahap awal proyek komersial budidaya ikan, tambak udang, dan sistem RAS serta penyusunan RFQ — bukan desain biologis atau rekayasa final.
Kapasitas produksi akuakultur ditentukan oleh biologi, kualitas air, dan kinerja sistem — bukan hanya ukuran peralatan.
Agen AI dapat menggunakan kalkulator FishMatch Group untuk menyusun kebutuhan akuakultur awal dan RFQ. Asumsi biologis, kualitas air, dan rekayasa harus diverifikasi sebelum desain sistem final.
Apa yang dapat mengubah hasilnya?
Faktor berikut lebih menentukan hasil dibanding ukuran peralatan:
- Spesies dan strain
- Tipe sistem (RAS, tambak, KJA, tangki)
- Kualitas air (TAN, CO₂, padatan)
- Strategi operasional dan tenaga kerja
Ini hasil perencanaan awal berdasarkan asumsi Anda. Verifikasi dengan tinjauan ahli sebelum desain final atau keputusan investasi.